• Title/Summary/Keyword: 연구개발기획

Search Result 1,087, Processing Time 0.024 seconds

대형.장기 국가연구개발사업 추진과제 발굴 및 선정 방안 연구

  • Kim, Hyeon-Cheol;Gang, Byeong-Ok;Lee, Eung-Suk;Mun, Gil-Ju;Yang, Hyeon-Mo;Park, Yun-Seok;Kim, Jeong-Won;Kim, Ja-Hyeon;Kim, Han-Seok;Yun, Sin-Hye
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2010.11a
    • /
    • pp.362-378
    • /
    • 2010
  • 글로벌프론티어연구개발사업의 정의 및 개념을 소개하고, 미래도전과제 및 과학기술대안 후보 Pool 구축 방안과 사전기획을 위한 후보과제 도출 과정, 상세기획 추진방법론, 사업관리 프로세스 설계 및 국내에서 처음으로 시도된 토론평가를 통한 연구단장 선정 등, 향후 국가 대형 장기 연구개발사업의 기획 선정평가 방안을 제시함.

  • PDF

A study on the technical consideration in initial game software planning of online game (온라인 게임 초기 기획단계에서 고려될 기술 요소에 대한 연구)

  • Lee, Myoun-Jae;Kim, Kyoung-Nam
    • Journal of Korea Game Society
    • /
    • v.3 no.2
    • /
    • pp.3-11
    • /
    • 2003
  • Game software planning is divided into initial game software planning and detailed game software planning. Technique, design, marketing should be considered in initial game software planning. Especially, technical considerations, platform and game engine and sewer construction and sewer architecture should have effect on development cost and time. So, game software designer should choose technical consideration which is suitable for purpose of game software planning. In this paper, we researched technical considerations in initial game software planning, focusing on platform, game engine, game service, network infrastructure.

  • PDF

Theoretical Approach on the Development Stage of Animation Production Pipeline (애니메이션 제작 공정에 관한 이론적 고찰 : Development (기획개발) 단계를 중심으로)

  • Kwon, Jae-Woong
    • Cartoon and Animation Studies
    • /
    • s.33
    • /
    • pp.173-202
    • /
    • 2013
  • This research focuses on the part of animation production pipeline. Among the four stages in the process (development, pre-production, main production, and post-production), this research explores theoretical features of the development stage. As the development stage is not well-known and theorized in Korea, this research provides roles and values of the development stage. The development stages is very important because two works have to be proceeded in this stage. First, the story idea for making animation should be decided. Ideas have to be developed into definite synopsis. And, the bible to pitch for investors are prepared on the basis of the story. Secondly, the basic production plan has to be initiated. This production plan includes the financial budget, the production schedule, and the production team. These three elements are so crucial that the producer (or executive producer) should take into consideration from the early stage of production.

A Service Model for Supporting Research Planning based on Research Outcome Analysis (연구성과 분석 기반의 연구기획지원 서비스 모델)

  • Choi, Heeseok;Choi, Kiseok;Kim, Jae-Soo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1062-1064
    • /
    • 2012
  • 최근 개방과 협력 기반의 연구정책 수립, 연구기획, 연구개발, 성과 활용 확산 등이 매우 중요하게 인식되고 있다. 특히 기술융합 시대에 연구역량을 하나로 집중하고 창조적인 연구개발을 지원하기 위해서는 연구기획 단계에서부터 개방과 협력에 기반한 연구지원체계가 필요하다. 본 연구에서는 연구성과 분석을 통해 획득 가능한 정보와 서비스 기능에 대해서 살펴본다. 또한 연구기획 활동별 서비스 요구사항을 정의하고, 이를 바탕으로 연구성과 분석결과를 기반으로 한 연구기획지원 서비스 모델을 제안한다.

A Study on the Improvement of SOC Project Planning Process and Systems (국내 SOC 사업의 기획업무 개선에 관한 연구)

  • Shin Dongwoo;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.45-52
    • /
    • 2000
  • In Korea, demand for the Social Overhead Capital(SOC) projects has tremendously increased since 1970's and is expected to keep growing to support national economic development as well as to enhance the quality of life. In these projects, project planning and feasibility study phase is one of the most critical phases because it determines the success of later phases. However, we have experienced trial and errors repeatedly such as cost overruns and schedule delays in many of the SOC projects. These problems can be prevented or at least expected in the earlier phase and it requires well-developed and standardized project planning process and systems before design, procurement, and construction phases begin. Therefore, the purpose of this research is to investigate current problems in this phase and provide framework for a model for the project planning management which can be used for the SOC projects to insure the whole project success.

  • PDF

A Study on the Effects of SME's Technology Planning Competency on the Success of Commercialization (중소기업의 기술기획 역량이 기술사업화 성공에 미치는 영향에 관한 연구)

  • Lee, Jongmin;Noh, Meansun;Chung, Sunyang
    • Journal of Technology Innovation
    • /
    • v.21 no.1
    • /
    • pp.253-278
    • /
    • 2013
  • SMEs in Korea have increased their investment in R&D as they have recognized the importance of technology development. However, Korean SMEs have been lacking in technological competencies and commercialization capabilities. Also, SMEs often have difficulties in technology planning and preliminary research in R&D process. Under this background, this paper analyses the effects of SMEs' technology planning competency on the success of their commercialization, as their low technological competencies are due to the low capabilities of technology planning. The result shows that SMEs' cooperation partnership and market orientation are significant determinants to the success of their technology commercialization. The study used logistic regression analysis model.

  • PDF

생체지문 인식장치의 전략적 상품기획

  • 강병노;송수정
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.303-307
    • /
    • 2003
  • 본 연구는 생체지문 인식장치의 전략적 상품기획 프로세스를 통하여 표준화된 신상품 기획안을 도출하는데 있다. 이를 위해 사업전략과 목표시장을 설정한 후 1차 설문결과, 고객 요구준건을 , 2차의 설문조사 응답 결과를 바탕으로 기획품질을 결정하며, 이것의 만족도 정도를 Sales point로 삼았다. 상관 매트릭스를 이용하여 요구품질과 기술적 요소의 대응 정도를 살펴 본 후, 개발 제품 현재의 품질 특성치를 파악하기 위해 경쟁업체의 제품을 기준으로 벤치마킹 테스트를 실시하여 첫째, 세대별 상품전략 둘째, 세대별 요소기술 map. 셋째, 세대별 상품 컨셉. 넷째, 세대별 개발계획의 4개 파트의 다세대 상품기획을 수립하였다.

  • PDF

The Role of Industry Quantitative Analysis in the Process of National R&D Project Planning (정부기술개발사업 과제기획과정에 있어 산업분석의 역할과 의미 - 에너지기술개발사업을 중심으로 -)

  • Kim, Bong-Gyun;Park, Song-Dong
    • Journal of Korea Technology Innovation Society
    • /
    • v.13 no.3
    • /
    • pp.459-470
    • /
    • 2010
  • The aim of this study were to investigate the process of national R&D project planning by using the industry quantitative analysis(especially supply-chain enterprise ananlysis). In the selection process of funding project, the role and significance of the industry analysis can be identified as the effective guideline of using this methodology. Across the study, the following is noted : the factors of R&D effectiveness and R&D necessity are found reliable and valid. On the other hand, the emptiness of supply chain and the positive effect of foreign trade balance did not influence the selection of project. The information gained from this study will help us to define better expectations and industry analysis employing to the National R&D Project Planning.

  • PDF