• Title/Summary/Keyword: 유리측벽

Search Result 9, Processing Time 0.03 seconds

The deformation behavior of soil tunnels reinforced with RPUM and fiberglass pipes (RPUM과 유리섬유 파이프로 막장을 보강한 토사터널의 변형거동)

  • Nam, Gi-Chun;Heo, Young;Kim, Chi-Whan;You, Kwang-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.3
    • /
    • pp.185-193
    • /
    • 2002
  • In this paper, deformation behavior of shallow subway tunnel excavated in weathered soil and reinforcement effects of longitudinal support measures are investigated via three dimensional FDM analysis. Two excavation methods, half-face excavation and full-face excavation, are considered in simulation to study the influences of excavation methods on tunnel deformation behavior. In addition, the reinforcing effects of RPUM and fiberglass pipe are compared. Face extrusion, covergence, preconvergence, and sidewall displacement are investigated to analyze tunnel deformation behavior, and surface settlement is used to analyze the effects of excavation methods and longitudinal supports measures. The simulation results show that half-face excavation induces larger convergence, preconvergence, sidewall displacement, surface settlement than full-face excavation, while full-face excavation induces larger extrusion than half-face excavation. In addition, under same excavation method, all displacements are larger when RPUM is only used for longitudinal support than when RPUM is jointly used with fiberglass pipes.

  • PDF

Transfer Mold 법에 의한 전계 에미터 어레이 제작 및 특성

  • 조경제;이상윤;강승열
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 1998.02a
    • /
    • pp.90-90
    • /
    • 1998
  • 전계 에미터 어레이(FEA)는 진공에서 전계률 인가하여 전극으로부터 전자률 방출시키는 전자원으로서, 마이크로파 소자 및 명판 디스플레이, 센서 둥에 이용된다 .. Transfer Mold 법 은 뾰족한 에미터 립과 게이트 절연막 및 게이트 전극 충올 형성한 후 유리와 같은 기판에 이전 시키는 방법으로, 이러한 방법은 Mold 형태 위에 코탱 충의 두께 조절과, 게이트와 립 높이 조절이 가능하며, 그리고 유리 기판 위에 접착하여 대면적의 평판 디스플레이를 제작 할 수 었다는 장점이 있다[1,2]. 본 연구에서는 일반적으로 사용되는 실리콘 기판올 습식 식 각하여 Mold률 제작하는 방법 대선에, 측벽 스페이스 구조률 이용한 새로운 방법의 Mold 형태률 이용하여 게이트률 가진 에마터 립올 제작하였다. 먼저 실리콘 기판 위에 산화막올 증착하고 그 위에 게이트 전극파 게이트 절연막을 LPCVD 방법으로 증착하여 구명 형태로 패터닝 한 후, BPSG(Boro Phospher Silicate Glass) 박막올 증착하여 고온에서 훌러 내려 뾰족한 형태의 주형(Mold)률 제작한 후 TiN율 증착하여 정전 접합(an여ic bon벼ng)이나 레 진(resine)둥으로 유리률 접합한 후 KOH 용액으로 실리콘 기판옵 뒷면부터 식각해 낸다. 그 다옴, 립과 게이트 위에 있는 절연막올 제거한 후 뾰족한 전계 에미터 어레이륭 제조하 였다. 자세한 제조 공정 및 제작된 에미터 립의 특성은 학회에서 발표될 예정이다.

  • PDF

Analysis on Thermal Environment in the Rotunda of New National Museum of Korea (새 국립중앙박물관 로튠다에서의 열환경 분석)

  • 이승철;조영진;김두성;이재헌;김홍범
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.15 no.1
    • /
    • pp.32-39
    • /
    • 2003
  • Thermal comfort in the Rotunda which is high wide visiting space of the new national museum of Korea has been numerically investigated in this paper. To evaluate thor-mal comfort of the Rotunda, well-known indices, PMV and PPD were introduced. The results of present investigation show that thermal comfort is satisfied at the breathing zone of the visiting space. However a thermal stratification with $9^{\circ}C$ of temperature difference occurs along the height of the Rotunda which makes the thermal environment worse. For example, the PPD value reaches up to 50% in the 6th floor connection passage. Consequently, additional HVAC design factors should be considered in order to reduce the large thermal stratification.

Stability Analysis of Multi-Functional Fishway with Underground Passage (지하이동통로가 구비된 다기능 어도의 안정성 검토)

  • Lee, Young-Jae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.6
    • /
    • pp.50-59
    • /
    • 2014
  • In this paper, Reinforced concrete (R/C) and R/C+steel plate concrete slab was carried out by SAP2000 software program in order to compare the stability of the multi-functional fishway, that is Bonggok fishway, built at Bonggok river recently in Gumi city, when the size of underground passage is $1m{\times}0.2m$, $1m{\times}0.4m$, $1m{\times}0.6m$ and the velocity is 0.8m/s, 1.2m/s, 1.6m/s respectively for the S2 (R/C+S/C). The analysis shows the maximum stress of S2 decreases less 26~50% than that of Bonggok, bending moment of sidewall decreases less 28~54%, maximum stress of side wall decreases less 17~31%, bending moment of upper slab decreases less 24~47%, maximum stress of upper slab decreases less 4~20%, and bending moment decreases less 10~27% than that of Bonggok. The complementation is required as much as the following percent; 27% and 25% for the maximum stress and bending moment of underground passage, 15% and 24% for the side wall maximum stress and bending moment, and 10% and 14% for the upper slab maximum stress and bending moment, respectively. This result shows that the S2 is greatly superior to that of the Bonggok fishway, and underground passage size of $1m{\times}0.4m$ is superior to that of $1m{\times}0.2m$ or $1m{\times}0.6m$, and R/C+S/C slab is superior to that of R/C slab. This result is expected to be the basic data for the construction and design of the multi-functional fishway.

A Study on the Thermal Crack Control of the In-Ground LNG Storage Tank as Super Massive Structures (지하식 LNG 저장탱크 구조물의 온도균열 제어에 관한 연구)

  • Kwon, Yeong-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.6
    • /
    • pp.773-780
    • /
    • 2011
  • In this study, thermal stress analysis are carried out considering material properties, curing condition, ambient temperature, and casting date of the mass concrete placed in bottom slab and side wall of the in-ground type LNG tank as a super massive structure. Also, based on the numerical results, cracking possibility is predicted and counter measures to prevent the cracking are proposed. For the tasks, two optimum mix proportions were selected. From the results of the thermal stress analysis, the through crack index of 1.2 was satisfied for separately caste concrete lots except for the bottom slab caste in 2 separate sequences. For the double caste bottom slab, it is necessary introduce counter measures such as pre-cooling prior to the site construction. Also, another crack preventive measure is to lower the initial casting temperature by $25^{\circ}C$ or less to satisfy 1.2 through crack index criterion. In the $1^{st}$ and $2^{nd}$ caste bottom slab, the surface crack index was over 1.2. Therefore, the surface cracks can be controlled by implementing the curing conditions proposed in this study. Since the side wall's surface crack index was over 1.0, it is safe to assume that the counter preventive measures can control width and number of cracks.

Structural Analysis of Multi-Functional Fishway in Seomoon Weir (서문보의 다기능 어도의 구조해석)

  • Lee, Young Jae;Lee, Jung Shin;Jang, Hyung Kyu
    • Ecology and Resilient Infrastructure
    • /
    • v.7 no.4
    • /
    • pp.308-319
    • /
    • 2020
  • In this study, the field applicability of the recently constructed multifunctional fishway in Seomunbo, Yeongcheon-si, and Gyeongsangbuk-do were examined. The analysis variables were R/C slab (S1) and R/C+S/C slab (S2), the underground passage standard areas (width × length) were 1.4 m × 0.2 m, 1.4 m × 0.3 m, and 1.4 m × 0.6 m, and the flow velocities were 0.8, 1.2, and 1.6 m/s. As a result of the analysis, the safety of the design of Seomunbo was evaluated. The analysis showed compared to the Seomoon Weir fishway, the maximum stress of S2 decreased by 24 - 32%, the bending moment of the underground passage decreased by 16 - 33%, the maximum stress of the sidewall decreased by 20 - 36%. In addition, the bending moment of the upper slab decreased by 17 - 33%, the maximum stress of the upper slab decreased by 9 - 28%, and the bending moment decreased by 19 - 33%. Complementation was required in the following percentages: 18% and 14% for the maximum stress and bending moment of the underground passage, respectively, 15% and 17% for the maximum sidewall stress and bending moment, respectively, and 11% and 16% for the upper slab maximum stress and bending moment, respectively. The results showed that S2 was superior to that of the Seomoon Weir fishway, and the underground passage size of 1.4 m × 0.3 m was superior to those of 1.4 m × 0.2 m and 1.4 m × 0.6 m, and R/C+S/C slab was superior to that of R/C slab. The findings are expected to be useful for constructing and designing the multifunctional fishway.

Cross-sectional Changes of Ridge Traversing Trail in Jirisan National Park (지리산국립공원 종주등산로의 횡단면 변화 - 노고단~삼도봉 구간을 중심으로 -)

  • Kim, Taeho;Lee, Seungwook
    • Journal of the Korean association of regional geographers
    • /
    • v.19 no.2
    • /
    • pp.234-245
    • /
    • 2013
  • In order to examine the amount and rate of soil erosion on Ridge Traversing Trail in Jirisan National Park, a cross-sectional area of hiking trail were monitored at 16 sites in Nogodan - Samdobong section from November 2011 to April 2012. Although all sites demonstrates an enlarged cross-section of trail, the amount of soil erosion varies from site to site: 54.9 to $908.8cm^2$. It suggests that the erosional rate ranges from $0.1cm^2/day$ to $1.72cm^2/day$. The erosional amount is also varied with a trail type: $109.3cm^2$ for a shallow gully-like trail to $573.2cm^2$ for a unilateral trail. However, the cross-sectional change is larger on a sidewall than a tread irrespective of a trail type. The erosional amounts of November to April are smaller than that of May to October. In particular, the erosional amount of November 2011 to April 2012 is smaller than the depositional amount, implying a reduced cross-section of trail. Pipkrake action puts loose soil particles on a sidewall on March and April, and then rainwash due to a heavy rainfall takes them away after May. It seems to be the most predominant erosional process in Ridge Traversing Trail. A sidewall facing north shows a larger amount of erosion than a sidewall facing south. It also implies a difference in the development of a pipkrake according to an aspect. The small amount of erosion and cross-sectional decrease, which is usually observed on April, results from the combined effect of frost heaving, pipkrake action, a small rainfall and a temporary suspension of trampling. It is necessary to establish the monitoring system of trail erosion in terms of the management of hiking trail in a mountain national park.

  • PDF

Sound Insulation Performance of Honeycomb Composite Panel for a Tilting Train (틸팅 열차용 허니콤 복합 적층재의 차음성능)

  • Kim, Seock-Hyun;Seo, Tae-Gun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.34 no.12
    • /
    • pp.1931-1936
    • /
    • 2010
  • In Korean tilting trains, honeycomb composite panels are used for high speed and light weight. The side wall of a tilting train consists of an aluminum honeycomb coated with carbon-fiber-reinforced epoxy skin and a nomex honeycomb panel as the main structure, with glass wool inserted between the panels. In this study, based on ASTM E2249-02, we measure the intensity sound transmission loss (TL) of the honeycomb composite panels. Using mass law deviation (MLD), we estimate the sound insulation performance of the honeycomb composite panels in terms of their weight and explore the feasibility of substituting a conventional corrugated steel panel. The transmission-loss data of the honeycomb composite panels obtained in the study will be used to establish noise-reduction measures for train compartments.

The influence of magnet on tissue healing after immediate implantation in fresh extraction sites in dogs (성견에서 발치 후 즉시 식립 임플란트에 설치한 자석이 주위 조직에 미치는 영향)

  • Yu, Seok-Min;Cho, In-Ho;Shin, Soo-Yeon
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.47 no.4
    • /
    • pp.435-444
    • /
    • 2009
  • Statement of problem: The clinical use of electric and electomagnetic fields for fracture healing applications began in the early 1970s. Since then, several technologies have been developed and shown to promote healing of fractures. Developments of these devices have been aided in recent years by basic research and several well controlled clinical trials not only in the medical field but in dentistry. Purpose: The purpose of this study was to compare alveolar bone reduction following immediate implantation using implants onto which magnets were attached in fresh extracted sockets. Material and methods: Four mongrel dogs were involved. Full buccal and lingual mucoperiosteal flaps were elevated and third and fourth premolars of the mandible were removed. Implants with magnets and implants without magnets were installed in the fresh extracted sockets and after 3 months of healing the animals were sacrificed. The mandibles were dissected and each implant sites were sampled and processed for histological examination. Results: The marginal gaps that were present between the implant and walls of the sockets at the implantation stage disappeared in both groups as a result of bone fill and resorption of the bone crest. The buccal bone crests were located apical of its lingual counterparts. At the 12 week interval the mean of marginal bone resorption in the control group was significantly higher than that of the magnet group. The majority of specimens in magnet group presented early bone formation and less resorption of the buccal marginal bone compared to the control group. Conclusion: Within the limitations of this study, it could be concluded that implants with magnets attached in the early stages of implantation may provide more favorable conditions for early bone formation and reduce resorption and remodeling of marginal bone.