Behavior of Tension Clamp in Rail Fastening System
![]() |
Choi, Shin-Hyung
(Structure Department, Jangmaek Engineering Co., Ltd.)
Park, Beom-Ho (Department of Civil Engineering, Chungnam National University) Yun, Kyung-Min (Department of Civil Engineering, Chungnam National University) Bae, Hyun-Ung (Research Institute for Construction Disaster Prevention, Chungnam National University) Lim, Nam-Hyoung (Department of Civil Engineering, Chungnam National University) |
1 | Seo, S.B., Railway engineering, Book gallery, pp. 147-180, 2008 |
2 | Baik, C.H., The Parametric Study on the Performance Characteristics of Elastic Rail Fastening System on the Sharp Curved Track, Seoul National University of Science and Technology, 2012 |
3 | Seo, S.B., Track engineering, Book gallery, pp.37-77, 2009 |
4 | Vossloh, Rail fastening systems for slab tracks -System 300, Publications. |
5 | Ansys, Workbench Manual ver.14.5, 2012 |
6 | DIN EN 10089, Hot rolled steels for quenched and tempered springs technical delivery conditions, 2003 |
7 | KS D 3503, Rolled steels for general structure, 2013 |
8 | Lee, D.W., Choi, J.Y., Baik, C.H., Park, Y.G., "Influence of Initial Clamping Force of Tension Clamp on Performance of Elastic Rail Fastening System", Journal of the Korean Society of Civil Engineers, Vol.33, No.3, pp. 1243-1251, 2013 DOI: http://dx.doi.org/10.12652/Ksce.2013.33.3.1243 DOI |
9 | Lee, J.D., Railroad Track Mechanics, pp.55, 2001 |
![]() |