A Study on Development Framework of Lift-up and Procurement System for Effective Resource Management in the Building Construction (건설공사의 자재관리 효율화를 위한 조달 및 양중시스템 기반구축에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.133-139
    • /
    • 2004
  • The purpose of this study is to present an improved lift-up &procurement work flow for effective resource utilization in building construction. The current lift-up &procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up &procurement work flow. The main contents of the study are as follows; 1) Problems of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning was investigated. The study recommends continuous improvement of lift-up &procurement work flow and efficient management of information in building construction as a future research.

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.

Monitoring-Evaluation System for Lifting Heavy Structures using 3D Location Data (3차원 위치좌표를 이용한 대형 구조물 양중을 위한 계측 - 평가 시스템)

  • Lee, Myung Ho;Chun, Sung Chul;Oh, Bohwan
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.4
    • /
    • pp.413-420
    • /
    • 2009
  • Heavy structures such as large roof structures and superbeams were lifted using hydraulic jacks. Moreover, member verticality and horizontality checks were performed at every construction stage to monitor the measuring tapes for their structural safety, using CCTV. When the relative displacement exceeded the predetermined limit, the hydraulic systems were terminated. After adjusting the relative displacement manually, lifting was resumed. The accuracy of the relative displacement was found not to be reliable, however, due to eye check using CCTV, and it took a long time due to manual adjustment. Moreover, real-time monitoring was impossible. To address these problems, the monitoring-evaluation system for the stable lifting of heavy structures was proposed, using the total station of the automatic-target-recognition type, laser-distance-measuring devices, a data logger, a strain gauge, and others. After developing a program for the operation of the system and for the acquisition of data, a mock-up test was conducted in a large-scale structural laboratory to evaluate the accuracy and applicability of the system. The stable acquisition and applicability of data was confirmed in the test.

A Study on the Improving Life-up and Procurement Work Flow for Effectiveness of Resources increase in the Building Construction (건설공사의 자원 효용성 증대를 위한 조달 및 양중 작업흐름 개선에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2003
  • The purpose of this study is to present an improved lift-up & procurement work flow for effectiveness of resources increase in building construction. The current lift-up & procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up & procurement work flow. The main contents of the study are as follows; 1) A problem of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning The study recommends that continuous improvement of lift-up & procurement work flow and efficient management of information in building construction.

  • PDF

A Study on the Hoisting Planning System in Highrise Building Construction (초고층 건축공사의 양중계획 시스템에 관한 연구)

  • Kim, Jung-Jin;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.121-130
    • /
    • 2005
  • A systematic hoisting planning for tower crane is the most important elements in highrise building construction. However without sufficient data, systematic approach, it is not with ease to produce an appropriate planning at the rite. Therefore, this research aims at developing a systematic hoisting planning system in visual graphic with systematic procedure. The result of this research is that developed system on hoisting load calculation, numbers and specification of tower cranes are graphically visualized easily at the site. The study of applying this system to real project proves that it presents a sufficient capability as a useful tool in the hoisting planning of highrise building projects.

A Study on directions of Developing a Transportation and Procurement System for JIT Management of Curtain Walls in High-Rise Building Construction (커튼월 공사의 적시생산(JIT)관리를 위한 양중 조달 시스템 개발방향에 관한 연구)

  • Yang Jong-Youb;Ahn Byung-Ju;Baek Jong-kun;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.371-374
    • /
    • 2002
  • Purpose of this study is to suggest the directions for development of a transportation and procurement system for JIT management of curtain walls. First, this study looks over the concept of JIT, and grasps the characteristics of the material and the problems of logistics in the construction field through the field and literature survey. And then, it develops countermeasures for the problems and with this, it suggests the directions for development of a transportation and procurement system for JIT management.

  • PDF

A System for the Selection of the Optimum Tower Cranes(Opt-TC) (건설현장의 조건을 고려한 최적 타워크레인 선정시스템)

  • Ho, Jonh-Kwan;Kim, Sun-Kuk;Kook, Dong-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.216-226
    • /
    • 2007
  • The efficient vertical lift planning has been brought into relief in high-rise building construction projects. Particularly, the selection and stability examination of the tower cranes is the most important elements in vertical lift planning. Therefore, professional knowledge is needed to full fill the site condition for the plan. However, there are short of the number of specialists and information about tower cranes. This study proposes a system for the selection of the optimum tower cranes (Opt-TC) in high-rise building construction projects. The Opt-TC can give the selection and stability examination of tower cranes at once in real-time.

Behavior Monitoring of Precast Concrete Panels in Lifting (프리캐스트 패널의 양중에 따른 거동 계측 연구)

  • Yang, Sung Chul;Kim, Seong Min;Han, Seung Hwan;Yoon, Sang Chun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.51-59
    • /
    • 2012
  • Through this research safety factors were analyzed for concrete precast panels in road pavement which happens in lifting, moving, and installing. Two half size of full-scale precast concrete panels were made while one full-scale precast concrete panel was made. A series of strain gages for concrete and steel were installed and measured in lifting and transporting. Measurement results indicate that in case of 60 degree of lifting, small scale panel in dynamic motion produces about 3.54 times of strain compared to the static condition. However strain measurement of full-scale concrete panel in lifting and transportation does not yield any big difference compared to the small scale panels in the static condition. From this experimental results safety of the full-scale concrete panel was attained for the lifting system adopted in this research.

A Study on the Economic and the Field Application Feasibility of Unit Curtain Wall Mullion Rail Lift System (유니트 커튼월 멀리온 레일 양중 시스템의 경제성 및 현장 적용 가능성에 관한 연구)

  • Jung, Ui-In;Kim, Hea-Na;Kim, Bong-Joo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.1
    • /
    • pp.41-49
    • /
    • 2021
  • This study was to solve the lift problem of the existing unit curtain wall type by using the vertical material mullion as a rail in curtain wall, which is recently used as an external finishing material for high-rise buildings. It has been shown that the application of the curtain wall mullion's rail can be quantified even at 20m/sec wind speed through the Mock-Up test. Based on the sites selected for comparison of construction methods, it was analyzed that the construction period could be shortened by 48 days, or about 20 percent. It was analyzed that the number of construction workers could be reduced by about 33 percent from the previous nine to six. Based on these results, assuming the installation of curtain wall units of 10,000㎡, it is judged that construction cost can be reduced by 80% or more.

Developing the Towercranes Planning Process in High-rise Building Project (고층 건축공사의 타워크레인 계획 프로세스 개발)

  • Chae Hee-dong;Jang Myung-houn;Lee Hyun-soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.387-392
    • /
    • 2001
  • The purpose of this study is to develop the process to support and evaluate experts' decision making on vertical transportation planning in high-rise building constructions. Experts generally carry out the vertical transportation planning by heuristic methods, so there is a possibility that their decisions failed. The failure of the vertical transportation planning can be result in much loss of time and cost. The process presented in this paper evaluates experts' alternatives, organizes the results of the vertical transportation plan, and then leads to the systematic flow of materials and crews.

  • PDF