• Title/Summary/Keyword: 유압잭

Search Result 18, Processing Time 0.043 seconds

Dynamic Behavior of Pretensioned Prestressed Members for Releasing Methods (긴장력 도입 방법에 따른 프리텐션 부재 단부의 동적 거동에 관한 연구)

  • Lee, Seung-Jung;Zi, Goang-Seup;Moon, Do-Young;Kim, Kyu-Sun;Kim, Jang-Ho
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.139-140
    • /
    • 2009
  • In this paper, the dynamic behavior of pretensioned concrete structures was investigated experimentally during detensioning for two different releasing methods: flame-cutting and hydraulic-jacking. According to the experimental results of strain changes, although detensioning time of hydraulic-jacking is shorter than that of fame-cutting, the prestressing force loss of fame-cutting is larger than that of hydraulic-jacking.

  • PDF

Continuous Excavation Type TBM Parts Modification and Control Technology for Improving TBM Performance (TBM 굴진향상을 위한 연속굴착형 TBM 부품개조 및 제어기술 소개)

  • Young-Tae, Choi;Dong-Geon, Lee;Mun-Gyu, Kim;Joo-Young, Oh;Jung-Woo, Cho
    • Tunnel and Underground Space
    • /
    • v.32 no.6
    • /
    • pp.345-352
    • /
    • 2022
  • The existing NATM (New Austrian Tunneling Method) has induced civil compliants due to blasting vibration and noise. Machanized excavation methods such as TBM (Tunnel Boring Machine) are being adopted in the planning and construction of tunneling projects. Shield TBM method is composed of repetition processes of TBM excavation and segment installation, the machine has to be stopped during the later process. Consecutive excavation technology using helical segment is under developing to minimize the stoppage time. The modification of thrust jacks and module are planned to ensure the advance force acting on the inclined surface of helical segment. Also, the integrated system design of hydraulic circuit will be remodeled. This means that the system deactivate the jacks on the installing segment while the others automatically act the thrusting forces on the existing segments. This report briefly introduces the mechanical research part of the current consecutive excavation technological development project of TBM.

A Study on Composing the Structural Test Equipment of Large Scale Beam Type Test Specimen to Load Multiple Point and Capacity (대형 보형 실험체의 다점 다하중 가력을 위한 실험장치 구성에 관한 연구)

  • Park, Dong Su;Lee, Kyung Jin;Ham, Kyung Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.1
    • /
    • pp.189-197
    • /
    • 2011
  • In the field of structural test, it is a very important factor to apply with an appropriate test jig to enhance test accuracy and efficiency. Especially in the large scale structure test, proper test apparatus scheme will reduce overall cost and time of the test project. Actuators, oil jack and UTM is generally used to evaluate the flexural capacity of the test beam. But in the case of multiple loading point or asymmetric loading of large scale test specimen, existing test method such as UTM have a difficulty in giving an accurate load. In this study new test method which is composed of existing test apparatus will be developed to improve test accuracy and economic efficiency.

Monitoring-Evaluation System for Lifting Heavy Structures using 3D Location Data (3차원 위치좌표를 이용한 대형 구조물 양중을 위한 계측 - 평가 시스템)

  • Lee, Myung Ho;Chun, Sung Chul;Oh, Bohwan
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.4
    • /
    • pp.413-420
    • /
    • 2009
  • Heavy structures such as large roof structures and superbeams were lifted using hydraulic jacks. Moreover, member verticality and horizontality checks were performed at every construction stage to monitor the measuring tapes for their structural safety, using CCTV. When the relative displacement exceeded the predetermined limit, the hydraulic systems were terminated. After adjusting the relative displacement manually, lifting was resumed. The accuracy of the relative displacement was found not to be reliable, however, due to eye check using CCTV, and it took a long time due to manual adjustment. Moreover, real-time monitoring was impossible. To address these problems, the monitoring-evaluation system for the stable lifting of heavy structures was proposed, using the total station of the automatic-target-recognition type, laser-distance-measuring devices, a data logger, a strain gauge, and others. After developing a program for the operation of the system and for the acquisition of data, a mock-up test was conducted in a large-scale structural laboratory to evaluate the accuracy and applicability of the system. The stable acquisition and applicability of data was confirmed in the test.

A Study on the Performance Certification of 5,200ton Compression Load Tester (5,200톤 재하 시험장비의 성능 검증에 관한 연구)

  • Kim, Kwang-Young;Choi, Young-Ho;Ham, Young-Bog;Choi, Byung-Oh;Lee, Dong-Ha
    • Proceedings of the KSME Conference
    • /
    • 2001.11a
    • /
    • pp.149-154
    • /
    • 2001
  • In case of high capacity load force as millions of tons, it is difficult to measure the force with load cell. But we can measure and calculate the force with applied pressure and ram area of hydraulic jack. The 5,200 ton compression load tester is composed of thirteen hydraulic jack with 400 ton capacity. This paper explains the method of measuring the vertical compression load and provides characteristics of unit jack, and displacement of upper structure under maximum load condition.

  • PDF

Bearing Behavior Characteristics of Pressure Penetrating Steel Pipe Pile Under Compression Load (압축하중을 받는 압입강관말뚝의 지지거동 특성)

  • Kwon, Ohkyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.7
    • /
    • pp.5-13
    • /
    • 2015
  • The pressure penetrating steel pipe pile method which can be constructed in a narrow space using the hydraulic jack is used on the foundation reinforcement, extension of the structure and basement, restoration of the differential settlement etc.. This method is possible to construct in narrow areas and low story height, the non-noise and non-vibration works, and it is possible for the construction site to be clean without slime. And it is possible to confirm the bearing capacity of pile due to penetrating the pile with the compression load of hydraulic jack. In this study, the static load test with the load-transfer test was carried out to investigate the bearing behavior characteristics of the pressure penetrating steel pipe pile. Four series of static load test were executed to investigate the variation of bearing behavior of the pressure penetrating steel pipe pile. As a result of these tests, the allowable load of the pressure penetrating steel pipe was evaluated more than 637 kN, and the shaft resistance corresponding to 81~86% of each applied load was mobilized with only a small portion of the base resistance acting. And it was also evaluated that the unit skin friction was mobilized to maximum value after two months.

전력플랜트 건설의 최신기술동향

  • KOREA ELECTRIC ASSOCIATION KOREA ELECTRIC ASSOCIATION
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • s.310
    • /
    • pp.67-72
    • /
    • 2002
  • 미쓰비시(삼릉)전기 플랜트건설총괄부의 전력플랜트 건설공사는 수력$\cdot$화력플랜트 및 변전설비를 대상으로 하고 있으며, 수차$\cdot$수차발전기$\cdot$가스절연개폐장치(이하 ''GIS''라 한다), 변압기, 배전반 및 관련 제어기기 등의 설치 및 기기간의 배선공사 설계$\cdot$시공을 담당하고 있다. 최근의 전력플랜트를 둘러싼 일본의 시장환경은 신설 플랜트는 감소하고 갱신$\cdot$기기개수(개조, 수선) 공사의 비율이 커지고 있으며, 신설$\cdot$개보수 공사를 불문하고 공사품질의 유지와 공사비 저감을 위한 공법$\cdot$작업의 개선과 설계$\cdot$계획 업무의 합리화를 추진하여 왔다. (1) 기자재 개발에 의한 공법$\cdot$작업 개선 대형수력발전기의 로터조립용 다브테일키 박아놓기(타입)장치, 스테이터코일 분해(갱신)용 코일 엔드절단 및 코일뽑기공구, 터빈발전기 센터링용 유압잭, GIS 설치용 작업용발판을 개발하여 적용함으로써 공법 개선과 작업효율의 향상을 실현하였다. (2) 공사계획 방법의 개선 변전플랜트에서의 공기단축을 목적으로 하는 현지 설치 최적공정 책정방법의 개발$\cdot$적용, 또한 화력플랜트에서의 공사물량의 저감과 설계작업의 효율 향상을 목적으로 하는 케이블 배선 설계$\cdot$계획 방법의 개발 및 적용으로 설계업무의 개선, 공사비 저감을 도모하였다.

  • PDF

Measurement of Lateral Prestress Force of UHPC Cross Beam using the Smart Tendon (스마트강연선을 이용한 UHPC 가로보의 횡방향 긴장력 계측)

  • Kim, Hyun-Woo;Kim, Jae-Min;Kim, Young-Jin;Kim, Young-Sang
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.178-181
    • /
    • 2011
  • 본 연구에서는 광섬유센서를 내장한 스마트강연선을 이용하여 초고성능콘트리트로 제작된 하이브리드 사장교 세그먼트의 횡방향 도입 긴장력을 계측하고 세그먼트 내부의 프리스트레스를 계측하여 즉시손실에 해당하는 정착장치 활동에 의한 손실과 마찰손실을 도로교설계기준(2005)의 설계 마찰손실과 비교하였다. 제작된 2개의 UHPC 사장교 세그먼트는 횡방향 길이 16.7m, 종방향 길이 1.75m, 높이 1.5m이며 각 시험체의 1/4, 1/2, 3/4지점에 긴장력을 계측하기 위해 3개의 FBG센서를 배치하였다. 긴장력은 유압잭을 이용하여 5개의 강연선에 동시에 순차적으로 도입되었으며, 단부에서 최대 도입 긴장력은 세그먼트 1은 734kN, 세그먼트 2는 639kN이었다. 도로교설계기준에 제시된 마찰계수의 중간값(파상마찰계수=0.00405, 곡률마찰계수=0.20)을 사용하여 FBG센서 위치에서 계산된 긴장력은 계측치와 5% 이내의 차이를 보였으며, 정착장치 활동에 의한 순간손실은 긴장단에서 최대 12.8%로 계측되었다. 이로부터 이 연구에서 제시하는 긴장력계측방법의 적용성을 입증할 수 있었으며, 향후 이 방법은 프리스트레스트 콘크리트 교량의 설계기준 마찰계수 개정을 위한 연구에 좋은 도구로 활용될 수 있을 것으로 기대된다.

  • PDF

A Study on the Application of Roof Panel Shield Method (RPS 공법의 적용성 연구)

  • Kim, Jung-Hyi;Jung, Byung-Chul;Shin, Eun-Chul;Kim, Jong-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1585-1592
    • /
    • 2008
  • 산업사회의 발전에 따라 사회 기반시설분야도 복잡다양해지고 특히 도시기능이 활발해지면서 지금의 도심지에는 지하철, 상수도, 하수도, 전력구, 통신구, 지하보차도, 지하상가, 지하주차장 등 여러 가지 용도의 지하공간이 요구되고 있으며, 이러한 지하 구조물을 축조하는데 있어 도로상에 차량 증가로 인한 교통 혼잡이나, 지하매설물의 장애로 인하여 기존의 개착식 공법으로 시행하지 못하고 지하터널공사로 시행하는 경우가 빈번하다. 기존 국내 외 터널공법 관련문헌과 현재 사용되는 터널공법의 실제 시공에 관한 정보를 수집하여 장 단점, 시공시 주의사항, 적용조건등의 조사내용을 바탕으로 RPS 공법을 고안하였다. 소규모 지하구조물을 구축하기 위한 RPS 공법은 출발갱내에서 상부에 파이프 루프를 시공한 후 광폭 유압 패널이 장착된 철제 선도관을 추진시켜 선도관을 원압잭에 의하여 압입한 후 P.C. 콘크리트 구조물을 거치하고 원압으로 압입 추진토록 하였다. 또한, 대규모 지하구조물 축조시에는 구조물 예정상단부에 지반조건에 따라 파이프 루프공법 또는 소구경 Semi-Shield 공법을 이용하여 루프를 시공함으로써 상부의 침하를 방지하고, 측벽은 광폭유압 패널을 이용하여 여굴의 최소화 및 곡선부 시공을 용이하게 하였다.

  • PDF

Development and Performance Experiment of Iso-tensioning System using Electrical Resistance Loadcell (전기저항식 로드셀을 이용한 균등긴장시스템 개발 및 성능실험)

  • Park, Won-Tae;Chun, Kyoung-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.2
    • /
    • pp.220-226
    • /
    • 2016
  • Because MS(Multi-Strand) cables consist of many strands, a jacking force is applied to each strand one by one for cable construction. All strands should have an equal tensile force when the last one is wedged. This is the core technology for MS iso-tensioning. In this study, a new MS cable iso-tensioning system was developed for controlling and jacking the high-strength strands, with an ultimate tensile strength of 2,200MPa, for a stay cable of extra-dosed/cable-stayed bridges. The newly developed iso-tensioning system consists of electrical resistance load cells, hydraulic jacking devices, hydraulic pumps, and integrated controllers. Moreover, it is embedded with an algorithm that can control and predict the variations in tensile forces of the Master and Slave strands in real time. Actual experiments were carried out to verify the function and performance of the newly developed system. This system was applied successfully to the stay cable construction of 2nd Tae-in extra-dosed bridge in Gwangyang.