Kim, Jong-jin;Song, Jeong-hun;Han, Jung-won;Lee, Chang-kyu
Journal of the Korea Academia-Industrial cooperation Society
/
v.22
no.2
/
pp.113-118
/
2021
The guided weapon system should ensure economical operation and user safety. In particular, in the case of guided weapon systems developed in the form of a guaranteed bomb, the standards for maintaining reliability considering the long-term storage environment are presented during the development stage, and an optimized inspection cycle is required to maintain this. This study calculated the reliability through a trend test, fitness test, and distribution analysis using a mathematical model based on the maintenance status and shooting results during the inspection period for OO missiles currently in operation for a long time in the military. Through this, it was applied to the inspection period model (Martinez) set during the development stage to determine if the improved inspection period can be utilized. Finally, by synthesizing the data from these studies, a policy management plan was developed according to the extension of the inspection period. The One-Shot system was operated at the inspection period set when it was developed. The study analyzed the actual failure and maintenance data to reset the efficient inspection period.
The Journal of the Convergence on Culture Technology
/
v.6
no.2
/
pp.489-502
/
2020
This study shows the difference between groups with multivariate analysis of fire prevention activities, special investigations of fire safety, and fire safety management according to the management method of apartment houses and the inspection of firefighting facilities. The results of the analysis are as follows. First, there was a significant difference in fire prevention activities according to the quality of inspection of firefighting facilities. This means that fire prevention is high if the fire safety manager's ability to inspect firefighting facilities is excellent and the fire safety inspection is conducted in accordance with national fire safety standards and checklists. Second, there was a significant difference in the fire safety special investigation according to the management method of the apartment buildings. The manual operated by the management entity and the management entity's management and execution help the organization members to expedite work. This expedition of work creates a high possiblity to get a good evaluation from the special investigation of fire safety. Third, analysis of fire prevention activities showed a significant interaction between the inspection of firefighting facilities and the management method of apartment buildings. The analysis shows that that there is a positive correlation between the level of fire prevention and both the fire safety manager's ability to inspect firefighting facilities and the degree to which the inspection is conducted to meet national fire safety standards.
Lee, Suk Bae;Lee, Kihong;Choi, Hyun Min;Lim, Chi Sung
KSCE Journal of Civil and Environmental Engineering Research
/
v.42
no.2
/
pp.281-290
/
2022
In Korea, the number of national facilities for which a safety inspection is mandatory is increasing, and a safer safety inspection method is needed. This study aimed to increase the efficiency of the bridge safety inspection by enabling rapid exterior inspection while securing the safety of inspectors by using drones to perform the safety inspections of bridges, which had mainly relied on visual inspections. For the research, the Youngjong Grand Bridge in Incheon was selected as a test bed and was divided into four parts: the warren truss, suspension bridge main cable, main tower, and pier. It was possible to establish a five-step standard procedure for drone safety inspections. The step-by-step contents of the standard procedure obtained as a result of this research are: Step 1, facility information collection and analysis, Step 2, analysis of vulnerable parts and drone flight planning, Step 3, drone photography and data processing, Step 4, condition evaluation by external inspection, Step 5, building of external inspection diagram and database. Therefore, if the safety inspections of civil engineering facilities including bridges are performed according to this standard procedure, it is expected that these inspection can be carried out more systematically and efficiently.
According to the development of IT technology, various new technologies are being produced. As the complexity of the information system like using the network and convergence devices is increasing, threat and vulnerability against various security problems are increasing even though new IT services provide the convenience of users' accessibility to services. In order to secure the safety of information system, the weakness is being removed through the information protection vulnerability analysis starting from information and communication service construction stage and the system is being prepared for pre-inspection activities about whether the information protection measures were established and applied. In this paper, introduction and current status of each country about advanced check-up systems in the information system are to be identified. Progress direction about the advanced pre-inspection system which is driven by Korea Internet Security Agency and its activation plan to secure the safety are to be suggested.
The Journal of the Convergence on Culture Technology
/
v.6
no.2
/
pp.55-70
/
2020
This study aims to identify the influence of risk-inducing factors and safety inspection on the measures of reducing accidents among workers of building structures in small construction sites. The result can be summarized as follows: First, as for the influence of risk-inducing factors on human factors, preparation for work, disintegrating molds, taking follow-up measures, and keeping records, have statistically significant influences. Therefore, it can be said that safety inspection has a partial mediating effect in the relationship between risk-inducing factors and human factors. Second, as for the influence of risk-inducing factors on facility factors, preparation for work, and taking follow-up measures influenced significantly. This indicates that safety inspection has a partial mediating effect in the relationship between risk-inducing factors and facility factors. Third, as for the influence of risk-inducing factors on management factors, the installation of shores and risk assessment are found to have significant effects. This shows that safety inspection has a partial mediating effect in the relationship between risk-inducing factors and management factors. Fourth, the influence of risk-inducing factors on work factors was significant only in the installation of shores. This indicates that safety inspection has a completely mediating effect in the relationship between risk-inducing factors and work factors. Finally, in the relationship between risk-inducing factors and accident reduction measures, preparation for work, installation of shores, and taking follow-up measures showed significantly positive influences. In contrast, keeping records has a significant negative influence. Thus, safety inspection has a partial mediating effect in the relationship between risk-inducing factors and management factors.
Purpose. The purpose of this study was to analyze the frequency and duration of adjustments after delivery of complete denture according to age, sex, arch with complete denture, insurance coverage of a denture, type of antagonist, the experience of wearing denture, the period of edentulism, and the type of denture base. Materials and methods. For 5 years, medical records of patients aged 65 or older who had treated full dentures were assessed for the frequency and duration of follow-up visits after complete denture delivery. Statistical analysis was performed at the 5% level of significance to analyze the correlation between the frequency and duration of follow-up according to sex, insurance coverage, arch with the complete denture, type of denture base, type of antagonist, experience of wearing a denture, age, and healing period. Results. 247 complete dentures were included in this study. The median frequency of follow-up visits was 3, and the median duration of follow-up was 36 days. Lower dentures had significantly higher frequency of follow-up visits than upper dentures (P = .036). According to the type of antagonist, dentures opposing a complete denture had a significantly higher frequency of follow-up visits than dentures opposing a removable partial denture (P = .016). There was no statistically significant difference in the frequency and duration of adjustments after delivery of complete denture by age, sex, insurance coverage, healing period, the experience of wearing a denture, and type of denture base. Conclusion. Within the limitations of the present study, lower complete dentures or dentures opposing a complete denture had an increased frequency of follow-up visits.
Nam, Seungju;Park, Yurim;Kwon, Sang Wook;Hwang, Yu Shin;Yoon, Heekweon
Journal of Aerospace System Engineering
/
v.15
no.5
/
pp.50-59
/
2021
The need for risk based safety management has been highlighted in accordance with the growth of aviation industry and public interest in aviation safety. Maintenance, Repair and Overhaul (MRO) in aviation industry is defined to guarantee the safety and reliability. Therefore, state's Civil Airworthiness Authority (CAA) has established safety oversight system dedicated for the development of a healthy MRO industry. The study proposed a risk based oversight system considering Korean environment. Based on literature review including analysis of International Civil Aviation Organization guidance and advance system, we identified two organization risks. Organization complexity can be evaluated in accordance with how large the organization is and how complicated the service they provide are. Organization profile is the organization's characteristic related with safety. This study contributes to improving the process of identifying risk of organization and focusing surveillance capabilities on risk areas for efficient management of CAA's resources.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.