• Title/Summary/Keyword: 자갈도상궤도

Search Result 65, Processing Time 0.026 seconds

A Study on an improvement of Ballast Track turnout in Subway bridge(I) (지하철 고가부 자갈도상 분기기 궤도구조의 생력화 방안(I))

  • Sung, Deok-Yong;Choi, Jung-Youl;Kim, Jun-Hyung;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.325-339
    • /
    • 2007
  • This paper presents the analysis results to evaluate the application of separation sleeper boot of turnout in concrete track in subway. An analysis includes the dynamic load on turnout-bridge and the ballast improvement method of upbound and down line independent girder in servicing line. From the results, the aspect and the property of separation sleeper boot of turnout are evaluated. FE analysis explain the relationship between independent bridge and track behaviour of dynamic loads. The assessment of application based on FE analysis results in a good improvement method of servicing subway line is proposed.

  • PDF

The Dry Cleaning Machine to Recycling the used Ballast as a Aggregate of the Paved Track (포장궤도 골재로서의 도상자갈 재활용을 위한 건식세척장치)

  • Lee, Il-Wha;Lim, Jong-Il;Lee, Soon-Gu
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1525-1529
    • /
    • 2009
  • Washed ballast is used on paved track to earn the high quality track performance. But, the water washing system caused the several environment problems such as the noise, dust and water pollution. Even if the washing is performed, it is difficult to earn the high quality because of the low efficiency of the water washing system. So, we developed the dry cleaning type machine to solve these problems. This machine excludes using the water completely. Especially, it is possible to organize on the conventional ballast cleaning train set.

  • PDF

A study on the Dynamic Behaviors of Track due to Deterioration characteristics of Ballast(II) (자갈도상의 노후화에 따른 궤도구조의 동적거동에 관한 연구(II))

  • Seo Su-Euen;Park Yong-Gul;Choi Jung-Youl
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.854-859
    • /
    • 2005
  • The major objective of this study is to investigate the dynamic behaviors of track due to the deterioration characteristics of ballast for servicing tracks by the field test. The durability of ballast plays an important role in the track behaviour. To estimate the deterioration characteristics of ballast, several tests have been carried out by several shcolars. The deterioration characteristics of ballast is one of the most important factor in the dynamic behaviour of track and its life. In this paper abrasion/breakage characteristics of ballast is studied to predict the effect of physical ballast characteristics on ballast track. To reveal deterioration characteristics of ballast, the field test were carried out. The deterioration characteristics, studied in this paper, is applied to the dynamic behaviour of track in various conditions.

  • PDF

Evaluation of Impact Factor on Ballast Track in Subway using Field Test (지하철 자갈도상 궤도의 충격계수 평가)

  • Park, Kyun-Seo;Son, Chol-Su;Yun, Jong-Kyeong;Choi, Jung-Youl;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.484-493
    • /
    • 2006
  • This paper is presented the test results to evaluate the healthiness of the ballast in subway. The test includes the dynamic load test in servicing Line the screen classification test of aggregates and the wear test. From the results, the aspect and the property of the ballast are evaluated. The dynamic load tests the relationship between the deterioration of the ballast and the fluctuation of loads. The assesexplain sment of impact factor based on the field test results in a good property of test blocks is proposed.

  • PDF

A Study on the Test Construction Evaluation and Noise and Vibration Characteristics of Wireless Low-Floored Trams Trackway (무가선 저상트램 노면선로의 시험시공 평가와 소음·진동 특성연구)

  • Jeong, Young Do;An, Dong Geun;Jun, Jin Taek;Jeong, Woo Tae;Lee, Su Hyung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.6
    • /
    • pp.143-154
    • /
    • 2012
  • The wireless low-floored tram is an innovative transportation system which is environment-friendly and highly energy-efficient. In addition, the system has various advantages such as low construction cost, improvement of urban landscape, revitalization of surrounding commercial area, elevated convenience for passengers, etc. Therefore, more than ten local governments have proposed tram construction projects in Korea. Accordingly, many research and development projects are ongoing funded by government including the developments of tram vehicle, tram trackway, signal system, etc. The embedded rail system are commonly used in order to provide leveled roadway surface in urban area. It is effective to reduce the noise and vibration, caused at the interface between the wheel and track, to minimize the construction period, and to lower the maintenance cost. This paper investigated the design and construction processes for tram trackway and figured out the constructability for the test track with embedded rail system for the first time in Korea. The performance to reduce the noise and vibration were quantitatively measured in the test track with embedded rail system. In addition, the results were compared to the ones for track with conventional rail system.

Study of the Long-Term Behavior Characteristics of Roadbed on Concrete Track of High-speed Railway (고속철도 콘크리트 궤도상 토공노반의 장기거동 특성 연구)

  • Choi, Chan-Yong;Jung, Jae-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.8-16
    • /
    • 2018
  • This study examined the long-term behavior of a roadbed using high-speed railway concrete track and roadbed measurement data and evaluated the long-term performance of the track and roadbed. Recently, high-speed railway track type has been adopted as a concrete slab. On the other hand, the concrete track is vulnerable to roadbed settlement. In the case of gravel tracks, it is easy to restore the original state by maintenance even if the roadbed settles. On the other hand, in the case of the concrete track, if excessive settlement of the roadbed occurs, cracks are generated continuously on the slabs and sleepers, resulting in greatly reduced usability. For this reason, it is difficult to restore the original state only by partial maintenance. In this paper, a long-term performance evaluation was carried out on a concrete track during operation by monitoring the measurement data of sensors buried from the beginning of construction for approximately 3 years after the high-speed railway opened. Performance evaluation methods include a performance evaluation of track/roadbed when the train passes, long-term track and roadbed performance evaluation, analysis of the track/roadbed effect on long-term settlement and analysis of the factors influencing long-term settlement. The trail response of KTX-Sancheon was greatest in the track/roadbed performance evaluation by train. The results of the long-term track and roadbed performance evaluation were measured within the standard values. The track and roadbed performance impact assessment with long-term settlement was strongly related to TCL settlement. The influences of the water content and groundwater level were verified by analyzing the external factors of long-term settlement. Through such a method, the stability of a track/roadbed can be secured.

A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track (콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.405-411
    • /
    • 2009
  • Railway signaling system in a rapid transit using the ATC system the approved a speed limit to a train and a part of signaling system in a metro approved a distance which is possible to move. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.

Development and Assessment for Resilient Modulus Prediction Model of Railroad Trackbeds Based on Modulus Reduction Curve (탄성계수 감소곡선에 근거한 철도노반의 회복탄성계수 모델 개발 및 평가)

  • Park, Chul Soo;Hwang, Seon Keun;Choi, Chan Yong;Mok, Young Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2C
    • /
    • pp.71-79
    • /
    • 2009
  • This study is to develope the resilient modulus prediction model, which is the function of mean effective principal stress and axial strain, for three types of railroad trackbed materials such as crushed stone, weathered granite soil, and crushed-rock soil mixture. The model consists of the maximum Young's modulus and nonlinear values for higher strain, analogous to dynamic shear modulus. The maximum value is modeled by model parameters, $A_E$ and the power of mean effective principal stress, $n_E$. The nonlinear portion is represented by modified hyperbolic model, with the model parameters of reference strain, ${\varepsilon}_r$ and curvature coefficient, a. To assess the performance of the prediction models proposed herein, the elastic response of a test trackbed near PyeongTaek, Korea, was evaluated using a 3-D elastic multilayer computer program (GEOTRACK). The results were compared with measured elastic vertical displacement during the passages of freight and passenger trains at two locations, whose sub-ballasts were crushed stone and weathered granite soil, respectively. The calculated vertical displacements of the sub-ballasts are within the order of 0.6mm, and agree well with measured values. The prediction models are thus concluded to work properly in the preliminary investigation.

The Effect of Pile Distallation on the Reduction of Cumulative Plastic Settlement (말뚝 설치를 통한 콘크리트궤도의 누적소성침하 감소 효과)

  • Lee, Su-Hyung;Lee, Il-Wha;Lee, Sung-Jin;Kim, Dae-Sang
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.5
    • /
    • pp.129-137
    • /
    • 2008
  • An active application of concrete track is being expected far the future constructions of Korean railroad. In comparison with the existing ballasted tract, a concrete track is very susceptible for the settlement, since its rehabilitation requires much time and cost. When a concrete track is constructed on fine-grained subgrade soil, excessive cumulative plastic settlements due to repetitive train road may occur. In this case, the settlement of the concrete track may be effectively reduced by installing a small number of small-diameter piles beneath the track. This paper presents the effect of pile installation on the reduction of cumulative plastic settlement of concrete track. A method combining experiential equation and numerical method is proposed. Using an existing experiential equation and the estimated earth pressure distribution, the cumulative plastic strain was calculated. From the results, it is verified that the effects of the pile installation is significant to effectively reduce the cumulative plastic settlement of concrete track. The reduction effects of the cumulative plastic settlement according to the pile number and pile arrangement are presented.

A Study on Analysis Electrical Characteristics of Cable Lenght change about area Boundary of UM71C Audio Frequency Track Circuit (고속철도 AF궤도회로경계구간 케이블길이 변화에 따른 전기특성 분석연구)

  • Choi, Jae Sik;Kim, Hie Sik;Park, Ju Hun;Kim, Bum Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4849-4854
    • /
    • 2015
  • It has been often occurred for the outside components(BU, SVaC, DB) of UM71c AF track circuits to be broken down caused by some pieces of falling ice in the winter time or by infrastructure repairing equipments while facility maintenance works since 2004, opening of Kyeongbu High Speed Rail Express. In this paper, we proposed that we could move the outside components of UM71c track circuit out of wayside from present place. Then we can assure that the life time of those components would be extended. So we simulated the electrical characteristics by changing cable length using MATLAB Simulinks and we designed the compensation capacitor. Also, we obtained the same results as those of simulation by field demonstration test on site. The design specifications obtained from this field verification test could be applied in the absent section of track circuit, if only have a little more intensified research to compensate changed electrical characteristics and to redesign inner impedance of the track circuit.