• Title/Summary/Keyword: 자원조달계획

Search Result 14, Processing Time 0.015 seconds

A Study on the Optimal Size of Government Subsidies to Accomplish the Target Rate for Self-development of Crude Oil (석유자주개발 목표율 달성을 위한 정부지원금의 적정 규모 연구)

  • Kim, Jin Hyung
    • Environmental and Resource Economics Review
    • /
    • v.20 no.4
    • /
    • pp.859-882
    • /
    • 2011
  • Since two oil crises in the 1970s, Korea has actively engaged in overseas E&P projects to increase energy diversity as well as its self-development rate of energy resources. Korea's energy self-development rate, an index that indicates the ratio of resources acquired through overseas development compared to direct imports. Currently, Korea is conducting a total of 180 promising overseas oil development projects in 36 countries as of the end of 2010. By now, it has secured a reserve of around 1.63 billion barrels and production of around 176 thousand barrels of oil per day. The self-development rate for oil rose from 2.8% in 2006 to 7.4% in 2010. Not content with these remarkable successes, the korean government is planning to raise its self-development rate in oil to 25% by 2019, by promoting the active participation of Korean companies in overseas oil development projects. This paper is concerned with estimation of the required amount of government subsidies that includes loans and financial support through state-controlled banking institutions in order to reach the target 25% rate by 2019. The estimation results shows that government subsidies of at least 268 million dollars are needed for the current rate of 7.4% in oil. However, the amount sharply increases up to 1.25 billion dollars in 2019 when domestic oil demand rises to 1.02 billion barrels.

  • PDF

자동차 ALC에 대응하는 Job Shop의 동기화 생산시스템에 관한 연구

  • 권보식;김경섭
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1997.04a
    • /
    • pp.100-100
    • /
    • 1997
  • 본 연구에서는 우리 자동차산업이 직면한 총체적인 위기상황을 극복하기 위한 방 안으로, 자동차 생산방식의 변혁, 인적자원관리의 혁신을 통한 생산성 제고, 독자 기술개발 능력의 조기확보, 효율적인 부품조달체제의 형성 등 산업전반에 걸친 혁신으로, 내적인 경 쟁력을 축적함과 동시에, 지역주의화의 진전에 따른 수출 여건의 악화를 극복하기 위해 선 진권 및 개발도상국으로의 현지화 노력이 적극적으로 추진되지 않으면 안될, 중대한 시점에 와 있다고 진단하면서, 본 연구의 목적을, 생산현장을 중심으로 한 내적 경쟁력 확보로 정 의하고, 그 실현방안으로서, 급변하는 시장환경에 적극 대응하기 위한 생산방식의 도입과, 이를 지원하는 생산정보시스템의 구축 모델을 제시하고자 한다. 첫 번째는, 변화가 급격한 시장환경에 적극 대응하는 생산방식의 도입으로, 철저한 낭비 배제 사상 - 생산현장의 낭비 소요를 배제(개선)하는 것만이 아니라 배제하고 바로 체계를 바꾸어 (개혁) 원래의 상태로 되돌아가지 않도록 하는 -을 기본으로, 정보, 관리, 생산, 제품, 물류 등에 관련된 손실 비 용을 감축시킴으로서 원가를 낮추고, 고객이 요구하는 다양하고, 좋은 품질이 제품을 신속 히 공급할 수 있는 체계를 갖추는 것이다. 이러한 낭비 배제 사상은 생산현장에서 필요한 것을, 필요한 때에, 필요한 만큼 만들고 운반하며 전달하는 관리 개선 등을 의미하며, 이것 을 적은 인원 및 설비로 최대한 빨리 (리드 타임의 단축), 계획대로 수행하도록 하는 것이 동기화 생산방식이다. 따라서, 본 연구에서는 자동차 생산공정 중 주 조립공정의 ALC(Assembly Line Control)에 대응하여, 선행 공정으로서 부품을 공급하는 Job Shop의 동기화 생산방식을 실제 적용한 사례 중심으로 전개하고자 한다. 두 번째의 접근방식은, 동 기화 생산방식에 컴퓨터 통합생산 (CIM, Computer Integrated Manufacturing)의 기술을 구 현, 적용하는 것이다. 즉, 동기화 생산 시스템 (SPS, Syncronized Production Sytem)을 구 축하는 것인데, 이것은 최신의 컴퓨터 기술을 생산현장에 적용함으로써 새로운 생산방식의 혁신에 버금가는 기술혁신이라 할 수 있을 것이다. 따라서, 이러한 접근은 컴퓨터 및 통신 기술의 눈부신 발전을 기초로 가능해진 것인데, 제조업에서의 심각한 고비용, 저효율 문제 를 해결하기 위해 필수적으로 도입해야만 하는 실정이다. 또한 소비자의 다양한 요구로 인 하여 제품의 종류와 사양면에서 심한 변동을 보이는 시장 수요에, 신속한 정보처리로 대응 하는데도 크게 기여하고 있다. 이에 본 연구에서는, 자동차 Job Shop의 동기화 생산방식을 지원하는 동기화 생산시스템의 구축 모델을 제시하고자 한다.

  • PDF

VRIO Model Based Enterprise Capability Assessment Framework for Plant Project (VRIO 모델 기반의 기업역량평가 프레임워크 제시에 관한 연구 - 플랜트 사업을 중심으로 -)

  • Min, Byeong Su;Min, Jang Hee;Jang, Woosik;Han, Seung-Heon;Kang, Sin Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.61-70
    • /
    • 2016
  • Construction enterprises have performed various projects such as buildings, infrastructure and plant projects in the international market. Among these, the plant project's amount of orders accounted for about 68.9% of all. However, because of the enterprises won a contract with a low-budget for plant project in the last 10 years, the profit has dropped dramatically. And it is forecasted that there are extreme competition for bid award of plant projects because of the current falling oil prices and raising interest rates. In this circumstance, the comprehending of enterprises strength and weakness must be a priority to get a sustainable competitive advantage. Therefore this research suggests the enterprises's capability assessment framework and it is in order to diagnose the korean construction enterprises capabilities. The framework is based on the VRIO model that is on the basis of resource based theory. First, the capability assessment indices and their importance and priority that based on the life-cycle of plant project is deducted by literature review and survey. Second, the 5 point likert score applied VRIO survey is conducted to diagnose the enterprises and quantified the survey result using the fuzzy theory. Lastly, the competitvie implication and capability assessment are deducted.

Development of PLM Prototype for Conceptual Design of Marine Vessels (선박의 초기설계 제품정보관리를 위한 PLM 시스템 원형 개발)

  • Lee, Chan-Woo;Lee, Jang-Hyun;Lee, Kyung-Ho;Lee, Jae-Beom;Kim, Dae-Seok;Seo, Heung-Won
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.6
    • /
    • pp.543-553
    • /
    • 2008
  • Shipbuilding is a kind of ETO(Engineering To Order) industry which designs and produces a product in accordance to various requirement of customers, rules and regulations. Recently, the number of ordered ships has been increased by up to two or three times in each domestic shipyards. Most shipyards have been adopted 3D ship CAD, ERP(Enterprise Resource Planning) and APS(Advanced Planning System) to get an efficient product development and manufacturing system. However, not only the effective operation of 3D ship CAD, ERP and APS but also the production efficiency can be achieved only if product information management which can manages the product data is implemented in an integrated environment. Present study has suggested a systematic approach to implement a PLM system to manage the product data in early design shipbuilding. Also, a prototype of PLM is implemented to manage the product data in a basic ship-design. In the prototype system, a product structure and architecture of PLM is considered.