1 |
Ko Y.K., Kim C.H., Choi S.C., Jung S.J., Seong T.R., Kim J.K., "Design and Construction of 2nd Taein Bridge(Extra-Dosed) using 2,200MPa MS(Multi-Strand) Stay Cable and 2,400MPa PT(Post-Tensioning) System", Computational Structural Engineering Institute of Korea, Technical Articles, Vol.27, No.3 pp.49-54, 2014.
|
2 |
Yang C.Y., "Principles of Loadcell", Monthly Magazine of Auto Control & Inspection, Special Articles, April, 2002.
|
3 |
Jun J.T., Kim C.H., Kim H.B, Ahn D.G., "A Study on the Development of Iso-Tensioning System for Cable-Stayed Bridges using FBG Sensors", Korean Society of Civil Engineers(KSCE), Proceeding of the Annual Conference of the KSCE, 2010.
|
4 |
Kim H.K., Kim C.H., "Experimental Analysis on Equivalent Tensile Force of Multiple Strand Cable", Korea Institute for Structural Maintenance and Inspection(KISMI), Proceeding of the Spring Conference of the KISMI, 2013.
|
5 |
Ko Y.K, Kim C.H., Chun K.S., Chung K.S., "Application of High Strength Cable and MS Cable Tension System to 2nd Taein Bridge (Extra-Dosed)", Korean Institute of Bridge and Structural Engineers (KIBSE), Proceeding of the Annual Conference of the KIBSE, 2014.
|