• Title/Summary/Keyword: 절토부

Search Result 19, Processing Time 0.023 seconds

Evaluation of Stability of Slope with Granite Weathered Soil considering Rainfall Events (강우사상을 고려한 화강풍화토 비탈면의 안정성 평가)

  • Kim, Gyu-Hyeong;Hwang, Eui-Pil;Lee, Kang-Il
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.4
    • /
    • pp.421-429
    • /
    • 2018
  • Purpose: This study conducted a slope stability study considering changes in the ground water level due to rain phenomena and the duration of rainfall, that is for the purpose of analyzing the stability of the slope surface of the cut section, seepage numerical analysis is performed by height of slope and rainfall accident, and the characteristics of rainfall was applied reasonably in order to determine the slope change during rain by analyzing rainfall and rainfall pattern due to climate change. Results: As a result of numerical analysis of stability for slope composed of the granite weathered soils according to the characteristics of rainfall(Uniform Rainfall, US Army Corps., Huff's method - 1/4, 4/4), Conclusion: The higher the slope, the smaller the safety factor of the slope, the smaller the elevation of the ground water level as the rainwater seepage does not reach the underground water level. In addition, the ground water level was assessed to be rose significantly in condition of case 3 Huff's method - 1/4, rain pattern with the largest initial rainfall duration, and the safety factor was analyzed to be small.

A Study on the Improvement of Evaluation Methods for Roadside Slope Revegetation - Focus on the Cut-soil Slope - (도로비탈면 녹화공사 평가방법의 개선 방안 연구 - 절토부 토사를 중심으로 -)

  • Kim, Nam-Choon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.23 no.6
    • /
    • pp.187-200
    • /
    • 2020
  • Despite the eco-friendly route plan, road slopes were collapsed due to road construction, resulting in human and property damage. To solve this problem, the Ministry of Land, Transport and Maritime Affairs established guidelines in 2009 to conduct a test-bed for slope recording considering the conditions of the site and the ecological environment, and divided them into recording quality and economic evaluation. The following results were obtained by analyzing 183 construction methods of cut-soil sections at 60 sites from 2012 to 2018 for road slope afforestation research. Straw net+seedspray, vegetation media spray method 1T, 3T were used the most, and vegetation media spray method 3T(patent) was excellent in quality, and straw net+seedspray was excellent in economics. As a result of analyzing the market unit price and the construction unit price, vegetation media spray method submitted the construction unit price at up to 60% lower than the market unit price. As a result of the analysis of the key factors of the greening method evaluation, the economic assessment had the greatest influence on all evaluation items. Problems in the evaluation method of revegetation were first identified as problems in the allocation of points and secondly as problems in the evaluation criteria. As for the improvement of the economic assessment criteria, the method was proposed to evaluate the same method based on market unit price when the same method was constructed, and not to conduct an economic assessment if there was a difference in market unit price between methods, or to add weight to the scores. Based on the monitoring data of 60 road slopes, this study drew up problems and improvement measures. However, with regard to scoring, research on appropriate scoring is needed by examining the current status.

A Study on The Frost Penetration Depth of Pavement with Field Temperature Data (도로포장 현장계측 온도데이터를 이용한 도로포장체의 동결깊이 연구)

  • Shin, Eun-Chul;Lee, Jae-Sik;Cho, Gyu-Tae
    • International Journal of Highway Engineering
    • /
    • v.13 no.1
    • /
    • pp.21-32
    • /
    • 2011
  • The frost penetration depth of pavement is usually estimated from the freezing index that made temperature data analysis of 30 years and decided the thickness of anti-frost layer. The field monitoring region in study was divided into five regions by freezing index 550~650$^{\circ}C{\cdot}$day, 450~550$^{\circ}C{\cdot}$day and 350~450$^{\circ}C{\cdot}$day. Each region has three-section of road pavement such as cutting area, boundary area of cutting and banking, and lower area of banking. The field monitoring system was established both in the section of anti-frost layer and in the section without anti-frost layer. The data analysis was conducted for determination of frost penetration depth within the paved road by the field monitoring system. The result showed that The temperature of subgrade without anti-frost layer shows below zero in centigrade for the region of freezing index 550~650$^{\circ}C{\cdot}$day, up and down around zero degree in subgrade for the region of freezing index 450~550$^{\circ}C{\cdot}$day, and there is no place existed below zero degree in subgrade for the region of freezing index below 450$^{\circ}C{\cdot}$day. With comparison of field frost penetration depth for the cross-sections of pavement, the cutting area shows the greatest frost penetration depth, and less influence of frost penetration depth for the boundary area of cutting and banking, and the least influenced for the lower area of banking.

Development of Model for Structural Evaluation of Anti-Freezing Layer (동상방지층의 구조적 평가를 위한 모형 개발)

  • Lee, Moon-Sup;Heo, Tae-Young;Park, Hee-Mun;Kim, Boo-Il
    • International Journal of Highway Engineering
    • /
    • v.14 no.3
    • /
    • pp.25-32
    • /
    • 2012
  • The thickness of anti-freezing layer has been empirically determined using the frost depth obtained from the freezing index and has not been generally considered as a structural layer in pavement design procedure. In fact, the anti-freezing layer makes a role in structural layer and enables to reduce the total thickness of pavement system. The objective of this study is to develop the statistical regression model for evaluating the structural capacity of anti-freezing layer using Falling Weight Deflectormeter(FWD) test data in asphalt pavements. The FWD testing was conducted at the embankment, cutting, and boundary area of various test sections to estimate the structural capacity of anti-freezing layer in different foundation condition. It is observed from this testing that the center deflections of pavement structure with anti-freezing layer are smaller than those without anti-freezing layer ranging from 0.4 to 82.6%. To determine the variables of statistical model, the correlation study has been conducted between various FWD deflection indexes and the anti-freezing layer thickness. It is found that the ${\Delta}BDI$(%)(${\Delta}Basin$ Damage Index(%)) is highly correlated with anti-freezing layer thickness. The ${\Delta}BDI$(%) model were developed for evaluating structural capacity of anti-freezing layer using linear mixed-effect models.

Structural assessment of Anti-Freezing Layer with use of Falling Weight Deflectormeter Deflection (Falling Weight Deflectormeter를 이용한 동상방지층의 구조적 특성 분석)

  • Lee, Moon-Sup;Kim, Boo-Il;Jeon, Sung-Il;Park, Hee-Mun
    • International Journal of Highway Engineering
    • /
    • v.12 no.2
    • /
    • pp.99-106
    • /
    • 2010
  • Until now, the thickness design of anti-freezing layer has been empirically conducted using the frost depth determined from the freezing index. This approach cannot consider the structural properties of anti-freezing layer, which can cause the over-design of pavement structure. This paper presents results of structural evaluation of anti-freezing layer using the Falling Weight Deflectormeter (FWD) deflections. The FWD testing was directly conducted on top of the subbase layer located at the embankment, cutting, and boundary area of each section. It is observed from this testing that the center deflections of pavement structure with anti-freezing layer are smaller than those without anti-freezing layer. The deflection reduction rates are 15~55% in the embankment, 11~64% in the cutting, and 2~38% in the boundary, respectively. It was also found that the use of antifree zing layer enables to reduce the Surface Curvature Index (SCI) values up to 24 percent. Fatigue lives show that pavement structure with antifreezing layer are about two times higher than the those without anti-freezing layer. This fact indicates that the anti-freezing layer should be considered as a structural layer in the asphalt pavement system.

The statistical factors affecting the freezing of the road pavement (도로포장체의 동결에 영향을 미치는 통계적 요인)

  • Kim, Hyun-Ji;Lee, Jea-Young;Kim, Byung-Doo;Cho, Gyu-Tae
    • Journal of the Korean Data and Information Science Society
    • /
    • v.27 no.1
    • /
    • pp.67-74
    • /
    • 2016
  • Due to the character of the climate of Korea, the pavement of a road is Influenced by freezing in winter season and thawing in thawing season. In the last few years, several articles have been devoted to the study to minimize the damage of freezing and thawing action. The purpose of this paper is to identify appropriacy of factors that influence road pavement thickness. We conduct the decision tree analysis on the field data of road pavement. The target variable is 'Frost penetration'. This value was calculated from the temperature data. The input variables are 'Region', 'Type of road pavement', 'Anti-frost layer', 'Month' and 'Air temperature'. The region was divided into 9 regions by freezing index $350{\sim}450^{\circ}C{\cdot}day$, $450{\sim}550^{\circ}C{\cdot}day$, $550{\sim}650^{\circ}C{\cdot}day$. The type of road pavement has three-section such as area of cutting, boundary area of cutting and bankin, lower area of banking. As the result, the variables that influence 'Frost penetration' are Month, followed by anti-frost layer, air temperature and region.

Computing Procedure of Daily Average Air Temperature using Field Data and Frost Index Calibration for Anti-Frost Heave Layer Design (현장계측 데이터를 이용한 일평균 대기온도 산정방법과 동상방지층 설계를 위한 동결지수 보정)

  • Cho, Myung-Hwan;Kim, Nakseok;Shim, Jaepill
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.433-439
    • /
    • 2011
  • The frost depth(frost penetration) is used to install anti-frost heave layers in pavement designs. The freezing index is calculated by an annual accumulated value of multiplying the period of time with temperatures below zero, and the corresponding temperature. Therefore, the DAAT(daily average air temperature) calculation method may play an effect on the FI(freezing index). The Weather Observatory used to supply 4 average air temperatures per day, but currently supplies 8 per day. With this study, we divided the southern part(below FI=$350^{\circ}C{\cdot}day$) of the Korean peninsula into 6 areas according to site conditions(low embankment, embankment-cutting slope, and the cutting slope) and established a field measurement system for 15 positions to check the effects on the result of FI according to differing DAAT calculation methods. The air temperatures obtained by the field measurement system was used to calculate and compare the FI. As a result, the freezing index calculated based on the $DAAT_4(T_4)$ is normally greater by 3% than the one on $DAAT_8(T_8)$. In addition, the calibration equation for the freezing index using air temperatures was proposed through the research.

Analysis of Bearing Capacity Change of Forest Roadbed by Opening Year (개설시기에 따른 임도 노반의 지지력 변화분석)

  • Chen, Hyeong-Uk;Kim, Dong-Hyeon;Lee, Kwan-Hee;Kim, Dong-Geun
    • Journal of Korean Society of Forest Science
    • /
    • v.108 no.3
    • /
    • pp.322-328
    • /
    • 2019
  • The purpose of this study was to provide basic data for maintenance and repair of the forest road surfaces using the light drop weight test (LDWT), density test, and grain size analysis at four sites in Yeongyang-gun Mt. (2011y, 2014y, 2016y, and 2017y). In terms of the density test results, the opening density in 2011 was the highest at $2.0694g/cm^3$, and the opening density in 2017 was the lowest at $1.7443g/cm^3$. The grain size analysis showed that the proportion of large aggregates was highest at the opening in 2017, and the proportion of large aggregates decreased with the delay of opening date. From the LDWT results, $E_{vd}$ (the dynamic deformation coefficient) of the 2011y forest road was $35.7MN/m^2$, 2014y was $30.5MN/m^2$, 2016y was $28.6MN/m^2$, and 2017y was $23.5MN/m^2$. The $E_{vd}$ value for the oldest forests opened with the 2011y forest road was the highest, the average $E_{vd}$ value of the center portion was $21.45MN/m^2$, the average $E_{vd}$ value of the wheel portion of the banking part was $31.31MN/m^2$, and the average $E_{vd}$ value of the wheel portion of the cut part was $36.71MN/m^2$.

The Efficiency and Improvement of the Highway Wild-Life Fences for Decrease of Mammals Road-kill - In Case of Manjong~Hongchun Section on Jungang Highway - (포유류 로드킬 저감을 위한 고속도로 유도울타리 효율성 및 개선방안 연구 - 중앙고속도로 만종~홍천 구간을 사례로 -)

  • Song, Jeong-Seok;Lee, Kyong-Jae;Ki, Kyong-Seok;Jun, Ik-Yo
    • Korean Journal of Environment and Ecology
    • /
    • v.25 no.5
    • /
    • pp.649-657
    • /
    • 2011
  • This study had targeted the Manjong Junction~Hongchun interchange section of Jungang highway in order to analyze the efficiency and improvement of the highway wild-life fences. Being analyzed wild-life fence as an effective facility for the prevention of road-kill, it had founded that the wild animals did not jump over even the two layer guardrail, concrete barrier and noise barrier, fence for rock fall. For the section with high road-kill decrease effect after installing the wild-life fence, the effect was higher at wild-life fence with the height of 1.0m where the door had not been installed and the well connected points of road facility than the area with fence height of 1.5m. The road-kill decrease effect was also high at the well managed areas even if the door has not been installed. Also, road-kill had occurred by concentrating around the end of wild-life fence after installing the fence, Moreover road-kill had also occurred around the cutting section. The door of wild-life fence had higher amount of road-kill occurrence as the installation interval was closer. it was analyzed that the door management has a lot of effect on road-kill decrease. The fence for rock fall, two layer guardrail and concrete barrier having the effect of wild-life fence installed on the road would have to be installed by connecting with wild-life fences through proper facility improvement. Although the door should not be installed if possible, it should be installed as automatic door or gravity door to prevent the door from leaving the door open. An escape route has to be formed for the prompt escape away from the road for the animals entered through the ending section of the fence. The eco-corridor has to be made by restoring the soil layer of dual purpose eco-corridor forming a planting area. Also, the dead body after the accident has to be disposed to the outer section of the road immediately in order to prevent the secondary road-kill by the predator from the road-kill. The fence has to be installed as 500m or longer in both ways, in other words 1,000m or longer, from the targeted spot of minimum accident prevention while connecting up to the bridge or box culvert, etc that are next road facilities if possible to guide wild animals safely to the eco-corridor.