• Title/Summary/Keyword: 인접 시공

Search Result 180, Processing Time 0.019 seconds

A Study on the Near Construction Range Considering the Factors Affecting the Stability of Water Tunnel (수로터널 안정성에 미치는 요소를 고려한 근접시공범위에 대한 연구)

  • Mingyu Lee;Donghyuk Lee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.5
    • /
    • pp.5-12
    • /
    • 2023
  • Recently, due to urban development and expansion, construction plans have been increasing adjacent to existing tunnel structures such as subways, roads, and large pipelines. Structural plans adjacent to existing tunnels have different effects on tunnel stability depending on the construction method, degree of proximity, and location of new structures. In particular, the pressure water tunnel shows a very large difference from other road tunnels and railway tunnels in geotechnical characteristics and operation characteristics. Therefore, it is necessary to review the safety zone due to adjacent construction in consideration of the geotechnical characteristics of the water tunnel and the new sturure construction method. In this study, the existing tunnel safety zone standards were investigated. A stability evaluation performed numerical analysis considering the deterioration of concrete lining in operation and the characteristics of water tunnel. In addition, the impact of vibration caused by pile construction and blasting excavation of new structures was reviewed. Based on this, a pressure water tunnel safety zone was proposed in consideration of adjacent construction.

송도국제도시 중앙대로 도시철도 인접구간 연약지반처리 시험시공 사례

  • Seo, Gwi-Chang;Gwak, Su-Jeong;Choe, In-Geol
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1222-1228
    • /
    • 2010
  • 본 연구는 인천 송도국제도시 중앙대로 구간의 도시철도공사와 인접한 연약지반 및 준설 매립층 개량공사와 관련하여 설계의 적정여부 판단 및 시공방안을 제시하기위해, 본공사에 앞서 시험시공을 통해 C.G.S의 개량효과를 확인하고 분석하였다. 시험시공결과 당초 설계제원에서 계획했던 개량효과가 만족되는 것으로 분석되었다.

  • PDF

A Characteristics of the Strength Recovery of the Soil Adjacent to the Pile Depending on the Construction Methods of a Environment-friendly Screw Concrete Pile for a Noise- and Vibration-free Method (무소음·무진동을 위한 환경친화적인 스크류콘크리트말뚝의 시공법에 따른 말뚝 인접 지반의 강도 회복 특성)

  • Kim, Dong-Chul;Choi, Youngkyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.1
    • /
    • pp.71-80
    • /
    • 2013
  • Before and after the test constructions, and after an 11-month hiatus from the pilot pile installations, the in-situ tests (CPT, SPT) were carried out at the ground adjacent to the noise- and vibration-free screw concrete piles installed by 2 kinds of construction methods (i.e., the toe-jetting shoe type, the pre-digging type). In the toe-jetting shoe type construction methods, after construction, the soil strength within 3.5D (where, D = pile diameter) from the pile center decreased greatly by about 46% of the original ground and, after an 11-month hiatus, a strength recovery adjacent to the piles appeared about 71% of the original ground. In the pre-digging type construction methods, a strength recovery adjacent to the piles appeared 100% of the strength of the original ground.

Study on Establishing Comprehensive Management Measures to Ensure Stability of Existing Metro when Constructing Ground Structures Adjacent to Subway (지하철 인접 지상구조물 설치시 기존 지하철 안정성 확보 위한 종합관리대책 수립 연구)

  • Jae-Hong Lim;Guk-Hwan Cho
    • Tunnel and Underground Space
    • /
    • v.34 no.3
    • /
    • pp.196-207
    • /
    • 2024
  • In this study, a comprehensive management plan was proposed to ensure the stability of the existing subway when constructing ground structures adjacent to the subway. In the first step, the measurement inspection cycle is selected through proximity evaluation, in the second step, the stability of existing subway and station structures such as displacement and stress is reviewed through 3D numerical analysis considering the construction stage and groundwater influence, and in the third stage, the safety of train operation was reviewed by examining the track stability, and based on the numerical analysis results in the fourth stage, the displacement concentration section was selected as an intensive management section and it was proposed that intensive measurement management be performed.

Effects of Tunnel Construction on an Existing Tunnel Lining (터널 근접시공이 기존터널 라이닝에 미치는 영향에 관한 연구)

  • Yoo, Chung-Sik;Song, Ah-Ran
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.4
    • /
    • pp.307-324
    • /
    • 2006
  • Effects of new tunnel construction on an existing tunnel are investigated in this paper. A parametric study was conducted on a number of conditions in terms of relative location of the new tunnel to the existing tunnel using 2D and 3D finite element models. The results indicated that the new tunnel construction imposes most severe effect on the existing tunnel's lining when located below the existing tunnel's springline for cases in which the new tunnel is constructed parallel to the existing tunnel. It is also revealed that the effect to the new tunnel construction is larger when the new tunnel is constructed under the existing tunnel than above for cases in which the new tunnel is crossed with the existing tunnel. Practical implications of the finding are discussed.

Design, Construction and Performance of A Removable Soil Nailing System (제거식 쏘일 네일링 공법의 설계 및 시공)

  • Kim, Hong-Taek;Ryu, Jeong-Soo;Jung, Sung-Pill;Kang, In-Kyu;Park, Si-Sam
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.3
    • /
    • pp.107-117
    • /
    • 2000
  • 쏘일네일 벽체는 국낸에서 과거 10년간 가시설 및 영구구조물에 상당수 시공되어 왔다. 그러나 쏘일네일링 공법은 많은 장점이 있음에도 불구하고 인접한 건물의 하부에 쏘일네일이 삽입되는 것을 허용하지 않아 제한적으로 사용되고 있는 실정이다. 따라서 본 논문에서는 쏘일네일이 인접한 건물의 하부에 삽입되는 문제를 해결하고 철근을 재활용할 수 있는 방안으로 제거식 쏘일네일링 공법을 소개하였다. 제서식 쏘일네일링 공법은 연직굴착시 가시설 흙막이벽체로 주로 사용할 수 있다. 제거식 쏘일네일의 인발특성을 규명하기 위해 총 23회의 현장인발실험을 실시하였으며, 이를 통해 고정자 소켓의 설치간격과 시멘트 그라우트의 W/C 비가 중요한 설계인자라는 것을 알 수 있었다. 또한 본 논문에서는 국내에서 처음으로 시공되는 제거식 쏘일네일 벽체의 설계 및 시공과 시공상태 등을 소개하였으며, 제거식 쏘일네일의 철근을 제거하기 전과 후에 벽체의 변형을 계측자료로부터 분석하였다.

  • PDF

Evaluation of Track irregularity due to Adjacent Excavation Work on Serviced Urban Transit (도시철도 인접굴착공사에 따른 운행선 궤도의 궤도틀림 분석)

  • Choi, Jung-Youl;Lee, Ho-hyun;Kang, You-Song;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.481-487
    • /
    • 2020
  • In this study, finite element analysis was performed to evaluate the track irregularity of the existing track system on urban transit according to the large-scale excavation work that is constructed adjacent to the serviced line. Based on the numerical analysis, the effect of track irregularity generated during the step-by-step construction process was analytically derived, and the stability in terms of track deformation was evaluated through comparison with related standards. As the results, in the case of track irregularity items evaluated based on the relative displacement difference at a certain distance, such as alignment and vertical irregularity, it occurred most clearly at the location where deformation of the existing structure begins, such as the end point of adjacent excavation work. On the other hand, the overall vertical and horizontal displacement of the track was the largest deformation at the center of the construction section. The vulnerable position of the deformed side of the existing structure due to adjacent excavation is analytically proven that the both of the end point section and the center of the construction can be a vulnerable position in terms of track irregularity.

Analysis of the Demage of Structures by Dynamic Compaction (동다짐에 의한 인접구조물 피해 분석)

  • Song, Jeong-Rak;Han, Wan-Gyun;Sin, Seung-Cheol
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.06a
    • /
    • pp.55-72
    • /
    • 1993
  • Dynamic compaction may cause some demages to structures becasue it uses the impact energy of heavy weight with high drop height. This study measured and analyzed the vibrations at the (bnamic compaction site which was composed of man-made land fill. From the vibration analysis, it was found that the particle velocity and attenuation was greatest in longitudinal direction and smallest in transversal direction, the dominant frequency ranged from 7 Hz to 9 Hz and the structural damage could be prevented by reducing the drop height at the vicinity of the vibration sentialive structures. Also, the damage to the office equipment could be prevented by doing the dynamic compaction work curing closed-office hours.

  • PDF