• Title/Summary/Keyword: 유지관리계측 관리기준

Search Result 81, Processing Time 0.022 seconds

Establishment of Maintenance and Monitoring Standards for Shield and TBM Tunnels (Shield 및 TBM 터널의 유지관리계측 관리기준 설정에 관한 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.1-12
    • /
    • 2024
  • Purpose: The objective of this study was to improve the tunnel maintenance and monitoring technology by establishing the maintenance, management, and monitoring standards for shield and TBM tunnels, which had been applied more in recent years. Method: This study comprehensively analyzed and compared the data and model simulations of Seoul Subway Lines 7 and 9 and Bundang Line, shield and TBM tunnels in South Korea, tunnels in France and Japan, and Channel Tunnel in the UK. Result: This study set maintenance and monitoring standards when there was no design estimate based on numerical analyses such as section design and section analysis regarding the maintenance and monitoring section of shield and TBM tunnels. Conclusion: It is necessary to determine safety by comprehensively considering not only each monitoring item but also the changing trend and correlation of all items and compensation of the tunnel.

Analysis on the Current Status of Maintenance and Monitoring of the Bridge Across Seokdaecheon, Busan Metro Line 4 (부산도시철도 4호선 석대천 횡단 교량의 유지관리계측 현황분석)

  • Woo, Jong-Tae
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.349-351
    • /
    • 2022
  • 1차 안전기준은 안전한 공사관리를 위한 목표치이며, 2차 주의기준은 주변구조물이나 주민에게 안전에 영향을 미칠 수 있는 범위 값이며, 3차 정밀분석기준은 공사장 자체의 위험에 대비하는 기준을 의미 하므로 향후에는 계측항목별로 계측관리기준을 세분하여 적용하는 것이 필요하다.

  • PDF

Improvement of Domestic Design Criteria of Tunnel Maintenance Monitoring and Latest Technology Trend (터널 유지관리 계측의 국내설계기준 개선 및 최신 기술동향)

  • Baek, Kyung Jong;Kwon, Young Eok
    • Journal of Korean Society of Disaster and Security
    • /
    • v.7 no.2
    • /
    • pp.9-16
    • /
    • 2014
  • Though the maintenance monitoring of structurally weak parts of the tunnel structure in public service must be judged in connection with the monitoring during the construction period for analysis of the behavior of the ground and surrounding structures following the tunnel excavation for the effective management, the monitoring during the construction period and the maintenance monitoring are implemented separately on the basis of the periods of construction and maintenance, so the connectivity and systematic management of the related data are mostly inadequate. The improvement direction is suggested in this thesis, by analyzing the problems of tunnel monitoring in the domestic design criteria. And, it is anticipated that from now on the use of hi-tech sensors and wireless communications technology will proceed vigorously in the maintenance, so considering these situations, the development and application of the maintenance monitoring system and the revision of the domestic design criteria and specification are needed in the future.

Reset of Measurement Control Criteria for Monitoring Data through the Analysis of Measured Data (계측데이터 분석을 통한 모니터링 데이터의 계측관리기준 재설정)

  • Chung, Chul-Hun;An, Ho-Hyun;Shin, Soo-Bong;Kim, Yu-Hee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.6
    • /
    • pp.105-113
    • /
    • 2014
  • Most operating civil structures measure response data continuously by various types of sensors and evaluate their health conditions. Measurement control criteria for such civil structures are usually defined in the first operating stage by experts working at a construction or engineering company. However, a few studies have been carried to examine the adequacy of these measurement control criteria based on the actual measured data. The paper introduces a systematic way of resetting the measurement control criteria for the measured monitoring data based on the statistical aspects of the measured data. The proposed statistical approach has been examined with actually measured time-history data from a bridge structure.

A study on the establishment of pressure limit values of management monitoring in tunnel (터널 유지관리계측의 압력 관리기준치 설정에 관한 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.53-60
    • /
    • 2016
  • This study analyzed a monitoring data, based on the initial limit values of monitoring in subway, of earth pressure and pore water pressure. The data is obtained from 8 sections of the Seoul metropolitan subway line No 6, 7 and 9 in about 5 years. Also, a research is performed to set up the limit values of management monitoring, which will be applied to management monitoring in tunnel, through comparing the limit values of overseas management monitoring data and that of domestic management monitoring data. And the result obtained from comparison show that the safety phase is 60% of allowable pressure, the attention phase is 80% of allowable pressure and the precision analysis phase is 100% of allowable pressure. Also, we presented a method of management monitoring by the absolute value which can be easily applied easily in practical affairs.

A study on the establishment of stress limit values of management monitoring in tunnel (터널 유지관리계측의 응력 관리기준치 설정에 관한 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.1
    • /
    • pp.25-32
    • /
    • 2015
  • This study analyzed a monitoring data, based on the initial limit values of monitoring in subway, of concrete lining stress and reinforcement stress. The data is obtained from 7 sections of the Seoul metropolitan subway line No 6, 7, and 9 in about 5 years. Also, a research is performed to set up the limit values of management monitoring, which will be applied to management monitoring in tunnel, through comparing the limit values of overseas management monitoring data and that of domestic management monitoring data. And the result obtained from comparison shows that the safety phase is 60% of allowable stress, the attention phase is 80% of allowable stress and the precision analysis phase is 100% of allowable stress. Also, we presented a method of management monitoring by the absolute value which can be easily applied in practical affairs.

Proposal of the Modified Management Criteria Value in Earth Retaining Structure using Measured Data (계측자료를 이용한 흙막이 구조물의 수정된 관리기준치 제안)

  • Kim, Jueng-Kyu;Park, Heung-Gyu;Nam, Jin-Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.1
    • /
    • pp.95-103
    • /
    • 2016
  • The absolute value management method is widely used in the most of the earth retaining construction, which evaluates the safety by comparing measurement result and management criteria. Therefore, the management criteria is the standard to evaluate the safety of the site, and in other words, the criteria is a direct factor of the evaluation. That means that the safety of the site can not be acquired if the management criteria is not proper, even though the measurement system is perfectly set. However, many of field technicians do not have rely on the current management criteria, and they even recognize the necessity of the revision. Therefore, in this study, the necessity of the revision was studied. Also, the optimum criteria selection and the application were performed based on the test results of earth retaining deflection and probabilistic theory. The absolute value management method was used for this study. The details are tabulated.

Analysis of Normal Operation Rate of Monitoring Sensor for Maintenance of Geumjeong Tunnel (금정터널 유지관리 계측센서의 정상 작동율 분석)

  • Woo, Jong-Tae
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.352-354
    • /
    • 2022
  • 2020년 기준 금정터널 유지관리 계측센서의 정상 작동 실효성 검증 조사결과 정상작동 유효율은 14-2공구 6개 단면의 계측센서 41개중 7.3%, 14-3공구 10개 단면의 계측센서 83개중 24.1%로 편차가 큰 것으로 나타났으며, 전체 16개 단면의 계측센서 124개중 18.5%로 나타났다.

  • PDF

A study on establishment of measurement and analysis frequency of maintenance monitoring in tunnel (터널 유지관리계측의 측정 및 분석주기 설정 연구)

  • Woo, Jong-Tae;Lee, Kang-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.2
    • /
    • pp.117-129
    • /
    • 2012
  • In this study, research was performed to establish the measurement and frequency of analysis for maintenance monitoring by investigation of tunnel maintenance monitoring system in the tunnel which was installed in the Seoul metro line 5, 7 and 8, using that the domestic and foreign application case, results of analyzed maintenance monitoring in the domestic tunnel and legal safety management standard of the facility. The results of the monitoring management about analysis frequency to the present are considered that the problem about measuring frequency does not occur. According to the analysis results of the maintenance monitoring which are located on the 5, 6th subway line, they are analyzed that the stress of concrete lining and reinforced bar are converged gradually after 45 months. Therefore Monitoring of measurement and analysis frequency is conduct more often within about 4 years after the measuring instrument installation. Four years later, slowing the frequency of measurement is considered reasonable.

A Study on the Improvement Plans of Maintenance Monitoring in Tunnel Structure (터널구조물 유지관리계측의 개선방안 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.10-20
    • /
    • 2020
  • Purpose: Analyze the results of on-site inspection of the tunnel structure maintenance management monitoring and suggest improvement plans. Method: We investigate and analyze the problems of various items on maintenance monitoring of tunnel structure of 14 subway lines of Seoul subway in downtown area. Result: The maintenance monitoring items, measurement quantity and installation location are classified into open tunnel and excavation tunnel and improvement plans are suggested respectively. Various durability criteria of the measuring instruments were examined, and durability confirmation method suggested improvement measures such as approval, inspection, inspection and testing, calibration of monitoring sensors. Conclusion: Applying the improvement measures of the tunnel structure maintenance monitoring to the construction site will increase the efficiency of the maintenance monitoring and contribute to the development of construction monitoring technology.