• Title/Summary/Keyword: 작업 배분

Search Result 86, Processing Time 0.019 seconds

A Basic Study on a Database Product Costing Method in the Database Service (데이타베이스서비스의 원가계산 방법에 관한 기초 연구)

  • Lee, Yeong-Jae;Kim, Chang-Hui
    • The Transactions of the Korea Information Processing Society
    • /
    • v.1 no.2
    • /
    • pp.141-153
    • /
    • 1994
  • According to various information needs of end-users in information society, it brings forward a study on a database(DB) product costing method in order to activate the DB industry. The objective of this paper is to propose the DB product costing method of the DB service. The first thing classifies the elements of DB product cost accounting by the activities of the circulation system of information in the DB service. Based on the assumptions in terms of DB product cost accounting, the second is to develop its model. The last is to present the process of DB product cost accounting by applying the model to a company which provides the DB service. It is necessary to research continuously regarding the DB product costing method because its purpose is to decide a DB service charge. The right pricing decision in the DB service charge will contribute toward the growth of the DB industry acceleratedly.

  • PDF

Development of Data Warehouse for Construction Material Management (건설공사 자재 관리를 위한 데이터 웨어하우스 개발)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.319-325
    • /
    • 2011
  • During a construction project, construction managers must be provided with material information to help them to make decisions more efficiently without delaying the delivery of material. Construction work can be smoothly performed with the proper material supply. Construction duration depends on several material-related decisions, including the order, delivery, and allocation of material to the correct work location. Hence, it is worthwhile to introduce data warehouse techniques that generate subject-oriented and integrated data to construction material management. The data warehouse for construction material management can perform multidimensional analysis and then define KPIs (Key Performance Index) in order to provide construction managers with construction material information such as lead time, material delivery rate, material installation rate and so on. This research proposes a method of effectively facilitating large amounts of data in the operating systems during the construction management process. In other words, the proposed method can supply structured and multi-perspective material-related information using data warehouse techniques.

Implementation and Performance Analysis of Efficient Packet Processing Method For DPI (Deep Packet Inspection) System using Dual-Processors (듀얼 프로세서 기반 DPI (Deep Packet Inspection) 엔진을 위한 효율적 패킷 프로세싱 방안 구현 및 성능 분석)

  • Yang, Joon-Ho;Han, Seung-Jae
    • The KIPS Transactions:PartC
    • /
    • v.16C no.4
    • /
    • pp.417-422
    • /
    • 2009
  • Implementation of DPI(Deep Packet Inspection) system on a general purpose multiprocessor platform is an attractive option from the implementation cost point of view, since it does not require high-cost customized hardware. Load balancing has been considered as a primary means to achieve high performance in multi processor systems. We claim, however, that in case of DPI system design simply balancing the load of each processor does not necessarily yield the highest system performance. Instead, we propose a method in which tasks are allocated to processors based on their functions. We implemented the proposed method in dual processor Linux system and compare its performance with the existing load balancing methods. Under the proposed method, one processor is dedicated to deal with interrupt handling and generic packet processing, while another processor is dedicated to DPI processing. According to experimental results, the proposed scheme outperforms the existing schemes by 60%, mainly because of the reduction of cache miss and spin lock occurrences.

The Effects of Task Oriented Activity and Modified Constraint Induced Movement Therapy on Quality of Life for Patients With Stroke (과제 지향적 훈련과 수정된 강제유도 운동치료가 뇌졸중 환자의 삶의 질에 미치는 영향)

  • Lee, Jong-Min;Kim, Bo-Ra
    • Therapeutic Science for Rehabilitation
    • /
    • v.1 no.2
    • /
    • pp.23-34
    • /
    • 2012
  • Objective : The purpose of this study was to investigate the effect of task oriented activity and modified constraint induced movement therapy (mCIMT) on Quality of Life (QOL) for patients with stroke. Methods : Thirty stroke patients were participated voluntarily and were assigned randomly into task oriented activity and mCIMT groups. The QOL of both groups were assessed using Stroke Specific Quality of Life (SS-QOL). Results : The QOL showed a statistically meaningful difference for both groups (p<.05), but after the intervention, the both groups showed no statistically meaningful difference in terms of the QOL (p>.05). Conclusion : We found that task oriented activity and mCIMT improve the QOL of patients with stroke through increasing their affected upper extremity function and movement. It is expected that task oriented activity and mCIMT will have a positive effect on the QOL of stroke patients by applying them to clinic with occupational therapy.

Flip Side of Artificial Intelligence Technologies: New Labor-Intensive Industry of the 21st Century (4차 산업혁명시대의 디지털 경공업)

  • Heo, Seokjae;Na, Seunguk;Han, Sehee;Shin, Yoonsoo;Lee, Sanghyun
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.34 no.5
    • /
    • pp.327-337
    • /
    • 2021
  • The paper acknowledges that many human resources are needed on the research and development (R&D) process of artificial intelligence (AI), and discusses on factors to consider on the current method of development. Enfin, in order to enhance efficiency of AI development, it seems possible through labour division of a few managers and numerous ordinary workers as a type of light industry. Thus, the research team names the development process of AI, which maximizes production efficiency by handling digital resources named 'data' with mechanical equipment called 'computer', as digital light industry of fourth industrial era. As experienced during the previous Industrial Revolution, if human resources are efficiently distributed and utilized, digital light industry would be able to expect progress no less than the second Industrial Revolution, and human resources development for this is considered urgent.

Design and implementation of a project management system capable of process management by Activity using PERT/CPM (PERT/CPM을 이용한 Activity에 대한 연결 공정관리가 가능한 프로젝트 관리 시스템의 설계 및 구현)

  • Park, Sun-Yi;Park, Hee-Sook
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.26 no.5
    • /
    • pp.802-807
    • /
    • 2022
  • In projects where mufti-project management is required and processes for production activities are repeated and linked, it is very difficult to input processes for activity repeatedly or analyze loads by process in a method of managing processes step by step. In this paper, based on the definition of activity and project process, the connection process can be automatically created for activity, schedule and resource management for each process, schedule and resource plan can be established for each detailed process, and load analysis can be provided in real time. It presents a project management system that can significantly improve the time and cost of project progress management, predict various problems that may occur during the project, and effectively allocate the necessary amount of resources in the right place.

Travel Demand Estimation using Traffic Counts on the Large Scale Network (대규모교통망에서 관측교통량기반 통행수요추정)

  • 김종형;이승재;조범철
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.2
    • /
    • pp.43-52
    • /
    • 2001
  • 대부분의 관측교통량기반 수요추정기법은 소규모 및 중규모 교통망 등의 상대적으로 규모가 작은 교통망에서 기본적으로 가정된 수요를 가지고 얻은 추정O/D를 기본O/D와 비교하여 그 추정의 정확성이 어느 정도인가를 오차분석법 등을 이용하여 비교.분석하는 것이 그 주요한 분석방향이라고 할 수 있었다. 이러한 접근법은 실제 현실에서는 알 수 없는 참O/D나 참관측교통량을 가정하고 제시된 모형을 면밀히 관찰하여 모형의 장단점이 무엇인지를 파악하거나 타모형과의 비교.분석을 용이하게 하고자 할 때 많이 이용된다. 그러나 이러한 가정된 교통망이나 참O/D(true O/D) 등은 모형의 적용가능성을 살필 경우에 이용 가능한 방법이라고 할 수 있지만, 참O/D를 알지 못하는 현실상황(대규모 교통망)에서는 추정O/D의 신뢰성을 평가하기란 매우 힘든 작업이거나 거의 불가능한 일이라 할 수 있다. 이러한 문제점을 보완하고자 본 연구에서는 서울시의 1996년도 교통센서스 자료를 이용하여 가정된 수요가 아닌 실제적이고 현실적인 자료를 가지고 대규모 교통망에서 이용될 수 있는 모형을 살펴보았다. 연구방법은 대규모 교통망에 기존의 단일차종기반모형과 본 연구에서 제시한 다차종(multiclass)기반모형을 적용하여 추정된 O/D에 TLFD(Trip Length Frequency Distribution)개념을 이용하여 추정된 O/D의 신뢰성을 평가하고자 하였다. 또한, $R^2$를 이용하여 모형 적용 전후의 관측교통량과 배분교통량을 비교하여 추정력을 분석하였다. 본 연구에서는 단일차종기반모형보다는 차종간 혼잡효과 및 노선선택비율을 차종별로 감안할 수 있는 다차종기반모형이 대규모교통망에서는 보다 적절한 결과를 나타내는 것으로 분석되었다.

  • PDF

Fault Tolerant Control of a Servo Manipulator for Teleoperation by Control Allocation to Redundant Joints (여유 자유도에 대한 조종력 배분을 통한 원격작업용 서보 매니퓰레이터의 내고장 제어)

  • 진재현;박병석;안성호;윤지섭
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.53 no.4
    • /
    • pp.235-245
    • /
    • 2004
  • In this paper, fault tolerant mechanisms are presented for a servo manipulator system designed to operate in a hot cell. A hot cell is a sealed and shielded room to handle radioactive materials, and it is dangerous for people to work in the hot cell. So, remote operations are necessary to handle the radioactive materials in the hot cell. KAERI has developed a servo manipulator system to perform such remote operations. However, since electric components such as servo motors may fail by radiation, fault tolerant mechanisms have to be considered. For fault tolerance of the servo manipulator system, duplication mechanism increasing the reliability of the transport's driving motors and reconfiguration algorithm accommodating the slave's motor failure have been presented. The reconfiguration algorithm recovering the end effector's motion in spite of one motor's failure is based on control allocation redistributing redundant axes. The constrained optimization method and pseudo inverse method have been adopted for control allocation. Simulation examples and real test results have been presented to verify the Proposed methods.

A Study on the Estimation Standard of Optimal Construction Duration for Reinforced Concrete Apartment House (철근콘크리트조 공동주택 적정공기 산정기준에 관한 연구)

  • Chun Young-Gee;Lee Gye-Uk;Kim Yang-Taek;Hyun Chang-Tae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.531-534
    • /
    • 2001
  • At the beginning of construction, the estimation for the construction duration is very important to effectively control and use labors, builder's equipment, permanent and temporary materials, supplies and utilities, and money. In spite of the importance of the estimation for the construction duration, there is no estimation standard of optimal construction duration in korea. The purpose of this study is to suggest the estimation standard of optimal construction duration that is reasonable and systematical through developing the method for estimating, the construction duration. it is expected to be helpful for estimating, planning and scheduling. The analysis is executed the existing estimation standards and consulting the results of the interviews with the on-site engineers and the concrete compressive stress tests.

  • PDF

Productivity analysis using a Fleet Management System for Construction Equipment (건설장비 플릿관리 시스템 적용시 생산성 분석)

  • Lim, So-Young;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.1
    • /
    • pp.87-95
    • /
    • 2020
  • With the advent of the 4th industrial revolution and the combination of IoT, there have been diverse domestic and foreign researches for the development of construction industry. Especially, in the large-scale earthwork site where many and various construction equipments are put into, the control system between construction equipments is important for the increase of productivity. Thus, after developing the fleet management system for the optimum operation of construction equipments, the problems were checked and improved for each step in the process of application at site. In order to verify the site application process of the fleet management system for the optimum operation of construction equipments, the analysis on the productivity was performed by inputting the data used for the actual site and the site data using this system and then comparing the data through simulation. The analysis was limited to excavator and dump. In the results of the analysis, the rate of work per hour was increased to the range of 4 % while the cost price was decreased to 4 %. Even though the results of the analysis could be different depending on the site applied, the results showing the increase of workload of equipments and the decrease of cost price in the complex project at earthwork site verify the increase of productivity.