A Study on How to Extend The Inspection Period for The One-Shot System |
Kim, Jong-jin
(LIG Nex1)
Song, Jeong-hun (LIG Nex1) Han, Jung-won (LIG Nex1) Lee, Chang-kyu (LIG Nex1) |
1 | Anthony J. Feduccia, Reliability Engineer's Toolkit, p.160, The Rome Laboratory, 1993, pp.123 |
2 | Eugene C. Martinez, Storage Reliability With Periodic Test, p.181-185, IEEE, 1984, pp.184 DOI: https://doi.org/10.1109/rams.1984.764288 DOI |
3 | S. H. Lee, B. J. Yum, Reliability Analysis Procedures for Repairable Systems and Related Case Studies, Master's thesis, Korea Advanced Institute of Science and Technology, Daejeon, Korea, pp.51-59, 2006. |
4 | B. S. Lee, K. S. Lee, D. S. Kim, K. S. Moon, "Certified Missile Rounds Concepts Using Modeling and Simulation", Journal of the korea society for simulation, Vol.18, No.4, pp.95-105, 2009. |
5 | S. H. Jung, S. B. Lee, "A Study on Warranty and Quality Assurance Model for Guided Missiles Based on Storage Reliability", The Korea Reliability Society, Vol.17, No.2, pp.83-91, 2017. |
6 | Y. W. Seo, K. S. Lee, Y. H. Lee, J. Y. Kim, "Reliability Prediction Based on Field Failure Data of Guided Missile", The Korea Reliability Society, Vol.18, No.3, pp.250-259, 2018. DOI: https://doi.org/10.33162/jar.2018.09.18.3.250 DOI |