• Title/Summary/Keyword: 예산 추정

Search Result 158, Processing Time 0.022 seconds

An Analysis on Economic Effects of Smart Sewage Pipe (스마트 하수도 구축의 경제적 파급효과 분석)

  • Kim, Sung Tai;Lim, Byung In;Oh, Hyun-Taek;Park, Kyoo-Hong
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.7
    • /
    • pp.78-84
    • /
    • 2019
  • The purpose of this study is to introduce the concept of the Smart Sewer System and to analyze the economic ripple effect when smart sewer is built all over Korea. The research method is the input-output model based on the assumption that the smart sewerage will be constructed throughout the Korea from 2021 to 2040. Estimation results show that the production-induced effect reaches 343.73 trillion Korean won, the added value-induced effect is 155.867 trillion Korean won, and the employment-induced effect is estimated by 25,118,470, indicating that the smart sewer project leads to being considerably large in the nation-wide economy. In addition, the increase of social welfare by smart sewer is expected to be realized through the improvement of both the environment improvement and the national health. Therefore, the smart sewer project should be implemented without delay by planning a concrete road map and putting it into effect with a budget.

Establishing the Strategy of Effective Construction VE for Construction Firms (건설기업 관점의 효과적인 시공 VE 수행을 위한 전략 도출 연구)

  • Park, Chan Young;Yun, Sungmin;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.80-87
    • /
    • 2021
  • Shortage of SOC budget and inappropriate initial construction cost planning have worsened the economic sentiment of the construction firm. Construction VE can be one of the solutions for improving the profitability of construction projects. This study identifies the strong and weak points of construction firms for establishing the strategy of effective construction VE by using importance-performance analysis. As a result, construction firms have strong points on support, cooperation, and knowledge about construction VE, but have weak points on 'VE experience of VE leader', 'Detailed cost estimation', and 'Idea generation and evaluation'. This paper contributes to establishing the strategy of effective construction VE from the perspective of the construction firm, which is differentiated from previous studies that have focused on the institutional approach for construction VE.

A Study on the Path Loss of Underwater Acoustic Channel Based on At-sea Experiment at the South Sea of Korea (남해 실해역 시험 기반 수중음향채널 경로손실에 관한 연구)

  • Kim, Min-Sang;Lee, Tae-Seok;Cho, Yong-Ho;Im, Tae-Ho;Ko, Hak-Lim
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.24 no.3
    • /
    • pp.405-411
    • /
    • 2020
  • Recently, studies on underwater communication, related to the development of underwater resources, disaster monitoring and defense, have been actively carried out. In the design of wireless communication systems, path loss is the most important information to derive a link budget that is required to guarantee communication reliability by calculating received power level for the given communication link. The underwater acoustic channel have different characteristics according to geographical location and relevant environmental factors such as water temperature, depth, wave height, algae, and turbidity. Subsequently, many research institutes aiming to develop underwater acoustic communication systems are researching actively on the underwater acoustic channels in various sea areas. In Korea, however, studies on the path loss of the acoustic channel are still insufficient. Therefore, in this study, the path loss of the acoustic channel are studied based on measurement data of the at-sea experiment conducted at Geohae-do, southern sea of Korea.

Evaluation of the design return period and risk assessment for local rivers in Chungcheongnam-do considering climate change (기후변화를 고려한 지방하천 설계빈도 및 위험도 평가 : 충청남도를 중심으로)

  • Ryu, Jae Hee;Lee, Jin-Young;Kim, Ji Eun;Kim, Tae-Woong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.35-35
    • /
    • 2021
  • 최근 우리나라는 기후변화로 인한 이상기후 현상으로 호우 및 홍수 등에 의한 수재해를 예방하기 위한 설계빈도 적용방안 개발이 필요하다. 과거 지방하천의 일률적인 설계빈도의 적용 및 간접·주관적인 하천의 중요도와 지역특성에 대한 등급의 결정은 하천사업의 효율적 관리와 수행에 있어서 저해요소로 작용되어 왔다. 또한, 미래 기후변화 시나리오에 따라 하천의 중요도 및 계획 규모가 적절히 적용되어야 한다. 본 연구는 충청남도의 492개 지방하천에 대하여 유역특성(유역면적, 형상계수), 하천특성(하도경사, 수계 및 하천차수, 배수영향 구간), 이상강우 특성(이상강우 발생빈도, 시가화 침수면적)에 대한 현재 설계빈도에 대한 적절성을 평가하였다. 설계빈도에 대한 정량적 추정은 베이즈 이론을 활용하여 가중치를 산정한 후 최적분포형을 선정하였다. 최적분포형의 중앙값을 일반적인 지방하천의 설계빈도인 80년 빈도로 설정하고 상·하위 0.5%가 각각 100년, 50년 빈도로 가정하여 492개 지방하천을 평가하였다. 이상강우의 발생빈도와 시가화 침수면적에 따라 하천의 설계빈도가 높게 산정되는 것으로 분석되었다. 미래 기후변화 시나리오를 적용할 경우 현재 설계빈도(설계수명)에 대한 시나리오별 미래 재현기간을 산정하여 미래 설계빈도에 대한 위험도를 평가하였다. 13개 기후변화 시나리오의 대표농도경로 4.5와 8.5를 분석한 결과, 평균 3.2%, 12.8%의 위험도가 증가하는 것으로 분석되었다. 본 연구결과는 객관적인 지방하천의 적정 설계빈도 결정방안을 제시하였으며, 미래 계획홍수량 증가로 인하여 효율적인 토지이용이 제한될 것으로 예상됨에 따라 하천사업의 예산절감 및 우선순위 결정 등에 활용 가능할 것으로 판단된다.

  • PDF

A Comparison Study of Cost Components to Estimate the Economic Loss from Foodborne Disease in Foreign Countries (국외 식중독으로 인한 손실비용 추정을 위한 항목 비교 연구)

  • Hyun, Jeong-Eun;Jin, Hyun Joung;Kim, Yesol;Ju, Hyo Jung;Kang, Woo In;Lee, Sun-Young
    • Journal of Food Hygiene and Safety
    • /
    • v.36 no.1
    • /
    • pp.68-76
    • /
    • 2021
  • Foodborne outbreaks frequently occur worldwide and result in huge economic losses. It is the therefore important to estimate the costs associated with foodborne diseases to minimize the economic damage. At the same time, it is difficult to accurately estimate the economic loss from foodborne disease due to a wide variety of cost components. In Korea, there are a limited number of analytical studies attempting to estimate such costs. In this study we investigated the components of economic cost used in foreign countries to better estimate the cost of foodborne disease in Korea. Seven recent studies investigated the cost components used to estimate the cost of foodborne disease in humans. This study categorized the economic loss into four types of cost: direct costs, indirect costs, food business costs, and government administration costs. The healthcare costs most often included were medical (outpatient) and hospital costs (inpatient). However, these cost components should be selected according to the systems and budgets of medical services by country. For non-healthcare costs, several other studies considered transportation costs to the hospital as an exception to the cost of inpatient care. So, further discussion is needed on whether to consider inpatient care costs. Among the indirect costs, premature mortality, lost productivity, lost leisure time, and lost quality of life/pain, grief and suffering costs were considered, but the opportunity costs for hospital visits were not considered in any of the above studies. As with healthcare costs, government administration costs should also be considered appropriate cost components due to the difference in government budget systems, for example. Our findings will provide fundamental information for economic analysis associated with foodborne diseases to improve food safety policy in Korea.

Epidemiological Investigation for Outbreak of Clostridium perfringens Enteritis among Students at a College in 2018 (2018년 중부지방 일개 대학에서 집단 발생한 클로스트리듐 퍼프린젠스 감염증)

  • Bae, Eun-Joo;Hwang, Se-Min;Kwon, Guen-Yong;Lee, Moo-Sik
    • Journal of agricultural medicine and community health
    • /
    • v.45 no.2
    • /
    • pp.69-78
    • /
    • 2020
  • Purpose: This study was conducted to provide the results of the epidemiological investigation for outbreak of Clostridium perfringens enteritis among students at a college in Sejong City. Methods: This investigation was performed between May 25 and May 28, 2018. The Sejong City public health authority received a complaint which was about 40 university students experienced vomiting or diarrhea. We immediately set up an epidemiological investigation team and conducted a field epidemiological investigation. Results: The overall incidence was 86 out of 153 (56.2%). The estimated risk exposure time was 12 o'clock on the previous day, and the cause was contaminated during distribution and storage of the lunch box provided for lunch on the day of the athletic competition, with 13 hours of average incubation period. The outbreak was closed on May 28, and the identified pathogen was Clostridium perfringens. Conclusions: It was proposed that food poisoning by Clostridium perfringens was likely and contaminated during group meal.

A study on the method for the Integrated Cost Estimate based on Project(ICEP) of program management with typical model (기준모델을 사용한 종합사업관리용역비 산정방법(ICEP) 연구)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.119-128
    • /
    • 2015
  • Domestic dominant method in subcontract cost estimate for comprehensive program management is estimation by referencing similar cases or relying on the experience and expertise of the engaged. However, this method is not reliable due to lack of accuracy, making it harder for clients to plan and budget the program. Since budget itself is roughly estimated, it becomes a source of cost rise in the course of management due to design modifications. Therefore, the client and service providers shall calculate more accurate service cost by applying objective and scientific method in order to minimize cost rise and cost related dispute. Traditional cases, in estimating program management cost, took Top-Down approach based on precedents and experience. On the contrary, this study will categorize management structure into phases and activities, issue WBS for each phase to estimated schedule and cost for each code, and take Bottom-UP approach. By taking this approach named ICEP (Integrated Cost Estimate based on Project), Set project typical model will be developed for service cost estimating, calculate cost by applying project-specific factors. Also, by analyzing progress data and allocated management cost to complement them, more efficient construction management will take shape based on program management cost standards which reflect project-specific features.

A Case Study on the Change of Sampling inspection method for the Small Depth Charge Fuze (소형폭뢰용 수압식 신관의 품질검사방법 전환사례 연구)

  • Jee, Jae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.531-538
    • /
    • 2017
  • In the case of hydraulic pressure type fuse, we accept or reject certain product lots by considering the number of defective products in the operating pressure test. Generally, this procedure, known as 'The inspection by attributes', has been most commonly used in the field of quality assurance of products. However, the method of inspection by attributes suffers because it tests more samples than inspection by variables. Even though the quality of the products has remained stable in the process condition, the same number of samples is required for every lot, which wastes time and money. This paper suggests that the lot acceptance procedure is changed from inspection by attributes to inspection by variables. We can calculate the statistical tolerance percent of defectives and compare this to the Acceptable Quality Level (AQL) in order to save money and time. It is also easier to monitor and control the quality of products by using the process capability index and x-bar charts. In conclusion, the procedure delivers mutual benefit to both the customer and the producer by securing high quality products and reference data.

Cost-Benefit Analysis of The National Land Census Project and Its Policy Implications (국토센서스 사업의 비용 및 편익분석과 시사점)

  • Lee, Young-Sung;Kim, Kab-Sung;Lee, Choon-Won;Kwon, Dae-Jung;Yu, Hyeon-Ji;Yun, Hyung-Seok;Kim, Jin
    • Journal of Cadastre & Land InformatiX
    • /
    • v.49 no.2
    • /
    • pp.23-38
    • /
    • 2019
  • The National Land Census Project aims to survey the national land regularly to resolve the land category disagreement and reflect the actual land use. The objective of this study is to investigate whether not only the National Land Census Project but also related land and housing surveys bring about the improvement of social welfare in light of the invested budget, and to measure the project feasibility. The potential benefit after the National Land Census Project is not traded in the market. To determine the economic value of this potential benefit, the Contingent Valuation Method was used. This study utilized the single-bounded and double-bounded dichotomous choice models simultaneously to estimate the project feasibility of the cadastral system improvement. According to this study, cost-benefit ratio of the project was estimated larger than 1, which means that social benefits are larger than social costs.

Estimation of Hourly Variations in Public Transit Demand according to the Addition of Sales Facilities to Railway Stations: Focusing on Metro and Bus Transit Demand (철도역사 판매시설 증축에 따른 시간대별 대중교통 수요 변화 추정: 지하철 및 버스 수요를 중심으로)

  • Jang, Jaemin;Moon, Dae Seop;Kim, Sujeong;Gim, Tae-Hyoung Tommy
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.6
    • /
    • pp.630-638
    • /
    • 2015
  • The total number of passengers on the KTX since its construction in 2004 surpassed 500 million in October, 2015. The operation of KTX made it possible to reach anywhere in a country in half a day, which subsequently altered people's lifestyle. As the KTX has become an important mode of transportation, there is a growing interest in the optimal size and location of its stations. Currently, the stations are constructed through public-private partnerships since a sufficient amount of budget is hard to secure only from the public sector; however, because railway stations are traditionally aimed at promoting public interests, an emphasis on the profitability of the private sector could compromise public interests. At this juncture, this study separately computes the number of users based on each of the two primary functions of the stations-as a railway station and as a sales facility-and estimates the numbers of people according to various transportation modes that are taken to access the stations. This estimation is applied to the case of Dongdaegu Station, which will open in 2016. Such an application helps to predict and respond to possible congestion as brought about by the expansion of the sales facility.