• Title/Summary/Keyword: 정량요인

Search Result 1,056, Processing Time 0.024 seconds

Shared Value Expectation on Lifelong Education (평생교육에 대한 공유기대가치 연구)

  • Kim, Chul-Ho
    • Journal of Digital Convergence
    • /
    • v.13 no.12
    • /
    • pp.325-336
    • /
    • 2015
  • The purpose of this study is to confirm the components of users' shared value expectation(SVE) on lifelong education through convergent approaches. After reviewing primary data and collecting secondary data with quantitative and qualitative research methodologies, the components of users' SVE on lifelong education were categorized into 10 perspectives, 27 measured variables, and 81 questions. After conducting a confirmatory factor analysis, the latent measurement model was confirmed as reasonable. Internal reliability, construct convergent discriminant validity were also confirmed as reasonable. In a viewpoint that builds interdisciplinary theory, this research may help grasp users' SVE on lifelong education with interdisciplinary approaches. In a strategic viewpoint, this study may contribute to both understanding categorized users' value expectation and planning/executing suitable programs that can meet the expectations. In a managerial viewpoint, this result may help measure the effectiveness of SVE on lifelong education quantitatively.

Valuation of Ecosystem Water Quality Regulation Service Using TMDL (수질오염총량을 이용한 생태계 수질조절 서비스 가치 평가)

  • Lee, Chang Hee;Park, Kyung Ok
    • Journal of Wetlands Research
    • /
    • v.19 no.2
    • /
    • pp.240-245
    • /
    • 2017
  • In this study, we developed a method to assess quantitatively the amount and the economic value of water quality regulating service of ecosystem services. Numbers of species and aquatic organisms such as fish increased because of the improved water, but it was due to complex factors such as water quality regulation services of ecosystems, installation of environmental facilities for water quality treatment, and water quality regulation. Therefore we sought ways to quantitatively estimate the value of ecosystem regulation services. In this study, we propose a method to estimate the quantitative value of water quality regulation service of ecosystem by utilizing the total amount of water pollution. In addition, the economic value evaluation method was proposed by multiplying the estimated the quantitative value of water quality regulation service of ecosystem by the unit cost per unit capacity. Finally, the ecosystem water quality regulation service was estimated by using the evaluation method for BOD and T-P in Nakdong river watershed.

A Value Analysis of Supply Chain Management using Strategic Opportunity Assessment (전략적 기회요인 분석을 이용한 공급망 관리의 효과 분석)

  • Kim, Byeong-Geon;Bae, Jun-Su;Gang, Seok-Ho
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.446-449
    • /
    • 2004
  • 공급망의 전략수립과 설계단계에서는 공급망 전체에 어떠한 기능들이 필요한지를 도출하고, 각 기능들의 효과를 분석할 필요가 있으며, 이런 분석 방법으로 전략적 기회요인 분석(SOA)이 있다. 본 논문에서는 기업의 공급망에서 필요한 기능들을 균형성과지표(BSC)를 이용하여 도출하고, 재고 감소, 매출 신장, 운영비용 감소 등으로 도출된 핵심 성공 요인을 정량적인 성능지표로 나누어서 그 값을 산출하여 효과 분석을 수행한다. 기업의 향후 5년간의 추정 손익계산서 등을 입력 받아 기대효과를 자동으로 산출하고, 그 결과를 웹상에서 수치화된 결과로 보고받을 수 있다. 본 논문에서 제시하는 분석을 통하여 공급망 관리에서의 필수 요소 기능을 도출함으로써 공급망의 전략수립과 설계에 도움을 줄 수 있다.

  • PDF

망원경 제어해석 모형 개발 II. - 소형 망원경의 제어 모델링

  • Gang, Yong-U;Lee, Sang-Hyeon;Na, Ja-Gyeong;Kim, Gwang-Dong
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.36 no.2
    • /
    • pp.129.2-129.2
    • /
    • 2011
  • 망원경을 사용하여 천체를 관측할 때, 망원경은 기계적인 오차, 구동제어 오차 등의 영향을 받는다. 제어를 위하여 천체영상을 획득하는 부분은 시간 지연, 상의 왜곡 등의 영향을 받는다. 더우기, 바람이나 진동 등 예기치 않은 외부적인 요인에 의한 오차가 유발되기도 한다. 이러한 다양한 요인들은 망원경이 천체를 정확히 찾아가고 추적하는 것을 어렵게 만든다. 우리는 추적오차에 주는 영향들을 정량적으로 분석하고 제어에 반영하여 가장 최적의 제어를 할 수 있도록 하고자 한다. 이전 연구에서 김해천문대 독일식 적도의 방식 200mm 망원경과 PLC 기반의 망원경 제어 장치 및 AP8 CCD 카메라를 사용하여, 지향 및 추적 관측 실험을 하였고, 그 결과를 분석하여 경험적 제어 모형을 만들었다(강용우 외, 2010). 이전 연구를 기반으로 이번 연구에서는 제어 전달을 해석적 함수로 시스템의 수학적 모델을 세워, 각 요인들의 영향을 분석하여, 그 내용을 소개하고자 한다.

  • PDF

The Analytic Study Of the Traffic Accident's Injury by Epidemiological Method (역학적 방법에 의한 교통 상해사고 분석 연구)

  • 홍창의;임평남;김진현
    • Journal of Korean Society of Transportation
    • /
    • v.16 no.2
    • /
    • pp.91-98
    • /
    • 1998
  • 본 논문에서 교통 상해사고 위험요인들을 정량화하고, 위험요인들 중 교통 상해사고 원인에 가장 근접한 것이 무엇인가를 밝히려고 했다. 사례-조사 연구방법으로는 의학분야에서 많이 사용되는 환자-대조군 방법론을 채택하였다. 서울, 양평, 천안지역을 대상으로 1007년 중 입원환자를 중심으로 채혈조사와 설문조사를 통해 환자국 총 117건과 도로상에서의 일반운전자를 중심으로 호기 알콜테스트와 설문조사를 통한 대조군 총 483건을 수집하여 분석하였다. 승용차의 경우, 교통 상해사고 발생 위험요인으로 27개 항목들이 추출되고, 그 중 '도로의 부적합' 항목(RRR 값:4.057)을 포함 14개 항목이 교통 상해사고 원인에 가장 근접한 것으로 나타났다. 오토바이의 경우, 마찬가지 방법으로 최종적으로 '면허 보유기간' 항목(RRR값:3.733)을 선두로 하여 총 11개 항목이 교통 상해사고를 일으키는 원인에 가깝다는 결과를 얻었다. 또한, 두 경우 모두 인적 요인에 의한 결과피가 크기 때문에 이에 대한 경찰의 지속적인 단속이 필요함을 알 수 있었고, 상대위험도가 높게 나타난 순서대로 교통안전투자 우선순위에 정하면, 효율적인 교통 상해사고 감소를 기할 수 있으리라는 결론에 도달했다.

  • PDF

Analysis of Impact Factors for the Improvement of Conceptual Cost Estimation Accuracy for Public Office Building (공공청사 개산견적 정확도 향상을 위한 공사비 영향요인 분석)

  • Jo, Yeong-Ho;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.495-506
    • /
    • 2021
  • A Conceptual cost estimate, which is computed in the preliminary step of a project, is important for decision-making by a contractor in terms of the project budget, economic feasibility and validity analysis, and alternative comparisons. Therefore, a high error rate of a prediction model for a conceptual cost estimate can lead to various problems including excessive project expenditures and a delayed break-even point. this study proposed optimal impact factors by configuring quantitative impact factors computable in a preliminary step in various cases(combinations of impact factors). subsequently, the accuracy of different cases was comparatively analyzed by using the cases as input values of a prediction model using regression analysis. when the optimal combination of impact factors proposed in this study and other combination of impact factors were applied to the prediction model, the regression analysis-based prediction model exhibited 0.2-4.7% improvements in accuracy, respectively. the optimal combination of impact factors proposed in this study improved the accuracy of the prediction model of a conceptual cost estimate by removing unnecessary impact factor.

Factors Affecting Reactivity of Various Phenolic Compounds with the Folin-Ciocalteu Reagent (다양한 페놀성 물질과 Folin-Ciocalteu 시약의 반응성에 미치는 영향 요인 평가)

  • Hong, Jung-Il;Kim, Hyun-Jung;Kim, Ji-Yun
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.40 no.2
    • /
    • pp.205-213
    • /
    • 2011
  • The Folin-Ciocalteu (F-C) reagent has been extensively used for quantifying total phenolic contents in many different types of food materials. Since several different procedures of the assay methods using the F-C reagent have been applied, we investigated changes in reactivity of various phenolic compounds with the F-C reagent under three different assay conditions and factors affecting reactivity. Among 10 standard compounds tested, compounds with high hydroxyl density (number of -OH/molecular weight) showed a largely different response according to addition sequence of the F-C reagent or $Na_2CO_3$. Preincubation in $Na_2CO_3$ significantly reduced the reactivity of the phenolic compounds bearing galloyl moiety (e.g. gallic acid, tannic acid, and epigallocatechin-3-gallate) with the F-C reagent, while monophenol compounds including ferulic acid and sinapinic acid were more stable as compared to diphenols. There was little change in response to the F-C reagent of all phenolic compounds incubated in acidic pH; their reactivity except ferulic acid was reduced significantly when incubated in neutral or alkaline pH. Changes in reactivity of gallic acid incubated in $Na_2CO_3$ or neutral/alkaline pH conditions were the most prominent. $H_2O_2$ generated from phenolic compounds did not affect the reaction with the F-C reagents. The present results suggest that reactivity of different phenolic compounds with F-C reagent was affected considerably by different procedures of the assay, and the total phenolic contents could be fluctuated according to standard compounds and assay scheme.

Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

A Study on the Priority Analysis of Work Delay Factors in Steal-frame Work using FMEA (FMEA를 활용한 철골공사 작업지연요인의 중요도에 관한 연구)

  • Lee, Hyun-Chul;Lee, Jae-Hong;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.91-101
    • /
    • 2009
  • The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.

A Modified Real Options Valuation Model for Early Stage Start-Ups in the Game Industry (초기 게임개발사 특성을 고려한 가치평가 모형 연구)

  • Yoo, Changsok;Poe, Baek
    • Journal of Korea Game Society
    • /
    • v.13 no.3
    • /
    • pp.69-76
    • /
    • 2013
  • The financial value of early stage start-up has a tendency to depend more on the non-financial factors, but these are not efficiently reflected in the traditional valuation models. Therefore, most of valuation practices for early stage start-ups heavily relied on the guts of experts. To remedy this, this study suggests a model to directly reflect the non-financial factors especially for the real options approach. Actual process of valuation and the adjustment way were developed considering the characteristics of early stage start-ups in the game industry.