• Title/Summary/Keyword: 주상복합

Search Result 263, Processing Time 0.023 seconds

Analysing the Management Efficiency Strategy of State-Owned Enterprises (공기업의 경영 효율화 전략에 관한 연구)

  • Ju, Sang Hyeon;Lee, Soon Ho
    • Journal of Digital Convergence
    • /
    • v.12 no.4
    • /
    • pp.93-102
    • /
    • 2014
  • Recently, a lot of effort has been made to reinforce the profitability of the company through successful overseas expansion as one of the major ways to secure the competitiveness and to increase the business value these days. So, this study aims to try to analyse of the status of the overseas expansion case for the recent power industry through the case of the Korea Western Power Co., Ltd. as a measure of the management efficiency strategy of the public sector organization, and to present the policy implications about the management efficiency in the future by drawing upon the management efficiency strategy. This paper suggests alternatives as follows: First, the competitiveness should be reinforced through continuous change and innovation and the management efficiency should be developed. Second, the governance system for public-private sector should be constructed. Third, the efficient management of the global human resources is needed. Fourth, the mutual confidence-building through the active contribution to the community activities is required.

A Model on the Stability Analysis of Supporting Structure of Climbing-Type Tower Cranes (상승식 타워크레인 지지구조의 안정성 검토 모델)

  • Ho, Jong-Kwan;Kim, Ah-Young;Kim, Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.190-198
    • /
    • 2008
  • Recently construction equipments have been used in line with building the structures that have become taller, larger and complex. And as the works at the elevated level for apartment and residential-commercial building projects have been on the rise, the number of tower cranes mobilized tends to be increased too. Due to such an increase in using the equipment serves the critical factor for the project management. The climbing-type tower crane, which increases its height following the structure, has been increased and the need for selecting the optimal model has been increasingly Important in securing the stability. The study hereby proposes the model to evaluate the stability of the climbing-type tower crane. The model was designed to assist in selecting the type of crane as well as in developing the design of Collar comprising the 3 types of support member, evaluating the stability and designing the embed. The model proposed is expected to make commitment in selecting the optimal type of equipment and evaluating the support member and embed for enhancing the stability, thereby ultimately enabling to implement the prefect in efficient way.

Smoke Control Performance of a Serial Structure Using "CONTAM" (CONTAM을 이용한 직렬형태 구조의 제연성능 구현에 관한 연구)

  • Kim, Mi-Seon;Seo, Dong-Gil;Gu, Seon-Hwan;Yoo, Young-Min;Song, Young-Joo
    • Fire Science and Engineering
    • /
    • v.33 no.6
    • /
    • pp.53-62
    • /
    • 2019
  • A recent trend shows that more buildings are being constructed as mixed-use (residential and commercial) properties for efficient land use. This has led to an increased frequency in the occurrence of fires and the associated potential risks. In particular, in case of high-rise apartments, at least one of the elevators in each building is installed for evacuation purposes separately from the emergency elevator; therefore, for a combined ancillary room and emergency elevator platform situation, the structure is inevitably in series with the evacuation elevator platform. Thus, a proposal for a new type of ventilation zone based on existing national fire safety codes is required to achieve smoke control performance. To this end, the air egress velocity and differential pressure of each ventilation zone are checked using the "CONTAM" software; further, an alternative is proposed to secure smoke control performance for series structures.

Development Cooling and Dehumidifying System for Greenhouse using Hygroscopic properties of Lithium Bromide Solution (리튬브로마이드 수용액의 흡습성질을 이용한 온실 냉방 및 제습 시스템 개발)

  • Cho, La Hoon;Oh, Kwang Cheol;Lee, Sang Yeol;Joo, Sang Yeon;Park, Sun Yong;Lee, Seo Hyeon;Jeong, In Seon;Lee, Chung Geon;Kim, Dae Hyun
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 2017.04a
    • /
    • pp.79-79
    • /
    • 2017
  • 국내 여름철의 고온다습한 기후환경으로 인하여 온실 내부의 냉방 및 제습이 필수적인데, 온실 냉방 방식 중 증발냉각 시스템이 가장 효율이 높다고 알려져 있다. 하지만 증발냉각 시스템은 건조한 기후 지역에서 발달한 방식으로, 작물의 증산작용으로 인한 온실 내부 습도 상승에 따른 문제점이 발생되어 다습한 여름철 국내 기후에는 반드시 냉각과 제습이 동시에 필요하다. 따라서 증발냉각 방식 중 Fan and Pad 방식과 리튬브로마이드 수용액을 이용한 온실 냉방 및 제습을 위한 복합시스템에 관한 연구가 진행중이다. 현재 리튬브로마이드 수용액 제습 시 발생되는 발열량과 수용액의 무게변화와 같은 수용액의 흡습성질 대한 정확한 지표가 나타나 있지 않다. 이에 연구를 진행하기에 앞서 리튬브로마이드 흡습성질에 관한 데이터 자료가 필요하다고 판단되어 기초실험을 진행하였고, 본 연구에서는 Pilot Scale의 재생 순환시스템을 통해 리튬브로마이드 수용액의 흡습성질을 이용한 재사용 방안을 제시하였고, 시스템 내에서 외부투입공기와 작동유체의 흡습성질에 의한 반응 전후 온도변화 예측 모델을 수립하였다. 따라서 본 연구를 통해 리튬브로마이드 수용액의 흡습성질을 분석하고, 이를 이 용한 재생 순환 시스템에 관한 연구를 진행할 예정이다.

  • PDF

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

Applied cases of advanced construction & engineering technology at Tower Palace III Project (타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례)

  • Wang In-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-213
    • /
    • 2003
  • Tower Palace III project is the highest residential and commercial high-rise complex building in Korea. In order to construct a high-rise building, advanced construction and engineering technology is required. Therefore, with more developed construction and engineering technology based upon accumulated knowledge, construction speed of 13.4 days per floor including finish work was achieved in this project. To achieve this project successfully, three main advanced construction technology were applied: 1) Construction methods for 3-day cycle of structural work and curtain wall, 2) Tact scheduling method for finish work, 3) Management system of material, labor, work, and information. Also, four main engineering technology were applied: 1) New material such as high -flowing concrete and high strength concrete of 800 kgf/cm2, 2) New method such as a pipe-cooling system of a cool water circulating type, 3) Mechanical system such as smart-fan controlling kitchen-ventilation system, 4) Electrical system such as false car system.

  • PDF

Effect of Home Network on Housing Selection (홈네트워크가 주택선택에 미치는 영향)

  • Chung, Jae-Ho;Cho, Su-Hee
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.7
    • /
    • pp.144-152
    • /
    • 2007
  • The home network service which has been set up in the high price residential-commercial composition building of high price is supplied in the general apartment plentifully recently. But it has been supplied without accurate grasp under the aim of the most up-to-date IT industry and the convenient characteristic of life. In this research we research the present condition of network service in domestic and analyze the recognition degree of network service and the need using survey method. We find that the recognition degree is very high and a main considerable factor to purchase a house. However they prefer to be supplied as option rather than as lump. The consumers are ready to pay an addition expense for home network. It explain that they expect considerably home network service and home network system should be developed as considering the various individual characteristics.

Analysis on the Behaviors of Precast Concrete Beam-Column Connections Subject to Cyclic Loading (반복하중을 받는 프리캐스트 콘크리트 건식 보-기둥 연결부의 거동분석)

  • Song, Hyung-Soo;Yu, Sung-Yong
    • Journal of the Korea Concrete Institute
    • /
    • v.18 no.4 s.94
    • /
    • pp.497-506
    • /
    • 2006
  • The precast concrete beam-column connectors for the high-rise office buildings were investigated experimentally in this study. The specimens of general precast beam-column connector which is used in a domestic site, specimen of DDC(dywidag ductile connectors) of Germany, and specimen of DDC with post-tensioning and modified DDC with post-tensioning were constructed and tested to verify the safety. The DDC with and without post-tensioning showed reliable joint strength and ductility but failed in critical inclined shear crackings at the column. The modified one showed better behaviors in tests because they did not show critical column crackings at failure. The use of prestressing did not helpful significantly to increase the strength and ductility of connectors but helpful only to develop self-centering behavior for stability.

An Experimental Study on the Pressure Change in the Type of Elevator Hoistways (엘리베이터 승강로 형식별 압력변동에 관한 실험 연구)

  • Kim, Hak-Joong;Kim, Boem-Gyu;Park, Yong-Hwan;Lim, Chae-Hyun
    • Fire Science and Engineering
    • /
    • v.24 no.3
    • /
    • pp.139-144
    • /
    • 2010
  • Recently, evacuation safety of building resident become the major concern, as the building has been higher and more complicated. Many high-rise multi use buildings are under construction in Korea. Required evacuation time using stairway is longer in high-rise buildings, moreover it is impossible for the disabled to evacuate by using stairway. For this reason the study on the effectiveness of using elevator for evacuation is progressing. This study shows the pressure change in various types of hoistway when elevator is moving. Experiments were performed in 4 different types of hoistway, and showed big difference in pressure change between the type of hoistway. The pressure change in single hoistway that have one car is bigger than that in multi hoistway that have multi cars. The results of this study can be used for the study of elevator piston effect as basic data.

Design and Construction of the Burj Dubai Concrete Building Project (버즈 두바이 콘크리트 건물의 설계와 시공)

  • Abdelrazaq, Ahmad
    • Magazine of the Korea Concrete Institute
    • /
    • v.20 no.6
    • /
    • pp.28-35
    • /
    • 2008
  • The Burj Dubai Project will be the tallest structure ever built by man; when completed the tower will be more than 700 meter tall and more than 160 floors. While the early integration of aerodynamic shaping and wind engineering considerations played a major role in the architectural massing and design of this multi-use/residential tower, where mitigating and taming the dynamic wind effects was one of the most important design criteria, the material selection for the structural systems of the tower was also a major consideration and required detailed evaluation of the material technologies and skilled labor available in the market at the time Concrete was selected for its strength, stiffness, damping, redundancy, moldability, free fireproofing, speed of construction, and cost effectiveness. In addition, the design challenges of using concrete for the design of the structural system components will be addressed. The focus on this paper will also be on the early planning of the concrete works of the Burj Dubai Project.