• Title/Summary/Keyword: 자재 및 공정관리

Search Result 75, Processing Time 0.031 seconds

MIMO control system design using ATmega2560 (ATmega2560을 활용한 다중 입출력 제어 시스템 설계)

  • Jung, Jae-Hun;Jung, Soo-Sung;Kim, Young-Gon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.05a
    • /
    • pp.728-731
    • /
    • 2015
  • Nowadays, the majority of the manufacturing plant equipment tend to be transformed with automation system than traditional manual equipment. Production manager to make the process decision-making, not accustomed to manage and take advantage of professional decision-making technique. So rather than using the system proposed, it is common to undergo sporadic measures through the external intermediary. In this paper, whether possible delivery to match the delivery through the issue and decision-making system of the data input to be generated in the manufacturing process, review the supply information of the material used in the process, a plurality of input / output device We have proposed an input module that utilizes the Android Application and ATmega2560. As a result, easily cope with the improvement and change of process information of the work efficiency of the production business of the manufacturing process, and reduced plant data missing tasks, and management improvement to the improvement of the delivery compliance and product satisfaction by improving productivity we try to contribute to.

  • PDF

설계기준해설 - 과거 터널현장 국부적인 붕락 유형 사례 연구

  • Kim, Nak-Yeong;Hwang, Yeong-Cheol
    • 지반과기술
    • /
    • v.10 no.4
    • /
    • pp.20-31
    • /
    • 2013
  • 본 터널 붕락 사례 연구를 종합적으로 분석해 볼때, 시공 공정 중에 발생 가능한 붕괴 및 붕락은 앞서와 같이 과거의 여러 사례들을 토대로 분석함으로서 예측 할 수 있지만, 시공 외적인 요인에 대해서는 사실상 조사, 설계, 시공 중의 오류에 의해 발생되는 것이기 때문에 파악하기 어렵다. 본 터널 붕락사례를 통해 원인을 분석 정리 하면 다음과 같다. (1) 불규칙한 지반구조적 원인 대부분의 터널 붕락을 일으키는 불규칙한 지반구조는 과거 지반구조의 침식 또는 대규모 지반운동 등 지반구조의 급속한 변화에 기인한 것이다. 터널 시공전에 면밀한 사전 지반조사와 선진 보오링 등으로 정확한 지반구조를 파악한다면 이로 인한 터널 붕락은 최소화 시킬수 있다. (2) 기획과 설계단계에서의 오류 충분치 못한 지반조사에 의한 설계 및 부적절한 시공자재 사용등으로 터널 붕락이 발생 될수 있다. 터널 굴착 주변 지반조건과 이러한 지반조건에 적합한 터널 굴착 및 보강공법 등이 터널 설계시 심도있게 검토되어야 할 가장 중요한 요소이다. (3) 시공 및 관리에서의 오류 경험이 부족한 터널기술자의 현장 감독과 현장에서 수집되는 각종 계측자료의 신뢰성 부족과 결과의 재적용 미흡으로 효율적인 계측 및 지반정보를 활용한 정밀 시공이 이루어지지 않는 것도 터널 붕락의 중요한 요인으로 분석되었다. (4) 현장관리 조사서의 표준화 부족 터널굴착공사중 붕락이 발생된 현장의 막장조사결과를 보면 조사자가 임의로 표시를 하여 각 터널별 막장조사결과가 매우 상이할 뿐만 아니라 각 터널별로 기재방법, 양식이 달라서 실제 원인분석에 활용하기가 어려운 것으로 분석되었다.

  • PDF

A Demand Analysis of Locational, Morphological Information for Informative Construction Technology Based on u-GIS (u-GIS기반 건설정보화를 위한 위치, 형상 정보 수요 분석)

  • Jeong, Tae-Ung;Park, Jae-Seon;Kim, Jong-Hwa;Kim, Nam-Gyun;Gang, Nam-Gi;Pyeon, Mu-Uk
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2008.10a
    • /
    • pp.278-282
    • /
    • 2008
  • U-국토 및 U-도시의 건설 및 관리를 위해 정밀 국토공간정보의 수요가 점증하고 있고 보다 신속한 갱신이 요구되고 있는 가운데 유비쿼터스 기술들과 융복합된 u-GIS기술에 대한 요구 또한 증가하는 추세다. 특히 건설 분야에 있어서의 이러한 수요를 보다 심층적으로 파악하기 위해, 건설공사 표준품셈 등을 이용하여 건설공사 공종/공정을 분류하고 이에 대한 수요의 우선순위를 도출하는 연구를 수행하였다. 본 논문은 u-GIS 기술을 필요로 하는 건설 현장에 위치/형상 정보 수요에 대한 조사, 분석을 통해 건설 인력, 자재, 장비의 u-GIS 기술의 적용 우선순위를 도출하는 것이다.

  • PDF

The Establishment of Roles and Titles of Quality Control Personnel for Construction Project Quality Assurance (건설공사 품질확보를 위한 품질관리 관련자의 역할 및 호칭 정립)

  • Lee, Chang-Hyo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.871-878
    • /
    • 2017
  • The quality control personnel of the construction work shall establish and execute the quality control plan or the quality test plan and check the qualification of the used materials according to the process, the management of the test and inspection equipment, the quality education, the own quality inspection and measures. Management and quality test of Korea and plays an important role in preventing accidents. However, related organizations did not explicitly disclose their roles in quality testing and quality control tasks while changing the names of quality control personnel to test personnel and quality managers when revising related laws and regulations and the application of labor costs. Therefore, a research of this is needed to improve conflicting situation. In this study, the ambiguous title relation to the quality control persons is improved to meet the requirements of the construction work based on related laws and regulations, and each role and title is classified as 'quality tester' and 'quality manager'. In other words, the person who carries out the quality test of the "Construction Quality Test Standard" specified in the Guideline for Quality Management of Construction Projects shall be the "Quality Tester" and the person who performs the quality control plan establishment and execution work specified in the Enforcement Rule of the Construction Technology Promotion Act shall be referred to as the 'Quality Manager'.

Study on Development for Plan Model of Tunnel construction by using Arena;on focused NATM (ARENA를 활용한 터널공사계획모델 개발에 관한 연구;NATM공법을 대상으로)

  • Lee, Si-Wook;Kim, Ok-Ki;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.872-875
    • /
    • 2007
  • Estimation of total construction period and cost in the early stage of the project is very important. Simulation is one of the method considering proper compound such as tools, materials for effective construction management and estimating and analysing affected factors to construction through making suitable process. This study is to develop the model by using Arena simulation considering limited facts like blast time in a subway tunnel construction of both sides inner city. Developed model is easily useful type by using Visual Basic program, and can obtain total construction period and cost as a result. It could be used as a decision making tool in early stage of the construction.

  • PDF

Implementing Activity-based LCA Model for Carbon Dioxide Emission Analysis and Allocation of Environment Cost (세부 공정별 CO2 배출 분석 및 환경비용 원가배분을 위한 Activity-based LCA 모델의 도입 - 커튼월 공사를 중심으로 -)

  • Lim, Ji-Youn;Yi, June-Seong;Shin, Seung-Woo;Son, Jeong-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.78-88
    • /
    • 2012
  • As worldwide efforts to reduce global warming gases, the construction Industry is endeavoring to diminish carbon dioxides emissions. Especially, by introducing the LCA methodology to the industry, A variety of related studies to measure the emission of carbon dioxides have been conducted. However, when the conventional LCA methodology is applied to the construction projects, some limitations have been reported. To overcome the restrictions derived from the industry characteristics, this research suggested the Activity-based LCA model by applying the Activity-based Costing (ABC), which breaks down the whole life cycles into more detailed stages. By implementing the newly developed model, forecasting accuracy of $CO_2$ emission was elevated, and the critical control points on carbon dioxides were established. Through the case study of aluminium curtain-wall system, this research verified the usefulness of the Activity-based LCA.

A Study on the Comparison of Building Data Using 3D Scanning (3D 스캐닝 활용 건축물 데이터 비교에 관한 연구)

  • Hwang, Byeong Yeon;Park, Jong Ki;Lee, Tae Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.2
    • /
    • pp.50-56
    • /
    • 2021
  • This study examines 3D scanning and how it is used in the construction field. 3D scanning technology was applied to a real space and compared with drawings in the planning and construction stages. 3D scanning technology has been widely applied in the field of construction, design, construction, and safety. The results of comparing 3D scanning data with drawings are as follows. First, the external shape and dimensions do not show much difference. Second, the internal shape and dimensions are different. Third, indoor lighting layouts are different in all buildings. 3D scanning should be an essential element in the construction stage before completion and should be used for supervision tasks such as material management, improving the efficiency of construction, and safety management through continuous 3D scanning using automation and robots. Follow-up studies in the field of architecture, such as BIM and process management, will be needed.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

A Development of Task Generator through an Analysis of Task Location Information Structure (작업위치 정보체계 분석을 통한 작업정보 생성기 개발)

  • Chin Sangyoon;Kang Woo-Young;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.64-71
    • /
    • 2004
  • A daily report is one of the critical documents in construction projects, since it helps them keep track of various as-built information. Despite the important role in progress management, the daily reporting process is time-consuming, and the representation of task information on daily reports are not effective enough to accumulate daily as-built information for further use in project management. Task information is composed of a specific work type and a location where the task is performed, which means that the same type of work is repeated over the locations. However, in many cases the task locations are described differently depending on a reporter's preference or experience. Without representing task location information effectively, it is difficult to accumulate and to reuse as-built information. The objective of this research is to build a framework for generating task information which can be efficiently accumulated and reused for progress management. To do so, this research built a task information model with focusing on the representation of task location associated with a work type, and developed an information system that supports automated and interactive generation of task information.