• Title/Summary/Keyword: 업무프로세스관리 시스템

Search Result 447, Processing Time 0.024 seconds

Development of Web-Based VE Supporting System for Effective Workshop (효율적인 VE워크숍을 위한 웹기반 VE지원시스템 개발에 대한 기초연구)

  • Lim, Jongkwon;Kim, Sunghun;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.71-78
    • /
    • 2014
  • Value Engineering methodology was introduced about 30years ago and has significant achievement in Korea. However, many of workshop still focus on cost down process and do not spend enough time on function analysis and expert cooperation. As a result, limited range of creative ideas were produced. To improve effectiveness of VE workshop, this study developed web-based value engineering process and system. And this study applied it to real case study to evaluate effectiveness of proposed system. Developed VE system also provides automated FAST diagram function and decision-making supporting tools. The authors found that this developed web-based VE system can significantly help to save cost and improve performance of VE workshop by using the appropriate VE process, and quick cooperation between experts. In addition, this study shows an example of a VE case study that applies the web-based VE system process, which led to a very innovative and effective way to lead workshop.

A Study on the Application of Block Chain Technology on EVMS (EVMS 업무의 블록체인 기술 적용 방안 연구)

  • Kim, Il-Han;Kwon, Sun-Dong
    • Management & Information Systems Review
    • /
    • v.39 no.2
    • /
    • pp.39-60
    • /
    • 2020
  • Block chain technology is one of the core elements for realizing the 4th industrial revolution, and many efforts have been made by government and companies to provide services based on block chain technology. In this study we analyzed the benefits of block chain technology for EVMS and designed EVMS block chain platform with increased data security and work efficiency for project management data, which are important assets in monitoring progress, foreseeing future events, and managing post-completion. We did the case studies on the benefits of block chain technology and then conducted the survey study on security, reliability, and efficiency of block chain technology, targeting 18 block chain experts and project developers. And then, we interviewed EVMS system operator on the compatibility between block chain technology and EVM Systems. The result of the case studies showed that block chain technology can be applied to financial, logistic, medical, and public services to simplify the insurance claim process and to improve reliability by distributing transaction data storage and applying security·encryption features. Also, our research on the characteristics and necessity of block chain technology in EVMS revealed the improvability of security, reliability, and efficiency of management and distribution of EVMS data. Finally, we designed a network model, a block structure, and a consensus algorithm model and combined them to construct a conceptual block chain model for EVM system. This study has the following contribution. First, we reviewed that the block chain technology is suitable for application in the defense sector and proposed a conceptual model. Second, the effect that can be obtained by applying block chain technology to EVMS was derived, and the possibility of improving the existing business process was derived.

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

A Study on Test Report Information Service Architecture for Preventing Forgery and Alteration in Defense Industry (군수품 시험성적서 위·변조 방지 시스템 아키텍처에 대한 연구)

  • Lee, Donghun;Jeon, Sooyune;Bae, Manjae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.4
    • /
    • pp.43-51
    • /
    • 2016
  • Preventing the forgery and alteration of test reports is important, in order to maintain the reliability of military supplies. Based on a survey of reports on testing institutions and a case study of established electronic document systems in the public sector, we propose a system architecture, which helps prevent the forgery and alteration of test reports with legal force. The proposed architecture takes advantage of both the time stamp that records the time a document is received and a server synchronized with the testing institution. Using the proposed system architecture, the user is able to request a test and receive reports from the testing institution without delay. Also, a defense agency is able to conveniently prove the authenticity of the test reports and utilize the statistical data collected by the architecture. Therefore, we expect that the proposed system architecture will help defense agencies to prevent the forgery and alteration of test reports and ensure their reliability and quality.

Implementation of Supply Chain Management In Construction Industry (건설 산업에서의 공급사슬관리(SCM) 적용에 관한 연구)

  • Park Sang-Hyuk;Kim Yea-Sang;Chin Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.85-94
    • /
    • 2003
  • The goal of enterprises is to make a profit. They should change and evolve themselves according to various customers' demand and developing information technology. The construction industry has not been used to such a change of business environment, although it has a long history. So it needs a new management system that accepts the various demands of construction participants and keeps pace with the evolving environment where is replaced by high-valued one. In this point, this research's objective is to apply SCM which shows visible outcome in the manufacturing industry, to the construction industry. This study regards the concept of SCM not as a simple management method, but as a comprehensive one. In other words, SCM is composed of three viewpoints; control, organization and information technology. SCM is to improve process by new management method, to benefit each other by strategical cooperation among participants, and to make information delivery and saving system for maintaining the relationship.

Constructing Spatial Data Warehouse for Forest Information Standardization Service of Municipal Governments (지자체 산림정보 표준화 서비스를 위한 공간 데이터웨어하우스 구축)

  • Jo, Yun-Won
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.12 no.2
    • /
    • pp.11-22
    • /
    • 2009
  • Recently the integration and development of ST(Spatial Technology) and forest geographic information have been used very efficiently for the forest administration. However, even though many application system related to forest information have been developed and improved, there are still paper based inventories management and hand work for data construction and upgrade. In this study the forest information warehouse, which is mapped and managed at work-site operations, was constructed based GIS technology so that the standardization and consistency of current data could be acquired in real time. In addition, these thematic maps were conducted on high resolution satellite images and managed in web based forest information data warehouse form and finally shared through Internet for the very first-line administration officials. This study shows that the forest information standardization service of municipal governments very first time in the Korea and provides the unified decision making support and enterprise formed forest database so that is expected to be the very successful sample to suggest the prototype of national forest spatial data infrastructure.

  • PDF

A study on Production Management Efficiency Method using Supervised Learning based Image Cognition (이미지 인식 기반의 지도학습을 활용한 생산관리 효율화 방법에 관한 연구)

  • Jang, Woo Sig;Lee, Kun Woo;Lee, Sang Deok;Kim, Young Gon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.5
    • /
    • pp.47-52
    • /
    • 2021
  • Recently, demand for artificial intelligence solutions for production process management has been increasing in the manufacturing industry. However, through the application of AI solutions in the manufacturing industry, there are limitations to legacy smart factory solutions such as POP and MES.Therefore, in order to overcome this, this paper aims to improve production management efficiency by applying guidance, an artificial intelligence concept, to image recognition systems. In the system flow, As_is To be separated and actual work flow was applied, and the process was improved for overall productivity efficiency. The pre-processing plan for AI guidance learning was established and the relevant AI model was designed, developed, and simulated, resulting in a 97% recognition rate.

The Present Status and Vision of Virtual Construction System Development (가상 건설 시스템 개발 현황과 비전)

  • Kim, Jae-Jun;Choi, Cul-Ho;Shin, Hyun-Mok;Jin, Sang-Yoon;Lee, Kwang-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.170-175
    • /
    • 2008
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

Suggestion of a Digital Curation Framework for Historical Contents (역사콘텐츠 활용을 위한 디지털 큐레이션 프레임워크 제안)

  • Lee, Hyewon
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.16 no.3
    • /
    • pp.235-256
    • /
    • 2016
  • This study suggested a digital curation framework for supporting the digital policy of institutes that collect memory. As such, it conducted a literature review and an analysis of digital curation models, as well as a focus-group interview of historians and graduate students majoring in historical studies. In this study, digital curation framework refers to an abstract model for supporting policy development and the planning for a high-level view of the archival information service. This implications of this framework are as follows: (1) to emphasize the data life cycle and connection between stages and actions; (2) to make an infra-schema for understanding institutes that create, arrange, or store specific data as the same history contents have to be provided by different institutes and as there are differences in the data's value; (3) to check the present conditions of information services and their systems; (4) to consider the practical applications of contents that have been collected and stored; and (5) to converge all data in one system through the framework and activate diverse works in the context of the framework.

Development of 3-Dimensional Rebar Detail Design and Placing Drawing System (3차원 배근설계 및 배근시공도 작성 자동화 시스템 개발)

  • Choi, Hyun-Chul;Lee, Yunjae;Lee, Si Eun;Kim, Chee Kyeong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.4
    • /
    • pp.289-296
    • /
    • 2014
  • The rebar detailing is an important work influencing the final performance and quality of RC structures. But it is one of the most irrational and illogical activity in construction site. Many groups of workers, including main contractors, structural engineers, shop drawers, rebar fabricators, and etc., participate in this activity. A loosely-organized process for this activity is apt to produce a big amount of rebar loss or even degraded structures. A 3-dimensional rebar auto-placing system, called as Rebar Hub, has been designed and implemented in this research. Rebar Hub provides a totally integrated service from 3D structural modeling of buildings to rebar auto-placing considering anchorage, splice, and the length of ordered rebar. In addition, Rebar Hub can recognize the 2D drawing CAD files and then build 3D structural models which are used for the start point of 3D rebar auto-placing. After rebar auto-placing, each members of the 3D structural model have rebar information belonging to them. It means that the rebar information can be used for the afterward works such as quantity-survey, manufacturing and fabrication of rebars. Rebar Hub is showing outstanding performance while applying to practical projects. It has almost five times productivity and reduces the rebar loss up to 3~8% of the initially-surveyed amount of rebar.