Development of Monitoring System for Safety Operation of Crane (크레인 안전 운전을 위한 모니터링 시스템 개발)

  • Bae, Young-Chul
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.9 no.11
    • /
    • pp.1305-1310
    • /
    • 2014
  • In this paper, the new integrated crane monitoring system that complemented the point at issue for existing crane monitoring system is implemented. The Implementing monitoring system based on wireless communication system, consist of a measuring system of total load currents of main circuit breaker, a temperature and vibration measuring system with temperature sensors and vibration sensors for monitoring an oil and bearing of a main decelerator, a temperature measuring system with temperature sensors of a main motor bearing, and sensors for fire monitoring of an entire electrical space. The measured data from these sensors transmit main controller which is located in external location. Then the Integrating monitoring system is implemented and is performed the performance test to performing diagnosis of motors of a crane.

The Development of An Improved Distribution Automation System Including Low Voltage Monitoring Function (저압 배전망 감시기능을 포함하는 개선된 배전자동화시스템 개발)

  • Shin, Chang-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.5
    • /
    • pp.1034-1041
    • /
    • 2007
  • This paper presents the developing results of improved distribution automation system including system configuration and subsystem design, prototype hardware and software implementation, and pilot tests on the real distribution networks of Korea Electric Power Corporation (KEPCO). An integrated system is designed to combine independent system for the distribution field works with DAS; transformer monitoring, power quality monitoring, voltage monitoring, outage monitoring, etc. The communication network is hierarchically configured as main network and branch network and well-defined integrated terminal units were developed. In addition, useful host configuration and applications were developed to integrate the services with DAS or interfacing other systems. Pilot tests were performed to verify that the system enables to properly integrate the DAS and other services of the distribution network.

  • PDF

Digital immediate implantation and aesthetic immediate loading on maxillary incisor displaced due to root fracture: a case report (치근파절로 변위된 상악 중절치의 디지털을 이용한 즉시 임플란트 식립 및 심미 수복 증례)

  • Jieun Song;Songyi Park;Chan Park;Kwidug Yun;Hyun-Pil Lim;Sangwon Park
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.39 no.4
    • /
    • pp.267-275
    • /
    • 2023
  • To obtain better esthetic results when immediately placing a dental implant, the soft tissue surrounding the implant must be conditioned during healing of the extraction socket. To this end, the emergence profile can be customized through immediate restoration of the provisional prosthesis, and good clinical results can be obtained at the time of definitive restoration in the future, resulting in high patient satisfaction. In this case, horizontal root fracture occurred after trauma to both maxillary central incisors. Immediate implant placement and loading was planned considering aesthetics and alveolar bone condition. By taking an impression using a digital intraoral scanner, a digital diagnostic wax-up was performed to make a more aesthetic prosthesis without applying external force to the traumatized teeth. Based on this, the ideal placement location was determined and immediate implant placement was performed using a 3D printed surgical guide. The provisional prosthesis was restored 5 days after placement, and the definitive zirconia crown was restored through soft tissue conditioning and customization using the shape of the provisional prosthesis for 3 months.

A study on unbalanced load characteristics evaluation of 22.9kV HTS Cable (22.9 kV 초전도케이블 불평형 부하특성 평가 시험 연구1)

  • Choi, H.O.;Ryoo, H.S.;Sohn, S.H.;Lim, J.H.;Hwang, S.D.
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.06a
    • /
    • pp.341-341
    • /
    • 2009
  • 초전도 케이블의 대용량 전력수송능력을 실계통에 적용하기 위해서는 정상상태 뿐 아니라 계통운용상 발생하는 비정상 상태에 대해서도 안정된 성능을 나타내야 한다. 계통운영시 가장 일반적으로 발생하는 비정상 상태의 하나인 계통불평형부하 상태에서의 초전도 케이블의 특성을 실증적으로 확인하기 위해 한전 고창전력시험센터에서 신뢰성시험을 실시하였다. 삼상 송전계통에서 각 상 도체전류는 각 상의 부하량에 의해 결정이 되므로 과도상태라 해도 상당한 시간동안 도체전류가 불평형일 경우 자기적으로 결합된 차폐층전류의 불평형상태가 발생한다. 차폐층전류는 삼상 순환회로의 중성도체가 존재하지 않는 경우 도체전류와의 차이가 발생하게 되어 자기차폐 실패의 원인이 됨으로서 AC손실 증가요인으로서 영향이 커진다. 본 논문에서는 도체전류의 불평형 상태를 실증적으로 모의 발생시켜 연관된 차폐층 순환전류의 형태 및 특성을 검토함으로서 삼상 초전도 케이블의 불평형 부하특성에 대한 연구 진행경과를 요약한다.

  • PDF

Influence Analysis of Grid Connected Wind Power Generator by Line Constants (풍력발전 계통연계시 선로정수에 따른 계통 영향 분석)

  • Choy, Young-Do;Kwak, No-Hong;Jeon, Young-Soo;Jeon, Dong-Hoon;Han, Byung-Moon;Yun, Dong-Jin
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.249-250
    • /
    • 2008
  • 본 논문은 고창 전력품질 실증시험장에서 실 계통 연계를 위해 시험 중인 1.5M급 풍력발전 시뮬레이터의 선로정수를 PSCAD/EMTDC를 이용하여 모의하고 선로정수에 따른 풍력발전시스템이 계통에 미치는 영향을 분석하는데 중점을 두었다. 현재 고창에 설치되어있는 전력품질 실증시험장은 22.9kV 급전선에 SSTS(Synchronous Static Transfer Switch)의 한쪽 스위치로 직접 연결되어있으며 다른 한 쪽은 전력계통에서 발생되는 다양한 형태의 이벤트를 발생시키는 SSHG(Sag Swell Harmonics Generator)를 통하여 연결되어있다. 전력품질 향상기기중 하나인 DVR(Dynamic Voltage Restorer)는 SSTS의 부하쪽으로 직렬로 연결되어있으며 delta-wye 변압기를 통해 정류기 부하와 APF(Active Power Filter), 그리고 순저항부하와 유도성부하가 연결되어 있고 또한 SSHG를 통하여 연결된 배전선에는 DSTATCOM(Distribution Static Compensator)가 병렬로 연결되어있다. 본 논문에서는 고창에 있는 풍력발전 시뮬레이터와 동일하게 PSCAD/EMTDC로 구성하였으며 선로정수를 모델링 하기 위해 선로모델을 10Km, 20Km, 30Km, 40Km,로 설정하여 선로정수에 따른 계통영향을 분석하여 풍력발전 시뮬레이터에서 모의가능 한 선로정수 값을 제시한다.

  • PDF

Current Control of 12-pulse Dual Converter for High Current Coil Power Supply (대전류 코일 전원 공급장치를 위한 12펄스 듀얼 컨버터의 전류제어)

  • 송승호
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.7 no.4
    • /
    • pp.332-338
    • /
    • 2002
  • High current coil power supply for superconductivity coil of tokamak requires fast dynamics performance of di/dt and smooth change over of current direction. To meet the specification high performance DSP-based controller Is designed for 12-pulse thyristor dual converter with interphase transformer(IPT). Not only the total current of Y and $\Delta$ converter units but also the difference for those should be regulated fast and accurately. Proportional and integral controller is designed for current difference control and the controller output is compensated to $\Delta$ converter. The source voltage phase angle detection and gate pulse generation algorithm are implemented in software for higher reliability of current control. The current error Is reduced by selection of appropriate initial gating angle during the transient of change over of current direction between thyristor converters.

Gear Rating and Contact Pattern Analysis for Rotavator Gearbox Using Actual Working Load (실 작업 부하를 이용한 로타베이터 기어박스의 강도 평가와 치면 접촉 패턴 해석)

  • Kim, Jeong-Gil;Cho, Seung-Je;Lee, Dong-Keun;Oh, Joo-Young;Shin, Min-Seok;Park, Young-Jun
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.20 no.6
    • /
    • pp.92-99
    • /
    • 2021
  • The rotavator is attached to the three-point hitch at the rear of a tractor and uses the power take-off strength of the tractor to perform soil harrowing. During operation, the power transmitted to the gearbox of the rotavator varies with the soil characteristics and depth. These properties influence the reliability of the gearbox. In this study, actual load measurements and analyses were performed using a rotavator. In addition, the safety factor and fatigue life of the gearbox components were determined using the analysis results. Through analysis and tests, the contact pattern of the gear tooth surface was identified. The input power values of the gearbox were minimum and maximum at 54.5% and 84.5% of the tractor power, respectively. Based on the actual load analysis results, the strength and fatigue life of the gearbox components were satisfied. In addition, through the analysis and testing of the gear contact pattern, it was confirmed that a similar contact occurred. Through the analysis, the magnitude of the load acting on the tooth surface of the gear was confirmed.

A Study on the Evacuation Model Considering Occupancy Load in Child Care Center with Disabilities (장애아전문 어린이집 재실자 피난 부하를 고려한 피난 모델 연구)

  • Lee, Jeong-Soo;Oh, Young-Sook;Kwon, Yong-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.553-561
    • /
    • 2021
  • The purposes of this study are to propose evacuation recommendations through evacuation model considering occupancy load model in child care center with disabilities. To achieve these purposes, the survey on the occupancy load and egress model and evacuation experiments have carried out, and evacuation occupancy load model for child care center with disabilities are suggested. The results of this study are as follows : (1) The evacuation plan for children with disabilities are necessary special considerations according the type and levels of disability, and various egress means and method for children in child care center with disabilities conditions. (2) The evacuation occupancy loads are different with non-impaired children and evacuation occupancy loads and evacuation corridors width are necessary considering impaired children's evacuation behaviors. (3) The temporal evacuation area(refuge area) is essential for children with disability who are impossible vertical evacuation such as impaired children using wheelchair and cerebral palsy.

특집(스마트 그리드의 발전방향) - 신 에너지전원이 연계된 배전계통의 양방향 보호협조 방안에 관한 연구

  • No, Dae-Seok
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • s.393
    • /
    • pp.51-57
    • /
    • 2009
  • 최근, 국가적인 차원에서 추진되고 있는 풍력발전, 태양광발전 등과 같은 신 에너지전원(분산전원)은 기존의 전원에 비하여 소규모 전원인 관계로 주로 수용가에 가까운 배전계통에 도입되어지고 있으며, 그 특성상 배전계통과 연계하여 운전함으로써 보다 안정된 전력의 확보 및 전력설비의 효율적인 활용, 자원의 효율적인 이용 등의 이점을 얻을 수 있다. 한편, 태양광과 풍력 등의 자연에너지를 이용한 분산전원은 일정한 출력을 내는 기존의 전원보다 기후나 온도, 지형적인 영향을 많이 받는 간헐적인 전원이의로, 이들이 도입된 배전계통은 기존의 단 방향 공급형태의 배전계통과는 달리 부하와 전원이 혼재되어 운용되는 형태로 된다. 분산전원이 연계된 배전계통의 경우에는 분산전원의 출력 용량 여부에 따라 양방향의 전력조류가 발생할 가능성이 있어, 계통운용상 여러 가지 문제점이 야기될 수 있다. 따라서 본 연구에서는 분산전원 연계에 따른 보호협조 기본 방안과 부하절체 운전과 변압기결선에 따른 보호협조 방안 등에 대한 알고리즘을 제시하였다. 또한, 이론적인 계산법(대칭좌표법)에 의하여 실 계통에서의 양방향 보호협조에 관련된 문제점을 분석하고, 해결방안을 제시하였다.

  • PDF

Enclosure Circulating Current due to Grounding and Load Unbalance in GIL(Gas Insulated Transmission Lines) (345kV GIL 계통에서 접지방식 및 부하 불평형에 따른 외함 순환전류 검토)

  • Jang, Tae-In;Park, Hung-Sok;Kang, Ji-Won;Choi, Kyung-Kyu
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.189-190
    • /
    • 2008
  • 최근 국내에서 345kV GIL(Gas Insulated Transmission Lines) 시스템의 실계통 도입이 검토되고 있다. GIL은 지중화 설치가 가능하지만 일반적인 지중케이블과 달리 도체와 외함이 모두 알루미늄으로 되어 있고, 도체 및 외함의 단면적이 매우 크며, 도체전류의 정격 또한 4000[A]에 육박하여 외한에 유기되는 순환전류 역시 상당할 것으로 사료된다. 또한, 접지방식 또한 일반 케이블 시스템과 다르게 되어 있다. 따라서, 본 논문에서는 GIL 시스템의 다양한 접지방식과 부하 불평형 상태를 가정하여 EMTP/ATP 시뮬레이션을 통하여 GIL 시스템의 외함 순환전류 특성을 파악하고자 한다.

  • PDF