• Title/Summary/Keyword: 작업선배정

Search Result 13, Processing Time 0.023 seconds

An Optimization Model for Assignment of Freight Trains to Transshipment Tracks and Allocation of Containers to Freight Trains (화물열차 작업선배정 및 열차조성을 위한 수리모형 및 해법)

  • Kim, Kyung-Min;Kim, Dong-Hee;Park, Bum-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.5
    • /
    • pp.535-540
    • /
    • 2010
  • We present an optimization model for how to assign the freight trains to transshipment tracks and allocate the containers to the freight trains in a rail container terminal. We formulate this problem as a multi-criteria integer programming to minimize the makespan of job schedule and simultaneously to maximize the loading throughput, i.e. the number of containers to be disposed per day. We also apply our model to the instance obtained from the real-world data of the Uiwang Inner Container Depot. From the experiments, we can see an improvement of approximately 6% in makespan, which means that our model can contribute to the improvement of the disposal capacity of containers without additional expansion of facilities.

Scheduling System using CSP leer Effective Assignment of Repair Warrant Job (효율적인 A/S작업 배정을 위한 CSP기반의 스케줄링 시스템)

  • 심명수;조근식
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2000.11a
    • /
    • pp.247-256
    • /
    • 2000
  • 오늘날의 기업은 상품을 판매하는 것 뿐만 아니라 기업의 신용과 이미지를 위해 그 상품에 대한 사후처리(After Service) 업무에 많은 투자를 하고 있다. 이러한 양질의 사후서비스를 고객에게 공급하기 위해서는 많은 인력을 합리적으로 관리해야 하고 요청되는 고장수리 서비스 업무를 빠르게 해결하기 위해서는 업무를 인력들에게 합리적으로 배정을 하고 회사의 비용을 최소화하면서 정해진 시간에 요청된 작업을 처리하기 위해서는 인력들에게 작업을 배정하고 스케줄링하는 문제가 발생된다. 본 논문에서는 이러한 문제를 해결하기 위해 화학계기의 A/S 작업을 인력에게 합리적으로 배정하는 스케줄링 시스템에 관한 연구이다. 먼저 스케줄링 모델을 HP 사의 화학분석 및 시스템을 판매, 유지보수 해 주는 "영진과학(주)"회사의 작업 스케줄을 분석하여 필요한 도메인과 고객서비스전략과 인력관리전략에서 제약조건을 추출하였고 여기에 스케줄링 문제를 해결하기 위한 방법으로 제약만족문제(CSP) 해결기법인 도메인 여과기법을 적용하였다. 도메인 여과기법은 제약조건에 의해 변수가 갖는 도메인의 불필요한 부분을 여과하는 것으로 제약조건과 관련되어 있는 변수의 도메인이 축소되는 것이다. 또한, 스케줄링을 하는데에 있어서 비용적인 측면에서의 스케줄링방법과 고객 만족도에서의 스케줄링 방법을 비교하여 가장 이상적인 해를 찾는데 트래이드오프(Trade-off)를 이용하여 최적의 해를 구했으며 실험을 통해 인력에게 더욱 효율적으로 작업들을 배정 할 수 있었고 또한, 정해진 시간에 많은 작업을 처리 할 수 있었으며 작업을 처리하는데 있어 소요되는 비용을 감소하는 결과를 얻을 수 있었다. 검증하였다.를, 지지도(support), 신뢰도(confidence), 리프트(lift), 컨빅션(conviction)등의 관계를 통해 다양한 방법으로 모색해본다. 이 연구에서 제안하는 이러한 개념계층상의 흥미로운 부분의 탐색은, 전자 상거래에서의 CRM(Customer Relationship Management)나 틈새시장(niche market) 마케팅 등에 적용가능하리라 여겨진다.선의 효과가 나타났다. 표본기업들을 훈련과 시험용으로 구분하여 분석한 결과는 전체적으로 재무/비재무적 지표를 고려한 인공신경망기법의 예측적중률이 높은 것으로 나타났다. 즉, 로지스틱회귀 분석의 재무적 지표모형은 훈련, 시험용이 84.45%, 85.10%인 반면, 재무/비재무적 지표모형은 84.45%, 85.08%로서 거의 동일한 예측적중률을 가졌으나 인공신경망기법 분석에서는 재무적 지표모형이 92.23%, 85.10%인 반면, 재무/비재무적 지표모형에서는 91.12%, 88.06%로서 향상된 예측적중률을 나타내었다.ting LMS according to increasing the step-size parameter $\mu$ in the experimentally computed. learning curve. Also we find that convergence speed of proposed algorithm is increased by (B+1) time proportional to B which B is the number of recycled data buffer without complexity

  • PDF

Evaluation of Waterway Dredging Work using Spud Dredge Process Management System (스퍼드 준설선 공정관리시스템을 이용한 항로준설작업의 평가)

  • Lee Joong-Woo;Jeong Dae-Deuk;Cho Jueng-Eon;Kim Ju-Young;Oh Dong-Hoon
    • Journal of Navigation and Port Research
    • /
    • v.29 no.5 s.101
    • /
    • pp.395-402
    • /
    • 2005
  • The most important point when we engage on waterway dredging work is supplying safe navigational passage to the vessels underway by narrowing dredge work area and removing submerged dangers. In order to meet this end it is necessary to use auxiliary equipment for shifting actively and mooring and adopt automation of dredging work by integrating information on real time position, dredging depth, and work information. The dredger with a spud control system in this study, by the way, is able to employed on continuous dredging work with the narrowest working area allowing wide and safe passages to vessels underway, by moving the dredger to the working zone with the spud controlled automatically. Furthermore, it has been improved definitely compared with the existing dredging process management system such that it shows the track of spud and working depth on the electronic navigation chart of window, together with the final outcome of dredging work. The test dredging work at the entrance of Busan North Port for system evaluation showed that actual working time available was twice of the one by the existing anchor system, and that it reduced $38\%$ of time for preparation work and one man power.

Evaluation of Waterway Dredging Work using Spud Control System (스퍼드제어시스템을 이용한 항로준설작업의 평가)

  • Lee, Joong-Woo;Jeong, Dae-Deuk;Cho, Jueng-Eon;Oh, Dong-Hoon;Keum, Dong-Ho
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.29 no.1
    • /
    • pp.263-271
    • /
    • 2005
  • The most important point when we engage on waterway dredging work is supplying safe navigational passage to the vessels underway by narrowing dredge work area and removing submerged dangers. In order to meet this end it is neccessary to use auxiliary equipment for shifting actively and mooring and adopt automation of dredging work by integrating information on real time position, dredging depth, and work information. The danger with a spud control system in this study, by the way, is able to employed on continuous dredging work with the narrowest working area allowing wide and safe passages to vessels underway, by moving the dredger to the working zone with the spud controlled automatically. Furthermore, it has been improved definitely compared with the existing dredging proccess management system such that it shows the track of spud and working depth on the electronic navigation chart of window, together with the final outcome of dredging work. The test dredging work at the entrance of Busan North Port for system evaluation showed that actual working time available was twice of the one by the existing anchor system, and that it reduced 38% of time for preparation work and one man power.

  • PDF

A Study on the Assigning Track of Freight Trains in a Rail Container Terminal (철도 터미널 화물열차 작업선배정에 관한 연구)

  • Kim, Kyung-Min;Park, Bum-Hwan;Kim, Dong-Hee;Hong, Soon-Heum
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1209-1214
    • /
    • 2010
  • In these days, rail container service is being more important because it has relatively simple network. In addition, small lot sizes of shipment, frequent shipment, and demand for flexible service are important characteristics in rail container transportation. Efficient container operation at terminals is important in reducing transportation costs and load/unload time. This paper describes the assigning track of freight trains in the railway freight terminal. The paper addresses the operational requirements and facility restrictions to construct a mathematical model for track assignment. In addition, it suggests several types of objectives for the model.

  • PDF

A Study on the Job Dispatching using AutoMod (AutoMod를 활용한 효율적 작업배정에 관한 연구)

  • Kim, Bong-Sun;Lee, Seung-Moo;Lee, Seog-Hwan
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2007.11a
    • /
    • pp.163-180
    • /
    • 2007
  • The purpose of this paper is to develop an efficient production strategy with changing factors to influence the productivity. The factors would be the number of Multi-Function worker, the method of job dispatching, and lot size. A simulation model has been developed for this study. We used AutoMod simulation and the process activity was animated to follow the flow of process easily. The alternatives have been tested through the simulation model, and the various alternatives is proposed for the efficient production strategy. We hope that the system is applied to similar types of small and medium-sized enterprises to develop an efficient production strategy and to achieve the satisfactory result.

  • PDF

A Study on the Job Dispatching using AutoMod (AutoMod를 활용한 작업배정에 관한 연구)

  • Kim, Bong-Sun;Lee, Seung-Moo;Lee, Seog-Hwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.6
    • /
    • pp.181-191
    • /
    • 2007
  • The purpose of this paper is to develop an efficient production strategy with changing factors to influence the productivity. The factors would be the number of Multi-Function worker, the method of job dispatching, and lot size. A simulation model has been developed for this study. We used AutoMod simulation and the process activity was animated to follow the flow of process easily. The alternatives have been tested through the simulation model, and the various alternatives is proposed for the efficient production strategy. We hope that the system is applied to similar types of small and medium-sized enterprises to develop an efficient production strategy and to achieve the satisfactory result.

Standards of Distance between Gas Pipeline and Tower Ground (가스배관과 철탑접지의 이격거리 관련 기준)

  • Lee, H.G.;Ha, T.H.;Ha, Y.C.;Bae, J.H.;Kim, D.K.
    • 한국가스학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.191-195
    • /
    • 2006
  • Because of the continuous growth of energy consumption and also the tendency to site gas pipeline and power line along the same route, the close proximity of power lines and buried metallic pipelines has become more and more frequent. The lightning strokes collected by an electric substation or power line tower might cause arcing through the soil to an adjacent gas pipeline. This paper gives the outline of the resistance coupling and the standards of distance between gas pipeline and tower ground.

  • PDF

Standards of Distance between Gas Pipeline and Tower Ground (가스배관과 철탑접지의 이격거리 관련 기준)

  • Lee, H.G.;Ha, T.H.;Ha, Y.C.;Bae, J.H.;Kim, D.K.
    • Journal of the Korean Institute of Gas
    • /
    • v.11 no.1 s.34
    • /
    • pp.18-22
    • /
    • 2007
  • The fault current through the earth originated from a power line ground fault might cause arcing through the soil to an adjacent pipeline, which might bring about not only a catastrophic accident such as gas explosion and oil leakage but also a hazard to the safety of workers responsible for the maintenance and repair of the pipeline. In this paper we investigated the arcing phenomena through soil between a power line tower and a pipeline and outlined the standards for the separation distance of a buried pipeline adjacent to the power line tower.

  • PDF

The Effects of Computer-Based Cognitive Rehabilitation and Traditional Cognitive Training on the Working Memory and Executive Function in Patients with Mild Traumatic Brain Injury (전산화 인지재활과 전통적 인지훈련이 경도 외상성 뇌손상 환자의 작업기억과 실행기능에 미치는 영향)

  • Moon, Jong-Hoon;Yang, Seung-Bum;Jeon, Min-Jae
    • Journal of Korea Entertainment Industry Association
    • /
    • v.13 no.6
    • /
    • pp.277-286
    • /
    • 2019
  • The aim of this study was to investigate the effects of computer-based cognitive rehabilitation and traditional cognitive training on the working memory and executive function of patients with mild traumatic brain injury. The sample consisted of 20 patients with mild traumatic brain injury who had received rehabilitation treatment in a rehabilitation unit. The subjects were assigned to either the experimental (n = 10) or control group (n = 10). The experimental group received computer-based cognitive rehabilitation and traditional cognitive training for 60 minutes, whereas the control group received only traditional cognitive training for 60 minutes. Both the groups received their respective interventions for 60 minutes a day and 5 times per week across a period of 4 weeks. Working memory and executive function were assessed using the digit span test (forward and backward), visual memory 1 and 2 of the Motor-free Visual Perception Test-3, trail making test, and Stroop test (A and B) both before and after the intervention. The experimental group showed a significantly greater improvement in visual memory and performance on the Stroop test A than the control group. These findings suggest that computer-based cognitive rehabilitation and traditional cognitive training are more effective in promoting positive changes in the working memory and executive function of individuals with mild traumatic brain injury than traditional cognitive training.