• Title/Summary/Keyword: 실적자료관리시스템

Search Result 64, Processing Time 0.029 seconds

A Study on the Improvement of Historical Data For Knowledge Management in Construction Project (지식관리(KM)를 위한 건설공사 실적자료관리 개선방안 연구)

  • Lee Tai Sik;Song Jae Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.468-471
    • /
    • 2001
  • The importance of early project planning is broadly recognized for construction projects. From the planning step, If extensive historical data related with the project is applied effectively, It can be major resource for estimating cost and project scope. However, The accumulation, analysis, and application of historical data is not sufficient in Korea. So useful information of construction project has disappeared. In order to solve the problems, Project Historical Data Management Systems is need to be developed. The purpose of this study is to analyze current problems and to find the method to utilize historical data in similar project.

  • PDF

효율적인 자료관리를 위한 소프트웨어시스템의 설계 및 구현

  • 이용직;정인기;백두권
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.10a
    • /
    • pp.51-58
    • /
    • 1993
  • 현대 사회가 점점 복잡한 정보화 사회로 변해감에 따라 개인의 자료 또한 기존의 방법으로는 효율적인 관리가 어렵게 되었다. 이러한 상황속에서 연구소 및 대학 연구원들의 늘어나는 연구실적을 효율적으로 관리하기 위하여 본 논문에서는 연구원들의 연구실적을 컴퓨터에 저장하여 효율적으로 관리할 수 있는 연구실적관리시스템(RAMS : Research Accomplishment Management System)을 설계, 구현하였다. 본 시스템은 연구실적을 효율적으로 관리할 수 있도록 각 연구실적에 관한 원시자료만을 입력시킨 후 이를 이용하여 원하는 내용의 연구실적을 조회하고, 각 연구실적별 내용을 원하는 양식에 맞게 출력을 할 수 있게 해주었으며 또한 개인별 실적관리 뿐만 아니라 소규모 집단(연구소)에서의 개인별 관리를 용이하게 하기 위하여 개인화일을 코드화해서 관리해주는 기능을 가지도록 하였다.

  • PDF

A Study of the Actual Construction Data Management System for Apartment Housing (공동주택의 공사실적자료 관리시스템 분석)

  • Park Hyung-Jae;Kim Tae-Hee;Kim Sun-kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.489-494
    • /
    • 2001
  • Actual construction data of completed projects can be utilized for the economic, time benefit of improving the efficiency on planning, designing, estimating and managing tasks in succeeding projects. But the lack of the system which accumulates and manages the actual data with standardized type, it has not performed well and stayed on early stage. It is required not only specific plan for the utilization of actual data but a construction information management system which collects and processes far-reaching data with standardized from based on facility. Therefore, the purpose of this study is to develop a construction information management system for Apartment housing ,which stored data along project feature database, actual cost database and actual database based on the Web. This effort can make an offer the clearness of dull construction market and the base of construction intelligence

  • PDF

Assessment of National Quality Control System for the Hydrological Data (국가 수문자료 품질관리시스템 운영성과)

  • Kim, Hyoung-Seop;Cho, Chang-Hun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.634-634
    • /
    • 2012
  • 국가 차원에서 일관된 수문자료 품질관리기준을 제시하고, 현업에서 활용 가능한 시스템을 구축하기 위해 개발된 국가 수문자료 품질관리시스템은 2007년부터 한강, 낙동강, 금강, 영산강홍수통제소에서 적극 활용하여 수문자료 신뢰도 향상에 기여하고 있다. 본 연구에서는 기 구축된 국가 수문자료 품질관리시스템을 한강, 낙동강, 금강, 영산강홍수통제소에서 관할하는 수문관측소 및 수문자료에 적용, 운영 실적을 지속적으로 분석하고 수문자료의 이상률, 결측률 등의 통계분석을 통해 수문자료 품질 및 신뢰도를 정량적, 정성적으로 나타내고 품질관리 업무 실시 후의 개선 효과를 제시하였다. 이를 통해 국가 수자원을 적극적으로 관리하여 신뢰성 있는 수문자료를 확보하고 품질 수준 향상을 위한 개선작업을 꾸준히 수행함으로써 수문자료의 신뢰도 제고와 국가 수문자료 관리업무의 효율성을 증대시키고자 한다.

  • PDF

The Development of a Schedule Management Support System Using Productivity Information of Construction Activities (단위작업 생산성 정보를 활용한 공정관리 지원시스템 개발)

  • Oh, Se-Wook;Park, Sang-Gyu;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.181-192
    • /
    • 2005
  • Labor work information can be converted into the useful construction information in an effort to analyze project status, measure performance, and design a new similar project plan. The labor work information can also be used to make productivity data, which can be used to analyze the relationship between 'as planned' and 'as built' in scheduling management of a project, and to calculate 'percent completion' as well as analyzing delay cause. It is require to effectively collect the labor work information base on the activities. In general, current project management heavily depends on the experience and judgment of project managers, according to the work progress. However, relying on the oかy experience and judgment of the project managers might deteriorate the transparency or reliability of the collected labor work information. The purpose of this research is thus to develop a computer-based system for monitoring the work information generated by labors input in activities using PDA and Barcode technologies, and to propose a application method of the productivity data for effective project management.

An Application of PDA and Barcode Technology for the Improvement of Information Management in Construction Projects (건설프로젝트 정보관리 효율화를 위한 PDA 및 Barcode 적용기술 개발)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo;Sung Nak-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.553-558
    • /
    • 2003
  • The information of works performed by labors can be used for analyzing project status related to schedule, cost and productivity, etc. The purpose of this research is to develop a computer-based system by the application of PDA and barcode technology in order to measue and monitor the amount of workforce resources, works done and productivity. It is anticipated that the effective use of the devepoped system would be able to effectively assist the schedule planning and management for present and prospective construction projects.

  • PDF

Development of an Information System for managing the Service Performances in Public Construction Technique Fields (공공건설기술의 용역실적관리를 위한 정보시스템 개발)

  • Kim, Seong-Jin;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5993-5999
    • /
    • 2013
  • This study presents the information management item and the business process improvement plan managed all construction technique services of Design, Construction Supervision and Construction Management which is ordered and constracted by the public institution in the field of construction and business steps. In addition, it develped the Management System of Construction Technique Service Performances based on improved processes for the Public Agencies and Construction Service Director to register, review and approve the Service Performance Information. As a result, it would be help transparently managed Technical Engineer's work duplication status of Constuction Company, and checked online without having to submit Company performance data by providing objective and reliable information.

Integrated Management Method of Compensation Data for Advanced Compensation Business (보상업무 선진화를 위한 범국가적인 보상자료 통합 관리방안)

  • Seo, Myoung-Bae;Kim, Nam-Gon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.11a
    • /
    • pp.1507-1509
    • /
    • 2011
  • 공익사업 수행시 발생하는 용지보상은 매년 20조원에서 30조원에 이르는 막대한 예산이 투입되고 있는 반면 각종 규정과 업무절차가 복잡하여 업무처리에 많은 인력과 시간이 소요되고 있다. 이에 국토해양부와 같은 중앙부처, 지방자치단체, 도로공사 등 주요 공익사업 사업시행자들은 기관별로 별도의 보상시스템을 구축하고 있다. 하지만 교육과학부, 국방부 등 보상시스템을 사용하지 않는 중앙부처가 대부분이고 기 개발되어 있더라도 시스템 활용도가 낮아 보상시스템을 활용한 보상통계자료의 작성 등이 어려워 매년 국가가 취득하는 공공용지 취득실적 및 규모 등을 파악하기가 어려운 실정이다. 또한 회계시스템과 연계가 되어 있지 않은 시스템이 많아 정확한 보상비 집행실적 추적이 어려워 과세자료 누락으로 인한 세금 누수가 발생하고 있다. 더불어, 과다보상비 책정 및 지급시 이를 체계적으로 추적할 수 있는 전산자료 부재 등으로 보상비 집행의 투명성이 저하될 소지가 있다. 이에 중앙부처, 지방자치단체 및 공공기관별로 용지보상시스템 사용현황을 파악하고 이들을 근간으로 범국가적으로 보상업무를 선진화 할 수 있는 보상자료 통합 관리방안을 제시하고자 한다.

A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis (실적자료 분석에 의한 적정 공사비 산정방법의 전산화 알고리즘 구축에 관한 연구)

  • Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.192-200
    • /
    • 2003
  • The object of this research is to develop a computerized algorithm of cost estimation method to forecast the total construction cost in the bidding stage by the historical and elemental work cost data. Traditional cost models to prepare Bill of Quantities in the korea construction industry since 1970 are not helpful to forecast the project total cost in the bidding stage because the BOQ is always constant data according to the design factors of a particular project. On the contrary, statistical models can provide cost quicker and more reliable than traditional ones if the collected cost data are sufficient enough to analyze the trends of the variables. The estimation system considers non-deterministic methods which referred to as the 'Monte Carlo simulation. The method interprets cost data to generate a probabilistic distribution for total costs from the deficient elemental experience cost distribution.

Application of KModSim Model with Reservoir Operation Rules in Geum River Basin (저수지 운영율을 반영한 KModSim 모형의 금강유역 적용)

  • Cheong, Tae-Sung;Kang, Shin-Uk;Ko, Ick-Hwan;Hwang, Man-Ha
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1364-1368
    • /
    • 2008
  • 우리나라의 한강, 낙동강, 금강, 섬진강, 그리고 영산강 유역에는 하나 이상의 저수지가 포함되어 있어 유역통합관리를 위한 의사결정지원시스템에 있어 저수지 운영기술은 필수적인 항목 중 하나이다. 반면, 적정한 저수지 운영율이 확립되어 있지 않아 저수지 운영을 고려한 유역통합관리에 어려움이 있으며, 저수지 운영율을 통합관리시스템에 적용하기 위한 적용방법 또한 확립되어 있지 않은 형편이므로 이에 대한 방안이 필요하다. 본 연구에서는 실적자료를 이용하여 금강유역의 용담댐과 대청댐 운영율을 구하고 수문학적상태를 이용하여 운영율을 적용방법을 제안하였다. 운영율을 구하기 위하여 금강유역에서 25년간의 일단위 유량자료와 저수지 운영자료를 수집하였으며, 수집된 자료를 토대로 실제 운영에 기반한 운영율을 개발하였다. 기존에 개발 검증된 금강유역의 네트워크 시스템에 개발된 운영율을 적용하기 위하여 수문학적상태를 사용하며 그 결과를 조절점의 실측유량 및 실적저수위, SSDP 저수위, SSDP-CoMOM 저수위를 사용한 명시적인 저수지 운영결과와 비교함으로써 개발된 운영율의 적용성을 검토하였다.

  • PDF