• Title/Summary/Keyword: 열차 사고

Search Result 131, Processing Time 0.023 seconds

Study on the Aptitude Test for Efficient Railroad Management (효율적인 철도교통을 위한 적성검사제도 연구)

  • Kang Soon-gy;Hong Jung-sik;Lee Jin-Sun
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.1
    • /
    • pp.87-92
    • /
    • 2005
  • Numerous advance studies usually have focused on preventing human error through mechanization and automation; however, this study. by connecting with accidents caused by careless handling on the basis of the present aptitude test, aims at investigating an improving plan for the railroad safety management system. To attain this purpose, present situation and point at issue of the aptitude test were surveyed through the questionnaire. Through this research, the aptitude test on railroad safety might be systematically improved by reforming some institutional issues.

Analysis of train collisions using 2D multibody dynamics models (열차사고의 2차원 충돌동역학 모델링 기법 연구)

  • Kim, Geo-Young;Cho, Hyun-Jik;Park, Min-Young;Koo, Jeong-Seo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.358-363
    • /
    • 2008
  • Through this study, 2D multibody dynamics models for analysis of train collisions have been developed to evaluate the crashworthiness requirements of the TSI regulation. The crashworthiness regulation requires some performance requirements for two heavy collision accident scenarios; a train-to-train collision at the relative speed of 36 kph, and a collision against a standard deformable obstacle of 15 ton at 110 kph. The complete train set will be composed of hybrid model with 2D and 1D model. Using numerical analysis of the hybrid model, some crashworthy design were evaluated in terms of mean crush forces and energy absorptions for main crushable structures and devices. especially, 2D model can evaluate overriding effect in train collisions. It is shown from the simulation results that the suggested hybrid model can easily evaluate the crashworthiness requirements.

  • PDF

Development of Emergency Restoration Scenarios for Railway Accident using Analytic Network Process (네트워크분석적 의사결정기법을 이용한 철도사고 임시복구시나리오 개발)

  • Sung, Deok-Yong;Park, Yong-Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.727-737
    • /
    • 2011
  • The emergency restoration scenarios for efficient railway accident management and restoration were developed. The emergency restoration procedures defined by the worst case of emergency restoration and the important events was proposed based on questionnaires from specialists and the result of survey. Via these studies, the railway accident in the tunnel could be the worst case among all railway accident types. Therefore, educations for a restoration team in confined area condition should be planned and performed to recover the worst case accident. In order for the emergency restoration, when a railway accident is occurred, the restoration should be performed in orders of handing collapse of facilities, burying track, and derailment of vehicle in tunnel based on the statistical analysis. The result of priorities were established by the period of restoration. The standard operation system for efficient railway accident management was developed by synthesizing the worst case for rapid emergency restoration, and important events for the standard operation procedures according to each emergency restoration type. Through this study, the restoration operation system of railway accident are recommended. This paper suggests to develop emergency restoration scenarios for the efficient railway accident management and recovery system. The study results will contribute not only for insuring punctuality, but also for minimizing delays from accidents. Therefore, emergency restoration scenarios will play a major role in the SOP for the damage limitation and the prevention of accident spread.

Behavior of Tension Clamp in Rail Fastening System (레일 체결장치 텐션클램프의 거동)

  • Choi, Shin-Hyung;Park, Beom-Ho;Yun, Kyung-Min;Bae, Hyun-Ung;Lim, Nam-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8812-8819
    • /
    • 2015
  • In a situation in which importance of rail fastening system is growing with increasing the construction of concrete track, an accident of tension clamp(the component of rail fastening system) breaking has been recently occurred. This results from various factors such as field condition, operating agency, running condition, traffic frequency and so on. Thus, the study for the behavior of tension clamp is required. In this paper, an experiment and finite element analysis(FEA) have been performed to analyse the mechanical behavior of tension clamp. The stress and displacement of tension clamp have been analyzed as the clamping force through a laboratory test, and they were compared with FEA results. Furthermore, the stress and displacement of the tension clamp are derived from train load condition applying the verified model, and the fatigue vulnerability of the tension clamp is identified through stress analysis.

Development of Brake Disk Materials with Ni-Cr-Mo (Ni-Cr-Mo계 제동디스크 소재 개발)

  • Goo, Byeong-Choon;Lim, Choong-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.2
    • /
    • pp.188-194
    • /
    • 2008
  • Brake disks for rolling stock are exposed to thermal fatigue during braking, and thermal cracks occur on surface of disks. Thermal cracks can cause serious accidents, deterioration of braking performance and increase of maintenance cost due to frequent exchange of friction materials. In this study, candidate materials with high-heat resistance were selected by searching the literature. By using cast specimens made of the candidate materials, chemical composition, crystal structure and graphite type were analyzed. In addition, friction coefficient and wear were measured and compared with values for the disk material in service. As a result, it was shown that the NiCrMo has highest tensile strength and lowest friction coefficient and the disk material in service has the most stable friction characteristics.

Development of Integrated Wireless Network for Railway (철도전용 통합무선망 개발)

  • Song, Yongsoo;Kim, Yong-Kyu;Baek, Jong-Hyen
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.6
    • /
    • pp.551-557
    • /
    • 2013
  • This research aims to conduct a study on the feasibility of the LTE communication method for developing a dedicated integrated railway wireless network. An empirical analysis was carried out by establishing a dedicated integrated railway wireless network in an approximately 12km section between Illo station and Daebul station on the Honam line. Korean wireless communication methods for railway safety are different depending on each line, which makes it difficult for railway workers to cooperate with. This causes various problems. There is the ever-present risk of accidents due to call disconnection between wireless communication systems, frequency interference from commercial networks, and crosstalk. This study verified the feasibility of the 4th generation communication system, LTE, over the dedicated integrated railway wireless network as a solution for the above mentioned problems. The result shows this communication system exceeded existing performance standards of Europe GSM-R in every test item despite the location constraint of train tracks on the base station establishment.

Compensation of Voltage Drop Using the TSC-SVC in Electric Railway Power Supply System (전기철도 AT 급전시스템에서의 TSC-SVC를 이용한 전압강하 보상)

  • 정현수;방성원;김진오
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.16 no.3
    • /
    • pp.29-36
    • /
    • 2002
  • Recently, power quality problems in AC high-Speed Railway system have been raised, because heavy train and its higher speed are required in addition to new control system by using the Electronic devices. The installation/operation of the Series Capacitor(SC) has been only a device far voltage drop in power system up to now. However, the sufficient effectiveness of compensating In voltage drop has not been proved yet because of technical limitationf SC, and harmonic resonance is attracting a attention as one of new issues. Several problems are expected such as vocational problems of a traction substation, and overloading caused by a new construction of electric railway and the in transport. Therefore, extension of power feeding the fault in the traction substation should be also considered. So this paper represents the application of TSC-SVC on the electric railway power feeding system as a device of voltage compensation, and the simulations are executed through PSCAD/EMTDC.

A Conceptual Study of a Framework for Real-Time Railway Safety Monitoring and Control System Based on Safety Performance Monitoring Indicators (안전성과 모니터링지표 기반의 실시간 철도안전 감시제어 시스템의 프레임워크에 대한 개념 연구)

  • Lee, Donghoun;Tak, Sehyun;Kim, Sangahm;Yeo, Hwasoo
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.4
    • /
    • pp.526-538
    • /
    • 2016
  • The government of South Korea has made great efforts in the area of railway safety management by means of a railway safety law and an integrated railway safety plan established in 2004 after the Daegu subway fire accident. However, after certain railway incidents, a reactive railway safety management system has been implemented that has led to fatal accidents caused by the collision, derailment, and fire every year. Hence, this study is intended to propose a framework that integrates data from distributed detection devices into a real-time railway safety monitoring and control system for proactive safety management. Furthermore, we will provide a future development direction for safety performance monitoring indicators to determine whether the railway safety monitoring and control system works effectively. The proposed framework is expected to be a cornerstone for the real-time railway safety monitoring and control system to be implemented in the future.

Deformation Monitoring of Subway Track using by Automatic Measurement (자동화계측을 통한 지하철 궤도 변형 모니터링연구)

  • Jung-Youl Choi;Jae-Min Han
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.1
    • /
    • pp.579-584
    • /
    • 2024
  • Currently, large-scale, deep construction is being carried out adjacent to subway tracks in korea. when excavating adjacent to each other, it is very important to ensure the safety of earth retaining structures and underground structures. therefore, we are managing the safety of the subway by introducing an automated measurement system. deformation of the subway track during adjacent excavation may affect train running stability. this is a factor that can be linked to train derailments. however, current subway track safety evaluation using automated measurement systems relies only on the maximum value of measured data. therefore, a method to improve the usability of automated measurement system results is needed. in this study, we utilized a technique that can quantitatively evaluate the measurement results of a large amount of subway track deformation. a safety evaluation was conducted on subway track deformation due to adjacent excavation using a vast amount of data using probabilistic statistical analysis techniques.

Durability Evaluation on the Air-Braking Release Failure Proof Valve of Cargo Train (화물열차 공기제동 완해불량 방지 밸브의 내구성 평가)

  • Lee, Jun-Ku;Kim, Chul-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.9
    • /
    • pp.32-38
    • /
    • 2020
  • Cargo train braking uses the pressure changes in the air braking pipe to operate the braking tightening and releasing service repeatedly. Air-braking release failure means partial braking caused by a failure of the variable load valve after the driver handling the brake release. This phenomenon causes wheel flaws while driving a wagon, resulting in wheel breakage or train derailment. This study developed the air-braking release failure proof valve considering the technical requirements of the railway operation corporations. In addition, a durability test of the valve was carried out using a braking performance simulator, and its operating performance was evaluated from the pneumatic history under cyclic braking conditions. The warranty life of this valve was assessed by performing 160,000 cycles of testing of 12 prototypes in accordance with the zero-failure test method, considering the number of braking cycles while driving the wagon. During the durability test, the pneumatic input time, output time, and release velocity were almost constant. The warranty life of this valve was 59,860 times the 95% confidence level, which means that it can be operated without trouble for four years when the valve is installed in the bogie of the wagon.