• Title/Summary/Keyword: 전환설계

Search Result 1,042, Processing Time 0.03 seconds

Proposal of BIM Application Process to Improve BIM Applicability of Basic Design in Heavy Civil Projects (토목 분야 기본설계 단계 BIM 적용성 향상을 위한 BIM 적용 프로세스 제안)

  • Song, EunSol;Moon, SoYeong
    • Land and Housing Review
    • /
    • v.13 no.3
    • /
    • pp.115-123
    • /
    • 2022
  • Recently, the adoption of BIM technology in domestic civil engineering projects has continually increased both in its numbers and scope. However, the BIM model was developed and used after the 2D design was developed instead of creating the BIM model from the conceptual design phase. BIM must be used throughout every phase of design and construction to use BIM for its original purpose. However, if BIM application is applied in heavy civil projects without a step-by-step guideline, it can confuse the market and face industry resistance to using BIM. Therefore, BIM is currently being used step by step in the civil engineering field by using BIM as a conversion design. However, the BIM conversion design method, currently being performed in the Preliminary design stage, has many difficulties due to low work efficiency. This paper analyzes the existing process of converting a 2D design into a 3D BIM model while addressing the issues related to its low work efficiency. To this end, a novel approach to 2D to BIM conversion for the design development stage is proposed.

A Comparative Study on the Socio-Technical Transition Theories: Integrated Approach to Transition Policy Design and Implementation (사회-기술 전환이론 비교 연구 - 전환정책 설계와 운영을 위한 통합적 접근 -)

  • Lee, Youngseok;Kim, Byung-Keun
    • 한국정책학회보
    • /
    • v.23 no.4
    • /
    • pp.179-209
    • /
    • 2014
  • Transition studies have been gaining attention among innovation researchers from the early 1990's mainly influenced by emerging global agendas on sustainability. In this paper, we review research issues and trends focusing on four prominent transition theories - Technological innovation systems, Multi-level perspective, Transition management and Strategic niche management. After reviewing main characteristics, research trends and debates of each theory from established literatures, we conduct comparative analysis of these theories and suggest integrated framework that can be considered when modeling transition policy. This integrated framework is applied to the case study on smart-grid policy of Korea.

Design of Carrier Recovery Circuit for High-Order QAM - Part II : Performance Analysis and Design of the Gear-shift PLL with ATC(Automatic Transfer-mode Controller) and Average-mode-change Circuit (High-Order QAM에 적합한 반송파 동기회로 설계 - II부. 자동모드전환시점 검출기 및 평균모드전환회로를 적용한 Gear-Shift PLL 설계 및 성능평가)

  • Kim, Ki-Yun;Kim, Sin-Jae;Choi, Hyung-Jin
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.38 no.4
    • /
    • pp.18-26
    • /
    • 2001
  • In this paper, we propose an ATC(Automatic Transfer mode Controller) algorithm and an average-mode-change method for use in Gear shift PLL which can automatically change loop gain. The proposed ATC algorithm accurately detects proper timing or the mode change and has a very simpler structure - than the conventional lock detector algorithm often used in QPSK. And the proposed average mode change method can obtain low errors of estimated frequency offset by averaging the loop filter output of frequency component in shift register. These algorithms are also useful in designing ASIC, since these algorithms occupy small circuit area and are adaptable for high speed digital processing. We also present phase tracking performance of proposed Gear-shift PLL, which is composed of polarity decision PD, ATC and average mode change circuit, and analyze the results by examining constellation at each mode.

  • PDF

The Transition Process from User Interlaces of Legacy Systems to Components (레거시 시스템의 사용자 인터페이스 컴포넌트화 프로세스)

  • 조영호;최윤석;정기원
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2002.04b
    • /
    • pp.361-363
    • /
    • 2002
  • 최근 객체지향 기법보다 효율적인 재사용성과 대체성을 지원하는 컴포넌트 기법에 대한 인식의 확대로 많은 업무용 시스템들에 대한 컴포넌트 기반 시스템으로의 재개발 또는 재개발 요구가 증가하고 있으며 이에 따라 레거시 시스템을 컴포넌트 기반 시스템으로 전환하기 위한 연구 또한 활발히 진행되고 있다. 본 논문에서는 레거시 시스템의 사용자 인터페이스를 컴포넌트화 하기 위한 전환 프로세스를 제시한다. 전환 프로세스는 레거시 시스턴 사용자 인터페이스 구성 분석, 컴포넌트 유형 분석, 컴포넌트 전환 패턴 개발. 컴포넌트 설계 및 구현 사용자 인터페이스 요구사망 테스트의 다섯 단계로 구성되어 있다. 레거시 시스템 사용자 인터페이스 구성 분석단지에서는 사용자 인터페이스의 화면구성파 내부로직을 분석하고 사용자 인터페이스의 컴포넌트화 단위를 결정하며 컴포넌트 유형 분석단계에서는 사용자 인터페이스를 구현할 컴포넌트 기술을 결정한다. 컴포넌트 전환 패턴 개발단계에서는 사용자 인터페이스를 컴포넌트화 시키기 위한 전판 패턴을 설계하며 컴포넌트 설계 및 구현 단계에서는 설계된 전환 패턴에 따라 사용자 인터페이스를 컴포넌트화한다. 사용자 인터페이스 요구사항 테스트단계에서는 개발된 컴포넌트가 레거시 시스템의 사용자 인터페이스에 대한 요구사항을 만족하는가를 확인한다. 제시한 프로세스를 적용할 래거시 시스템의 사용자 인터페이를 컴포넌트화한 구현 사례를 통해 사용자 인터페이스와 관련된 코드의 재사용 방범을 제시한다.

  • PDF

Typology of Policy Governance for Socio-technical Transitions (지속가능한 사회-기술 전환을 위한 정책 거버넌스 유형에 관한 연구)

  • Lee, Youngseok;Kim, Byung-Keun
    • Journal of Technology Innovation
    • /
    • v.22 no.3
    • /
    • pp.193-223
    • /
    • 2014
  • Socio-technical systems are receiving growing attention as a core concept in the process of searching for proper solutions to sustainable growth. In this paper, we review the way for governing socio-technical transitions from a governmental perspective. Based upon the governance studies and transition research, we set social coordination and locus of transition pressures as transition contexts to differentiate transition policy governance. We propose four types of policy governance for sustainable socio-technical transitions: leading, facilitative, coordinative and persuasive. Analysis on four case based upon this typology shows different transition polices of each transition pathway in analytical aspect. It provides basic criteria for policy makers to design effective transition policies in normative aspect. Also, this paper can contribute to closing the gap between transition research and governance studies.

스펙트럼천이 신형전환로 개념

  • 한국원자력산업회의
    • Nuclear industry
    • /
    • v.8 no.4 s.62
    • /
    • pp.76-78
    • /
    • 1988
  • 스펙트럼천이 신형전환로 (이하 신형전환로)는 표준 가압수형원자로의 로심과 로심주변을 변형한 원자로이다. 신형전환로와 기존 가압수형원자로와의 다른 점은 핵연료집합체설계와 원자로내부구조인데, 신형전환로 로심은 기존의 가압수형원자로와 유사한 구조의 핵연료집합체로 구성되어 있으나 주요한 차이는 사각형이 아니라 육각형으로 되어 있다는 점이다.

  • PDF

Moderating Effects of Switching Cost on the IT Service Switching Intention (IT서비스 전환의도에 대한 전환비용의 조절효과)

  • Kim, Soo-Hyun
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.10
    • /
    • pp.452-460
    • /
    • 2013
  • Nowadays IT service users meet various new IT services and are considering a switch into a new IT service. IT service providers are also developing the strategies to retain and expand their customer base. Studies on switching intention have been one of the most interesting topics in the on-line and off-line markets. In this paper we investigate the factors influencing the IT service switching intention. Our research model includes the relationship between 'switching intention' and 'habit', 'alternative attractiveness', 'present service satisfaction'. In addition, we try to find the effect that 'habit' and 'alternative attractiveness' give to 'switching intention' through 'present service satisfaction'. Finally, the moderating effects of 'switching cost' are examined. This empirical paper proves that 'habit' and 'present service satisfaction' give effects to 'switching intention', and 'alternative attractiveness' give the indirect effects to 'switching intention'. In addition, 'switching cost' has the moderating effects between 'switching intention' and 'habit'.

An Analysis on Design Error Issues of BIM Conversion Design Projects through Case Studies (사례 연구를 통한 BIM 전환설계 프로젝트의 설계오류 이슈 분석)

  • Kim, Beom-Jun;Ju, Hyung-Woo;Jang, Moon-Seok;Kim, Byeoung-Ju;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.6 no.2
    • /
    • pp.47-57
    • /
    • 2016
  • Recently, the introduction and spread of BIM technology has been actively promoted at the domestic level and abroad. However, the BIM adoption and diffusion rate in the whole construction industry has been slower than expected, this is because they applied to construction projects in a way that does not meet the basic objective of BIM adoption. The objective of this paper is to derive a BIM adoption strategy that can provide benefits and efficiency from the design phase, by analyzing issues related to design errors identified in two real world projects based on the 2D to BIM conversion process. Types of issues, type distribution, and degree of BIM contribution to find issues were analyzed in a quantitative way, and then a BIM adoption strategy was derived. As a result, this paper identified that there obviously exists a limit in the 2D to BIM conversion process by repeating the problems that occur in the traditional 2D design process. Therefore, the authors of this paper insist that the design firms should adopt BIM-based design processes, fully, to get financial benefits as well as to improve the design quality.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF