• Title/Summary/Keyword: 재작업 비용

Search Result 147, Processing Time 0.02 seconds

Design and Implementation of the GNEX-to-iPhone Converter for Smart Phone Game Contents (모바일 콘텐츠 자동변환기를 위한 콘텐츠 분석기와 리소스 변환기 개발)

  • Lee, Yang-Sun;Kim, Jae-Sung;Kim, Myoung-Jin
    • Journal of Korea Multimedia Society
    • /
    • v.14 no.5
    • /
    • pp.681-690
    • /
    • 2011
  • Since korean mobile communication companies each use different mobile platforms, developers must configure and translate their game contents to run under each of the smart phone platforms so that they can be serviced correctly. Nevertheless, such translation tasks require lengthy times and costs. This is one of the reasons why a variety of contents could not be provided. In order to mitigate such difficulty, this paper implemented the contents analyzer and the resource converter of the automatic mobile contents converter system that converts game contents of the mobile platform such as the WIPI and the GNEX to contents of the smart platform such as the Android and the iOS. The automatic mobile contents converter system helps minimize the amount of time and cost required in servicing contents to different mobile communication companies by promptly converting platform-specific-contents to run under smart platforms. Also, the automatic conversion and servicing of existing contents increases the reusability of these contents and also the productivity of new contents thereby offering users with a more variety of game contents.

Vehicle Loading Model Considering Routing Sequence in Shipbuilding Material (조선기자재 산업에서의 방문 순서를 고려한 차량 적재 모형)

  • Lee, Jong-Ho;Shin, Jae-Young
    • Journal of Navigation and Port Research
    • /
    • v.31 no.8
    • /
    • pp.711-716
    • /
    • 2007
  • When the freight is loaded into a container loading rate must be considered. There are many studies on loading more freights into limited space. But the problem, which is needed to consider the routing sequence is different. A large size of freights, such as shipbuilding materials, am be rehandled or cannot be possible to unload. In this paper I tried to find the solution for the problem consider routing sequence, whereupon I present the container loading model which consider the routing sequence and loading rate and its solution.

Design and Implementation of DSM-CC Object Carousel Encoder using DirectShow Filters (DirectShow 필터를 이용한 DSM-CC Object Carousel 인코더의 설계 및 구현)

  • Lee Eun Sung;Choi Seong Jong;Park Min Sik;Choi Jin Soo
    • Proceedings of the Korean Society of Broadcast Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.105-108
    • /
    • 2003
  • 본 논문에서는 Microsoft DirectShow기반의 DSM-CC Object Carousel과 Data Download 프로토콜을 위한 인코더의 설계 및 구현에 대해 기술한다. DirectShow는 Component Object Model (COM) 기술을 기반으로 하고 있다. 따라서, 작성된 코드의 재사용과 유지보수가 용이하고, 멀티미디어(Multimedia) 데이터를 편리하게 처리말 수 있는 기능을 제공한다. 또한, 개발자가 COM component를 쉽게 제작할 수 있는 방법을 제공한다 하지만, 스트리밍 오디오/비디오 등의 디코딩을 위주로 개발된 DirectShow기술이 데이터 방송 서버에서의 실시간 인코딩 작업에 사용할 때에는 문제점이 발생한다 Data Carousel 방식에서는 인로딩 도중에 Update를 지원해야 한다. 즉, Carousel데이터의 Update가 있을 경우, 스트리밍(Streaming) 하는 동안 Update된 데이터를 인코딩 하여야 한다. 이러한 상황은 DirectShow의 기본 상태로는 표현하기 어려우므로 기본 상태를 확장하여 별도의 사용자 정의 상태를 추가하였다. 또한, 두 작업을 동시에 수행하기에 적합한 스레드(thread) 모델과 Push/pull 버퍼 모델을 설계하였다. DirectShow를 이용하여 인코더를 구현함으로써 개발자는 개발시간과 비용을 절약 할 수 있고, 사용자에게는 인코더를 등록하고 실행하기 쉬운 환경과 인로딩 상태의 실시간 모니터링 기능을 제공한다.

  • PDF

A Software Design Methodology Integrating Evaluation Method of Architectural Design Approaches (아키텍처기반 설계 방식에 대한 평가기능이 통합된 소프트웨어 설계 방법론)

  • Koh, Hyon-Hee;Kung, Sang-Hwan;Park, Jae-Nyon
    • Journal of KIISE:Software and Applications
    • /
    • v.34 no.7
    • /
    • pp.625-634
    • /
    • 2007
  • Due to the software is getting complex and large, software architecture design is issued for success of project. In the design phase, selection of the suitable architectural approach is very important. In this thesis, we identify the architectural approach alternatives in the design phase. And the evaluation method to choose architectural approaches and the architecture design methodology integrated with that evaluation method are proposed In the proposed architecture evaluation method and the architecture design methodolody, we intend to raise reliability, completeness of design and reduce development costs.

The mechanical properties of welded joint in high strength hot rolled steel for heavy machinary (중장비용 고강도 열연강재의 용접부 특성)

  • Jeong, H.C.;Lee, J.S.;Lee, J.W.
    • Proceedings of the KWS Conference
    • /
    • 2009.11a
    • /
    • pp.63-63
    • /
    • 2009
  • 최근 연비 향상 및 배기가스 저감을 위한 친환경 경량 굴삭기에 대한 연구가 활발히 진행되고 있다. 이러한 시도는 굴삭기의 소재의 강도를 490MPa급에서 700MPa급으로 고강도화를 통하여 작업장치의 경량화를 도모하고 있다. 본 연구에서는 중장비용 고강도 열연강재로 재발중인 ATOS70강재의 기본 용접성 및 GMAW 용접부 특성을 검토하였다. 사용한 시험재는 현장시험재인 14~16mmt두께의 ATOS70강재를 사용하였고, 용접경화성 및 저온균열감수성을 평가하였다. 또한 GMAW 용접을 실시하여 용접부의 이음부 특성을 검토하였다. 14mmt 두께의 ATOS70강재의 탄소당량은 약 0.44수준이고, 모재 인장강도는 약 760MPa급 수준을 보였다. 한편 최고경도시험에 의한 용접부 최도경도는 약 300Hv 수준을 보였으며, 경사 y-groove구속시험에 의한 14mmt두께의 한계예열온도는 상온이었다. 한편 GMAW 용접부 인장시험결과 740MPa급 이상의 인장강도를 확보하였고, $-5^{\circ}C$ 용접부 Charpy 충격시험결과 48J 이상의 충격인성을 나타내었다.

  • PDF

연구개발투자의 산업간 파급효과

  • 김정우;이희경
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1995.09a
    • /
    • pp.144-155
    • /
    • 1995
  • 본 연구는 기술에 대한 대용개념으로 사용되고 있는 연구개발투자의 효과가 산업의 생산성 향상에 얼마만큼 기여하고 있는가에 관한 실증연구로, 그 효 과를 자체 연구개발효과와 파급효과로 나누어 측정하는 데 목적이 있다. 파 급효과의 경우, 중간재의 거래를 통한 체화된 파급효과와 산업간의 기술거리 로 인한 비체화된 파급효과로 나누어 한국 제조산업을 18개로 분류한 후 각 산업의 연구개발스톡을 측정하였으며, 연구개발투자의 체화된 파급효과 측정 을 위하여 산업 연관표를 이용하여 가중치를 계산하였다. 그리고, 비체화된 파급효과 측정을 위하여는 각 산업에서 고용하고 있는 전공별 연구원 수의 자료를 이용 기술거리를 구하였다. 본 연구에서는 각각의 가중치로 구한 연 구개발스톡, 체화된 연구개발 스톡, 그리고 비체화된 연구개발 스톡을 이용 하여 각 독립변수들에 대한 한계생산성을 구하였으며, 분석 방법으로는 단순 회귀분석과 함께 시계열의 효과와 산업간 효과를 고려하는 패널데이터 분석 을 시도하였다. 체화된 파급효과와 비체화된 파급효과 중 하나만을 변수로 포함하는 경우에는 추정치가 유의한 결과를 나타내고 있지만, 두 가지의 변 수를 모두 포함하는 경우에는 보호도 일정하지 않으며 비유의적인 결과를 보였다. 이러한 결과는 다중공선성에 의한 것으로 보인다. 두 가지 파급효과 에 대한 한계생산성 추정치는 기술과 연구개발투자가 외부성을 가지고 있으 며, 기술과 관련된 변수의 도입이 필요함을 시사한다. 또한 이러한 파급효과 의 추정치는 거시차원에서 연구개발 지원의 정당성에 대한 근거를 제시하고 있으며, 기술혁신을 위한 투자의 타당성을 실증적으로 보여주고 있다.사하였다. 이 사례 연구들의 결과는 각 계열사들의 상황에 따라 제시된 외주위탁 전략과 현재의 외주위 탁 전략이 일치할 때 정보 시스템에 대한 사용자 만족도가 보다 높은 것으 로 나타났다. 할 수 있는 효율적인 distributed system를 개발하는 것을 제시하였다. 본 논문은 데이타베이스론의 입장에서 아직 정립되어 있지 않은 분산 환경하에서의 관계형 데이타베이스의 데이타관리의 분류체계를 나름대로 정립하였다는데 그 의의가 있다. 또한 이것의 응용은 현재 분산데이타베이스 구축에 있어 나타나는 기술적인 문제점들을 어느정도 보완할 수 있다는 점에서 그 중요성이 있다.ence of a small(IxEpc),hot(Tex> SOK) core which contains two tempegatlue peaks at -15" east and north of MDS. The column density of HCaN is (1-3):n1014cm-2. Column density at distant position from MD5 is larger than that in the (:entral region. We have deduced that this hot-core has a mass of 10sR1 which i:s about an order of magnitude larger those obtained by previous studies.previous studies.업순서들의 상관관계를 고려하여 보다 개선된 해를 구하기 위한 연구가 요구된다. 또한, 준비작업비용을 발생시키는 작업장의 작업순서결정에 대해서도 연구를 행하여, 보완작업비용과 준비비용을

  • PDF

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

Machine Allocation Based on Salvage Value for Minimizing Purchasing Costs of Consumable Auxiliary Tools (소모성 보조 장비 구입비용 최소화를 위한 잔존가치 기반의 장비 할당 문제)

  • Yoon, Sung-Wook;Jeong, Suk-Jae
    • Journal of the Korea Society for Simulation
    • /
    • v.23 no.4
    • /
    • pp.51-64
    • /
    • 2014
  • Small and medium Enterprises (SMEs), which have a manufacturing method of small quantity batch production produce goods using a general-purpose equipment and attached auxiliary tools. Many previous studies have focused on finding the effective resource allocations for improving the firms' productivity. It is very important for SMEs to keep costs low in assigning jobs to each resource, because they should meet the future uncertain demand of consumers under the limited budget. Using the concept of salvage cost, this paper proposes how to effectively allocate the tasks to main resources in the production process. The salvage cost is defined that purchasing cost minus decrease in value by workload, the method considering this is expected to reduce total purchasing costs during business period. To validate the effect of the proposed method, we proceed the real case study targeting on S company, PCB manufacturer to compare purchase amounts and its costs between the allocation proposed based salvage cost and current allocation method of current S company. As a results, In short-term (3 year) business period, salvage allocation have remarkable superior outcome to existing method, but gradually have cancelled out the effects in long-term (8 year) plans. Unlike the cycle allocation method, there exists the idle-equipments in allocation based salvage value. we additionally analyze the profits with respect to rental strategy of them during business period.

위성 공통지상시스템 개발 동향

  • Choe, Jong-Yeon
    • Current Industrial and Technological Trends in Aerospace
    • /
    • v.5 no.2
    • /
    • pp.33-42
    • /
    • 2007
  • 위성체 총조립 및 시험(AIT ; Assembly, Integration & Test)을 위한 전기지상지원장비(EGSE ; Electrical Ground Support Equipment)와 위성 임무 준비 및 운용을 위한 관제시스템(MCS ; Mission Control System)의 공동 개발은 미국과 유럽의 위성사업 기관 및 업체에서 지금까지 많은 연구가 되어 왔다. 비록 두 시스템이 다른 목적으로 사용되고 있지만 기술적으로 유사한 기능을 갖는 시스템으로서 많은 공통점과 호환 가능성을 갖고 있다. 두 시스템의 공동 개발은 시스템 개발과 위성 운용 교육 및 준비에 필요한 비용 절감뿐만 아니라 AIT 단계에서 위성운용단계로의 자연스러운 전환이 가능하다. 이는 AIT 단계에서 공통지상시스템 하드웨어 및 운영시스템, 시험/운용 절차서, 위성 데이터베이스의 사전 검증이 이루어지기 때문이다. 또한 위성 운용 요원의 AIT 참여를 통해 공통지상시스템 운용 훈련과 위성 관제 지식 습득이 자연스럽게 이루어 질 수 있다. 이로서 사업 일정과 개발 위험도를 최소화 할 수 있다. 이러한 두 시스템의 공통성과 호환성 및 공통시스템 개발 장점이 있기에 EGSE와 MCS의 공통 기능에 대한 표준화 작업은 1986년 만들어진 COES(Committee for Operations and EGSE Standard)에서 공식적으로 논의되기 시작하여 1994년 CNES와 ESA의 발의로 제정된 ECSS(European Cooperation for Space Standards)를 통해 국제 표준(ISO, CCSDS 등)을 바탕으로 한 지상시스템에 대한 유럽 표준화 작업이 ECSS-E-70 Working Group에서 진행되고 있다. 또한 검증된 지상시스템의 핵심 운영시스템의 소프트웨어 모듈의 재사용을 통해 최근에서 다양한 공통지상시스템이 개발되어 운용되고 있다. 이러한 배경으로 국내에서도 저궤도 위성 개발에서 EGSE 핵심 모듈인 TM/TC 처리 및 Database 관리 모듈을 AIT 단계에서 개발 및 검증 후에 MCS에서의 재사용을 적극적으로 고려하고 있다. 앞으로 국제적인 추세에 따라 AIT 및 지상국간의 기술 및 인력 교류와 핵심모듈 개발을 통한 공통지상시스템 개발의 활발한 전개가 예상된다.

  • PDF

Geometry-to-BIM Mapping Rule Definition for Building Plane BIM object (건축물 평면 형상에 대한 형상-to-BIM 맵핑 규칙 정의)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.236-242
    • /
    • 2019
  • Recently, scanning projects have been carried out in various construction and construction fields for maintenance purposes. The point cloud generated by the scan results is composed of a number of points representing the object to be scanned. The process of extracting the necessary information, including dimensions, from such scan data is called paradox. The reverse engineering process of modeling a point cloud as BIM involves considerable manual work. Owing to the time-consuming reverse engineering nature of the work, the costs increase exponentially when rework requests are made, such as design changes. Reverse engineering automation technology can help improve these problems. On the other hand, the reverse design product is variable depending on the use, and the kind and detail level of the product may be different. This paper proposes the G2BM (Geometry-to-BIM mapping) rule definition method that automatically maps a BIM object from a primitive geometry to a BIM object. G2BM proposes a process definition and a customization method for reverse engineering BIM objects that consider the use case variability.