• Title/Summary/Keyword: 연계적 모델링 공정 시스템

Search Result 8, Processing Time 0.028 seconds

A Study on Effective Methods of Polygon Modeling through Modeling Process-Related System (모델링 공정 연계 시스템을 통한 효율적 폴리곤 모델링 기법에 대한 탐구)

  • Kim, Sang-Don;Lee, Hyun-Seok
    • Cartoon and Animation Studies
    • /
    • s.37
    • /
    • pp.143-158
    • /
    • 2014
  • In the modeling processes of 3D computer animation, methods to build optimal work conditions to realize real forms for more efficient works have been advanced. Digital sculpting software, published in 1999, ZBrush has been positioned as an essential factor in character model work requiring of realistic descriptions through different manufacturing methods from previous modeling work processes and easy shape realization. Their functional areas are expanding. So, in this production case paper, as a method to product more optimized animation character models, the efficiency of production method linking digital sculpting software (Z-Brush) and animation production software (Maya) was deliberated and its consequences and implications are suggested. To this end, first the technical features of polygon modeling and Retopology were reviewed. Second, based on it, the efficiency of animation character modeling work processes through step linking ZBrush and Maya suggested in this paper was analyzed. Third, based on the features drawn before, in order to prove the hypothesis on modeling optimization method suggested in this paper, the production process of character Dumvee from a short animation film, 'Cula & Mina' was analyzed as an example. Through this study, it was found that technical approach easiness and high level of completion could be realized through two software linked work processes. This study is considered to be a reference for optimizing production process of related industries or modeling-related classes by deliberating different modeling process linked systems.

simulation of PSA process in $H_2$ production process from WGSR (WGSR off gas로부터 수소 회수를 위한 PSA 연계공정 모델링 및 공정모사)

  • Kim, Min-Kyu;Ahn, Sol;Lee, Chang-Ha
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.518-521
    • /
    • 2008
  • 수소에너지는 다양한 원료로부터의 수소생산을 위한 반응기술 및 생산물로부터 수소 정제를 위한 분리기술의 확립과 더불어, 대형화 시스템부터 소형 시스템에 이르는 공정기술을 확보하는 것이 다가오는 청정 대체에너지 체제에 대비하기 위하여 필요하다. 이를 위해서는 생산된 수소 혼합물에서부터 수소를 분리 정제하는pressure swing adsorption (PSA) 의 개발이 필수적이다. 이 기술은 이미 다양한 분야에 성공적으로 상용화 적용되어 기술의 타당성을 제시하고 있으나, 국내의 경우 수입에 의존하고 있어 이를 설계 할 수 있는 공정모사기 (simulator)의 개발이 우선되어야 한다. 따라서 효율적으로 PSA 공정 및 scale-up기술을 확보하기 위해서는 전산모사기 개발의 선행이 필수적이다. PSA 공정의 전산모사기는 물질수지, 에너지수지, 모멘텀수지와 더불어 흡착평형과 속도식이 결합되어 개발되어야 한다. 특히 공정에 다양한 단계가 적용되기 때문에 복잡한 boundary condition이 적용되며, 연속순환공정이라 하더라도 각 단계가 discrete 하게 해석되어야 한다. 따라서 공정모사는dynamic simulator로 개발되어야 정확도를 확보할 수 있다. 본 연구에서는 제철소에서 발생하는 수소혼합물이 WGSR 반응기를 거쳐 수소의 농도를 향상 시키고, 이를 유입가스로 사용하는 $H_2$ PSA 공정 모사기를 개발하고자 한다. 수소 생산을 위한 PSA 공정 모사기 개발을 통하여 95% $H_2$ 순도와 90% 회수율 규모의 수소를 생산할 수 있는 PSA 공정의 설계 기술기반을 확보하고자 한다.

  • PDF

Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF

Business Process Modeling for Building SCM Information Systems of the Specialized Textile Industry (섬유산업 특화 SCM 정보 시스템 구축을 위한 비즈니스 프로세스 모델링)

  • Kim, Dae-Geun;Park, Man-Gon
    • Proceedings of the Korea Multimedia Society Conference
    • /
    • 2012.05a
    • /
    • pp.172-176
    • /
    • 2012
  • 섬유산업은 다품종 소량생산 및 납기단축을 요구함으로써 기업간 실시간 정보협업 (재고유무, 공정진행 등)이 필수 요소로 대두되고 있으며, 이를 해결하기 위하여 섬유산업 특성을 반영한 효율적 정보 협업시스템 개발 및 보급을 목적으로 SCM 정보시스템 구축을 위한 비즈니스 프로세스를 모델링하였다. 또한 기업에서 현재 사용 중인 ERP 외 신규 SCM 구축에 따른 기존 사용자 거부반응을 최소화하기 위하여 기존 사용 중인 ERP시스템에 부착하여 정보협업이 가능한 표준 게이트웨이 모듈과 자체 시스템이 없는 중소 영세기업을 위한 Saas기반SCM으로 분류하여 비즈니스 프로세스를 설계 및 프로토타입을 구현하였으며, 기업 데이터 연계를 위한 거래문서정보 표준화 도출을 통하여 수평적 정보협업 업무통합 비즈니스 프로세스를 설계하였다.

  • PDF

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Jung, Do-Young;Baek, Yuong-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.321-325
    • /
    • 2008
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

Potential of Contaminant Removal Using a Full-Scale Municipal Water Treatment System with Adsorption as Post-Treatment (실 규모 물 처리 공정 및 후속 흡착 처리에 의한 오염원 제거 잠재성 평가)

  • Haeil Byeon;Geonhee Yeo;Anh-Hong Nguyen;Youngwoong Kim;Donggun Kim;Taehun Lee;Seolhwa Jeong;Younghoa Choi;Seungdae Oh
    • Land and Housing Review
    • /
    • v.15 no.1
    • /
    • pp.167-177
    • /
    • 2024
  • This study aimed to assess the efficacy of an adsorption process in removing organic matter and micropollutant residuals. After a full-scale water circulation system, the adsorption process was considered a post-treatment step. The system, treating anthropogenically impacted surface waters, comprises a hydro-cyclone, coagulation, flocculation, and dissolved air flotation unit. While the system generally maintained stable and satisfactory effluent quality standards over months, it did not meet the highest standard for organic matter (as determined by chemical oxygen demands). Adsorption experiments utilized two granular activated carbon types, GAC 830 and GCN 830, derived from coal and coconut-shell feedstocks, respectively. The assessment encompassed organic materials along with two notable micropollutants: acetaminophen (APAP) and acid orange 7 (AO7). Adsorption kinetics and isotherm experiments were conducted to determine adsorption rates and maximum adsorption amounts. The quantitative findings derived from pseudo-second-order kinetics and Langmuir isotherm models suggest the effectiveness of the adsorption process. The findings of this study propose the potential of employing the adsorption process as a post-treatment to enhance the treatment of contaminants that are not satisfactorily treated by conventional water circulation systems. This enhancement is crucial for ensuring the sustainability of urban water cycles.

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Baek, Young-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.695-699
    • /
    • 2009
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

Visualization Technology of GIS Associated with Seismic Fragility Analysis of Buried Pipelines in the Domestic Urban Area (국내 도심지 매설가스배관의 지진취약도 분석 연계 GIS 정보 가시화 기술)

  • Lee, Jinhyuk;Cha, Kyunghwa;Song, Sangguen;Kong, Jung Sik
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.28 no.2
    • /
    • pp.177-185
    • /
    • 2015
  • City-based Lifeline is expected to cause significant social and economic loss accompanied the secondary damage such as paralysis of urban functions and a large fire as well as the collapse caused by earthquake. Earthquake Disaster Response System of Korea is being operated with preparation, calculates the probability of failure of the facility through Seismic Fragility Model and evaluates the degree of earthquake disaster. In this paper, the time history analysis of buried gas pipeline in city-based lifeline was performed with consideration for ground characteristics and also seismic fragility model was developed by maximum likelihood estimation method. Analysis model was selected as the high-pressure pipe and the normal-pressure pipe buried in the city of Seoul, Korea's representative, modeling of soil was used for Winkler foundation model. Also, method to apply developed fragility model at GIS is presented.