• Title/Summary/Keyword: 전문기술자

Search Result 70, Processing Time 0.034 seconds

Analysis on On-line Q&A Cases regarding Landscape Trees Management - Focused on Online Consultation Board at Tree Diagnostic Center - (조경수 관리에 관한 온라인 질의응답 사례 분석 - 수목진단센터 온라인 상담 사례를 대상으로 -)

  • Lim, Byoung-Eul;Lee, Sae-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.1
    • /
    • pp.44-50
    • /
    • 2013
  • The persons in charge of management request diagnosis and prescription to tree hospitals in order to get consultation about the problems like blight that occur in landscape tree management. This study aims to analyze what the main problems and questions raised by landscape gardeners are and those concerned in landscape tree management. This is done by investigating landscape tree-related questions and answers uploaded on the online consultation boards of the plant diagnostic centers approved in Korea including the Seoul National University Plant Clinic, the Chungbuk National University Plant Hospital, and the Kangwon Diagnostic Center. As a result, those concerned in landscape occupied the most as 81.4% among the questioners. However, only 11.5% did explain the plant management history or surrounding environment, which is essential for landscape tree diagnosis when asking questions. This shows that those concerned in landscape lack basic knowledge or interest about plant diagnosis. Among 263 questions about landscape trees, questions about physiological damage included 94 cases that were the most taking up 35.8%. Moreover, the next were damage by insects and damage by disease in order. It is thought that due to the characteristics of physiological problems that occur by various sorts of stress and with no signs, they tend to request diagnosis or prescription the most. The most frequent reasons for physiological damage are water stress and temperature stress. About damage by disease, there exist many types of diseases, and there are many complex damages accompanied by physiological causes. About damage by insects, the most common include damage by moths. In consideration of this result, universities or technician training centers should provide education for landscape tree management so that landscape technicians and students can acquire essential knowledge and information about landscape tree management and increase their interest in it. In particular, it is necessary to provide profound learning opportunities for plant physiology, and the technicians should make efforts themselves. In addition, it is needed to build organizations to which they can ask technical questions about landscape planting and management in order to understand landscape industry in general and the actual status of landscape planting technique and the actual field. Moreover, to elevate systemicity and expertise in the area of landscape tree management not yet equipped with the foundation, it is needed to cultivate the technicians intensively and conduct research by those concerned both in academic and industrial circles.

An Extraction and ANP Importance Analysis for Competence Factors of Junior Grade CM Engineer (초급 건설사업관리기술자(CMr)의 요구역량 추출 및 ANP 중요도 분석)

  • Yang, Jinkook;Kim, Sebeom;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.58-64
    • /
    • 2017
  • Construction Management (CM) is being utilized as an efficient project management system. Construction management system provide scientific management techniques as well as the expert's service with the expertise. Accordingly, CM services demand is continuously increasing in construction project. Construction Management engineer grade is distinguished by the Index of Construction Engineer's Competency (ICEC). Construction management engineer requires a higher score than the other fields. However, junior grade CM engineer can get grade according to the education and qualification. This study was conducted junior grade CM engineer depth interview after analyzing the problem of the current CM engineer grade system. As a result, this study was to extracted the 23 kind competence factors. And, competence factors were five area grouped using affinity diagram method. Next, we analyzed the importance utilizing the Analytic Network Process (ANP) technique. As a result, high priority areas were analyzed to be quality and cost areas associated with project management.

Development of Model for Selecting Superstructure Type of Small Size Bridge Using Dual Classification Method (이원분류기법을 이용한 소규모 교량 상부형식선정 모형에 관한 연구)

  • Yun, Su Young;Kim, Chang Hak;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1413-1420
    • /
    • 2015
  • On the design phase of small size bridge, owing to the lack of related guidelines or standards to determine a superstructure type of bridge, many designers tend to select the type depending on expert's experience and knowledge. Moreover, recently, as types of bridge superstructure become diverse and more conditions need to be considered in the project, the decision makes process become complex. This research covered the selection of a superstructure type of a middle or small size bridge with span length of about 50m, which frequently built for national roadway, selecting type of bridge superstructure more systematic way rather than the existing ways to compare construction methods or to depend on expert's experiences. This study proposes to build a bridge superstructure type selection model using one of the techniques of artificial intelligence techniques SVM by applicability of the model examined through the verification of the actual case.

A Study on Introduction of Levee Accreditation Program (제방 인증제 도입에 관한 연구)

  • Lee, Sang-Ho;Kang, Tae-Uk;Yu, Kwon-Kyu;Lee, Nam-Joo;Lee, Jae-Hyung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1739-1743
    • /
    • 2009
  • 현재 국내에는 하천시설물의 인증과 관련한 제도와 법령이 마련되어 있지 않다. 하천시설물과 관련된 인증 제도는 효율적인 하천시설물의 유지관리를 가능하게 하고, 치수 안전성 증대에 기여할 수 있다. 본 연구는 미국의 제방 인증(levee accreditation) 제도를 분석하여 국내에 적용하는 방안에 관한 것이다. 미국의 연방 재난 관리국(Federal Emergency Management Agency; FEMA)은 국가 홍수 보험 프로그램(National Flood Insurance Program; NFIP)을 관리하고 있는데, 그의 일환으로 제방 인증 제도를 시행하고 있다. 제방의 인증은 제내지를 보호하는 제방 시스템이 100년 빈도의 홍수에 대한 방어 능력이 있는지를 기술적으로 검토하는 것이다. 여기서 제방 시스템이란, 제방, 홍수벽, 수문 장치, 펌프시설, 암거, 내수 배제 시설 등 홍수로부터 제내지를 보호하기 위한 모든 시설을 포함한다. 미국은 제방 인증을 위한 제도로서 연방 규정 조례(code of federal regulation; CFR)를 두어 제방 시스템의 설계, 운영, 유지관리의 기준을 마련하였다. 제방 인증을 신청하는 기관은 연방 규정 조례에서 정의된 제방 시스템의 운영 및 유지관리에 관한 문서를 갖추어야하고, 공학적인 설계 기준에 대하여 면밀히 검토되어야 한다. 운영 및 유지관리에 관한 사항은 수문과 내수배제 시스템을 포함한 제방 시스템의 홍수 시 운영 지침과 운영실적, 유지보수 지침과 점검 보고서 등이다. 공학적인 설계 기준에 대한 검토사항은 제방의 여유고, 수문, 호안, 제방과 기초의 안정성, 침하, 내수배제에 관한 분석 결과이다. 이러한 제방의 인증에 필요한 기술적인 검토 자료와 관련 문서는 등록된 전문 기술자나 제방의 설계와 시공능력을 갖춘 연방 기관을 통해 보증(certification) 되어야 한다. 현재, 미국에서 제방의 보증을 결정하는 대표적인 기관은 미 공병단(U.S. Army Corps of Engineers; USACE)이다. 제방 보증의 유효기간은 최대 10년이지만 검사와 평가가 지속되고, 유효 기간 만료 전이라도 언제든지 재검토될 수도 있다. 또한, 제방 시스템 전체에 대하여 보증 여부를 결정하고, 개별 시설에 대한 보증이나 조건부 보증은 수행하지 않는다. 국내에 제방 인증 제도를 도입하기 위해서는 제방 인증에 관한 절차, 수행 기관, 수행 방법 등에 대한 규정과 제도가 마련되어야 하고, 현재 국내에서 수행되고 있는 하천시설물의 안전도 검사 방법을 포함한 평가 지표와 평가 기술에 대한 인증 표준화가 요구된다.

  • PDF

A Study on Development of BIM-based Engineering Management System for Temporary Work (BIM기반 가설공사 업무지원시스템 개발에 관한 연구)

  • Choi, Changhoon;Han, Choonghee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.61-69
    • /
    • 2020
  • As the amount of information generated in the construction project increases exponentially, design and construction review have a serious impact on the success of the site. For this reason, academic and business circles have been expanding the use of BIM at the whole life, and BIM is now accepted as one of the standards used in the construction industry. However, the BIM-based design for the temporary work is used as an aid to the 2D design because there is no specialized software and there is absolutely lack of a professional engineer. The objective of this research is to develop BIM-based temporary work support system. This system minimizes human errors in BIM-based design, quantity takeoff and inspection and shortens working hours.

Strategies for Improving Forest Work Team Management (산림작업(山林作業) 영림단(營林團) 운영개선(運營改善) 방안(方案)에 관한 연구(硏究))

  • Kang, Gun-Uh
    • Journal of Korean Society of Forest Science
    • /
    • v.94 no.3 s.160
    • /
    • pp.153-160
    • /
    • 2005
  • This study was analyze the performance of Forest Work Team from 1999 to 2003. Following recommendations were come up by reviewing the performance of Forest Work Team. The volume of forest works should be increased in order to supply the constant daily work. This would provide the increase of their salary and maintain their salary and maintain their livelihood. The Forest Work Teams should be the members of registered business with highly trained manpower. Qualified Work Team should have extra financial incentive by comparing with general forest workers who did not have adequate skills. The percentage of the certified forest workers should be increased by providing the technical training. To increase the efficiency of forest work, the forest mechanization should be accomplished and the training of forest mechanization had to be offered regularly for the forest workers, and provided them with an education allowance.

A Suggestion of Claims Preparation Procedure in the Public Sector (공공건설사업에서 업무단계별 클레임준비 절차)

  • Cho Young-Jun;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.54-62
    • /
    • 2001
  • Although claims and disputes may be never avoided in construction industry, until 1998, there are no systematic claims in the public sector in Korea. But, because of IMF, Contractors have been recognized that cost management is essential factor and contractual right can be demanded against the Public Orderer. Many affirmative effect such as, appearance of new professional service, prevention of lower quality construction, restrain of unnecessary budget expenditure, arrangement of duplicated or triplicated liability and revision of unnecessary administrative control may be anticipated through alleging claims, but in site representative manager and construction company may have ambiguous fear, somebody tried to allege claims. Therefore, to activate systematic construction claims, 32 public construction project claims alleged by contractors from 1998 to 2001 were analyzed, inactivated reasons of claims were examined and contractor's action plan to allege claims was suggested in this paper.

  • PDF

Improvement Plans on Defect Consulting Report in an Apartment Building through Analyzing on Formal Index and Quantitative Index (형식 및 질적요소 체계분석을 통한 공동주택 하자감정서의 개선방안)

  • Park, Jun-Mo;Seo, Deok-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.3
    • /
    • pp.195-206
    • /
    • 2014
  • The main issue of defect dispute is consulting, reviewing, and finally judging as an arbiter. A defect consulting is represented a defect consulting report, but a business custom and a standard of judgment are different each consultants, and have many problems. This study reviews literature studies and institutional researches, set up a research structure. it has 7 indexes that 5 indexes are formal indexes, and the other are qualitative indexed. As a result of case study, formal indexes are respect on the whole. However, each appraiser has different ideas, and, is expected to delay on fixing a construction lawsuit practice. This study suggests to improve a defect consulting report, it is followed. In formal part, suggested to change configuration is adjusted and integrated similar items. In qualitative part, an evaluation system for appraiser and an education program for engineers is suggested.

A BIFS Generation Module in an MPEG-4 Authoring System (MPEG-4저작 시스템에서 BIFS생성 모듈)

  • Bae, Su-Young;Kim, Sang-Wook;Mah, Pyeong-Soo
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.8 no.5
    • /
    • pp.520-529
    • /
    • 2002
  • Though BIFS is a complex description language that represents MPEG-4 content as text or bit streams, most traditional MPEG-4 content authoring tools are developed for a BIFS expert. Before using these tools, many authors must invest much time and energy in acquiring knowledge of BIFS. In this paper, we suggest a new manner for saving these efforts. Our proposal supplies the convenient user interface of traditional multimedia authoring tools for MPEG-4 authors and interprets the authored information and transforms it into BIFS. In our user interface, the author generates the minimal authoring information requested for generating BIFS; the BIFS generation module then transforms the information into BIFS format using predefined BIFS construction rules. The resulting BIFS consists of the Scene Tree and the Object Descriptor and Route; they are used for constructing MP4 standard files by mixing with the Elementary Stream.

Analysis on the Characteristics of Construction Practice Information Using Text Mining: Focusing on Information Such as Construction Technology, Cases, and Cost Reduction (텍스트마이닝을 활용한 건설실무정보의 특성 분석 - 건설기술, 사례, 원가절감 등 정보를 중심으로 -)

  • Seong-Yun, Jeong;Jin-Uk, Kim
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.56 no.4
    • /
    • pp.205-222
    • /
    • 2022
  • This study aims to improve the information service so that construction engineers and construction project participants without specialized knowledge can easily understand the important words and the interrelationships between them in construction practice. To this end, using text mining and network centrality, the frequency of occurrence of words, topic modeling, and network centrality in construction practice information such as technical information, case information, and cost reduction, which are most used in the Construction Technology Digital Library, were analyzed. Through this analysis, design, construction, project management, specifications, standards, and maintenance related to road construction such as roads, pavements, bridges, and tunnels were identified as important in construction practice. In addition, correlations were analyzed for words with high importance by measuring Degree Centrality and Eigenvector Centrality. The result was that more useful information could be provided if the technical information was expanded. Finally, we presented the limitations of the study results and additional studies according to the limitations.