• Title/Summary/Keyword: 실무자 BIM 교육

Search Result 5, Processing Time 0.022 seconds

A Survey on the BIM Education Status for Activating BIM Tool Instruction on School Building Construction (학교건축물 BIM 도입활성화를 위한 BIM 교육실태 조사연구)

  • Seo, Deok-Seok;Won, Ho-Sik
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.12 no.2
    • /
    • pp.53-60
    • /
    • 2013
  • BIM(Building Information Modeling) is an indispensable tool to secure global competitiveness in construction sector, as already adapted significantly in European countries and U.S. In particular, as considering School Buildings constructed by BTL Method, using BIM tools are required for the accurate estimation of construction cost in planning stage, exact design and construction, well-judged settlement and performance of maintenance schedule. Therefore, this study investigates the BIM education status and the problems on using BIM tools through a survey of 100 BIM trainees and suggests improvement method of BIM education.

The Current Status and Facilitation Strategy of BIM for Civil Infrastructure Projects (토목공사의 BIM 현황 및 활성화에 관한 연구)

  • Park, Tae-Soon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.1
    • /
    • pp.133-140
    • /
    • 2018
  • The purpose of this paper is to provide baseline on the current status and the activation of BIM in civil engineering which can integrate and manage the information and tasks generated during the life cycle. Hierarchical analysis was conducted to identify the level of BIM application, recognition survey for practitioners, and activation plans. The survey results show similar trends in BIM activation inhibition factor, the need for BIM, the effect of BIM and the future possibility of BIM. The utilization of BIM and the technical training in the civil engineering field were lower than those in the architectural field. The analysis of AHP(Analytic Hierarchy Process) is performed to identify the degree of importance in financial, operational, investment, technical, and institutional sections as its activating factors. As a result, the technical factor points the highest degree. Thus, study shows the direction to apply BIM in civil engineering in the future by suggesting an efficient plan.

The Analysis of Job Stress of Workers in the Architectural Design Firm After the Introduction of BIM (BIM 도입 후 설계사무소 실무자들의 직무스트레스 분석)

  • Seo, Hee-Chang;Oh, Jung-Keun;Kim, Jea-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.120-131
    • /
    • 2012
  • Today, companies exist amid unlimited competition and uncertain adminstration environment, so hands-on workers are being exposed to various job requirements and stress due to this. Especially, employees in the design firm are physically difficult because of heavy working intensity unlike other industrial field, and because the process is interrelated unlike working of a five-day workday of the other industry, it is difficult to guarantee periodic holidays and vacation. In addition, recently, while BIM is introduced in the construction industry, various changes in the individual role as well as organizational dimension such as business environment and scope & role, etc. are required, so it is the actual situation that the category and factors of job stress due to this are being also changed. Accordingly, this research has grasped important and weak sectors according to characteristics such as career, position, gender, education and existence/nonexistence of BIM template, etc. by confirming a job stress level and inducing factors of hands-on workers at the design firm. This research has a meaning in constructing a business environment of a design firm that is a main participant of BIM-based projects that are expected to have high utilization in the future.

A Study on Setting Up Work Conditions for Improving Productiviyt of BIM-based Cost Estimation (BIM 견적 작업 생산성 향상을 위한 업무 환경 조성에 관한 연구)

  • Kim, Seong-Ah;Park, Gweon;Song, Byeong-Seob;Choi, Chel-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.56-65
    • /
    • 2016
  • Many cases have mentioned the effect by applying BIM on the media such as at conferences, workshops, reports, ect. These cases reported that costs could be saved directly by prevention the need to re-do and reconstruct caused by using BIM. BIM users mentioned that using BIM has potential value in saving costs. The benefits of the BIM include intangible value that cannot be estimated in costs, such as reducing work time and improving productivity. However, the financial value of using BIM, such as Return on Investment, has not yet been exposed, and BIM users have a negative view of the financial value of BIM in Korea. Therefore, this study has researched the effects of applying BIM on construction estimate services in view of business productivity, not finance. This study compared the traditional and BIM based estimation, and verified the effect of estimating BIM through work sampling. This study investigated a precondition for getting the effects of BIM based estimation. The results show a need for BIM education, 3D Modeling standards, and database on quantity in order to improve product ivity and reduce work time on BIM based estimation

A Planning Framework of BIM-based Work-Type Packaging for Educational Facility Maintenance (교육시설 유지관리 BIM 기반 공종 패키지 플래닝 프레임워크)

  • Bae, Chang-Joon;Park, Sang-Hun;Yoon, Sun-Jae;Lee, Mi-Young;Koo, Kyo-jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.200-210
    • /
    • 2020
  • The maintenance of educational facilities was assembled in 12 project classifications of the Educational Improvement Program. The priorities were decided by the evaluation scores derived from the condition investigation, and maintenance works were budgeted in the order of priorities. These priorities were a schedule for conducting maintenance and an important criterion for obtaining a construction order. Several restrictions in the condition investigation exist, which derives budgets and conducts maintenance separately based on the priorities. An educational facility manager has a restriction in quantity take-off, which results in an incorrect budget. Discomfort would occur in an educational environment, and a period of infringing safety would increase. This study proposes applying a BIM in the condition investigation and the planning framework for work-type packaging. A BIM supports a budget calculation and derives evaluation scores by linking a repair and an inspection result. The work-type packaging algorithm divides a budget allocation range and derives the result of a grouped work-types applied in an equivalent space and element. As a result of applying cases, it could shorten the duration by approximately 37.4%. Its usability in selecting a grouped work-type was evaluated through an assessment with workers.