A Case Study on Application and Standardization of Safety Adminstration Model in Complex Style Multiflex Housing Business. (단지형 다세대주택신축사업의 안전경영모델 표준화 및 적용사례 연구)

  • Kim, Sung Soo;Yoo, Tae Gyeong;Yoo, Jin Yeol;Lee, Tae Sik
    • Journal of Korean Society of Disaster and Security
    • /
    • v.9 no.2
    • /
    • pp.43-52
    • /
    • 2016
  • Notwithstanding industrial accident decrease generally, Construction industry is on the rise recently. Most accident occurs in the small scale like as multiflex housing, remodeling, neighbourhood facility more than safety supervisor appointed large scale construction site. By the size of business place, 81.6% of total accident occurs mostly in small scale site that is bellow 120 billion won and 50 manpower. This paper aimed that small scale housing company achieve a zero hazard practising and understanding the safety adminstration standar d model easily and it applied firstly after investigating the operation condition of construction site safety control in small scale company propelling the complex style multiflex housing business.

A Study on the Development of a Dry PFB Method with High Fire Resistance (건식화 P0SCO E&C Fire Board (PFB)공법 개발에 관한 연구)

  • Kim, Woo-Jae
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.953-956
    • /
    • 2008
  • The present study was to develop a dry PFB method similar to the existing gypsum board construction method in order to apply the existing wet PFB method that uses fire.resistant adhesive. It was found that the existing wet method can produce concrete compressive strength of 80MPa and fire resistance of 3 hours with 30mm PF boards. The goal of development in this study was fire resistance of 3 hours through dry construction of 15mm fire.resistant boards.According to the results of fire resistance test, when the dry PF method was applied, the temperature of the main reinforcing bar was 116$^{\circ}$C in 15mm, 103.8$^{\circ}$C in 20mm, and 94$^{\circ}$C in 25mm, and these results satisfied the current standards for fire resistance control presented by the Ministry of Land, Transport and Maritime Affairs. When a 3.hour fire resistance test was performed and the external properties of the specimen were examined, the outermost gypsum board hardly remained and internal PF board maintained its form without thermal strain.

  • PDF

Estimating Construction Cost for Small-Sized Apartment Unit (소형공동주택의 적정건축비 추정방안 연구)

  • Lee, Yoo-Seob;Kang, Tae-Kyung;Cho, Hun-Hee;Huh, Young-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.94-104
    • /
    • 2006
  • The changed Korean government law associated with the public apartment housing supply, so called the $^{\circ}{\AE}$Apartment Sales Price $Cap^{\circ}{\phi}$, requires new system for estimating construction cost in order to set appropriate price. A model apartment project was carefully designed and its construction cost were analyzed in many different ways. Based on the analyses outcomes, 1,028,000 Won/m2 (excluding cost for underground parking lot) is the most appropriate Price Cap for a smaller than $85{\beta}{\geq}$ apartment unit. Further, it was revealed that the price have to be adjusted reflecting such factors as underground size; structural system; external complex quality; and consumer preferences. Findings from this study will enable the Korean government to realize faster and better application of the related laws. The methodology for obtaining appropriate apartment construction cost will also benefit for future researchers.

A study on methods to reduce environmental load due to stone development- Focusing on Pocheon Art Valley - (건축용 석재개발에 따른 환경 부하 저감 방안에 관한 연구 - 포천 아트밸리를 중심으로 -)

  • Myong-Suk Suhr
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.1
    • /
    • pp.711-716
    • /
    • 2023
  • A large amount of stone is required as a high-end strategy for building new construction and remodeling work, and aggregates have to be collected from many stone mountains due to the lack of river sand and gravel required for concrete production. This study examines the case of development of stone materials for construction, conduct and analyze residents' attitudes, find out residents' thoughts on stone mountain development, develops the area as an alternative to the devastation caused by stone mountain development, and recycles it as an efficient resource. We intend to conduct basic research to propose a plan. As a result, Local residents have a lot of antipathy against the use of quarry, so it is necessary to use the area that is far from the residents' areas as a quarry. It was concluded that it was desirable to restore and develop in the right direction.

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

Study on the Evaluation of End Bearing Capacity of Pre-Bored Piles for the SPT-N value (SPT-N값에 따른 매입말뚝의 선단지지력 특성 연구)

  • Seo, Dong-Nam;Choi, Sang-Ho;Kim, Jin-Sik;Kim, Seong-Cheol;Lee, Dong-Hyeon;Cho, Seong-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.133-134
    • /
    • 2020
  • The equation of end bearing capacity is applied differently depending on the type of pile, construction method, and load characteristics considering the construction standards. The bearing capacity equation of the design standard is presented in various ways according to the design conditions such as construction method and ground condition, etc. but, It does not reflect the ground strength according to the SPT-N value of weathered rock. This study analyzed the trend of allowable tip bearing capacity by pile diameter through about 480 dynamic loading tests conducted for the construction/quality management of piles for the last 6 years since 2015. The equation for the ultimate end bearing capacity per unit area according to the SPT-N value is presented. The proposed formula of ultimate end bearing capacity per unit area can be applied in the range of 15,000kN/m2 to 30,000kN/m2. The proposed formula, which complements the existing formula, enables pile design and construction/quality management.

  • PDF

Evaluation of Structural Stability of Tunnel due to Adjacent Excavation on Urban Transit (도시철도 인접굴착공사에 따른 터널구조물의 구조 안정성 평가)

  • Choi, Jung-Youl;Lee, Ho-hyun;Kang, You-Song;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.503-508
    • /
    • 2020
  • The three-dimensional precision numerical analysis was performed using the finite element model applied with the railway track model consisting of rails, As a result of analyzing the track deformation level of the existing tunnel due to the excavation work adjacent to the urban transit, it was found that the evaluation criteria (allowed values) of conventional railways lines were satisfied. Based on the numerical analysis, it was analyzed that the results of the prediction of the tunnel structural stability of due to the excavation work and the level of the tunnel deformation occurring at the actual site could be approximated as closely as possible.

A Study on Practicalization of Low Vibration New KINRECKER-II (미진동 발파용 New KINECKER-II 실용화에 관한 연구)

  • Jang, Seung-Ho;Park, Hee-Won;Lim, Jung-Hyuk;Lee, Chang-Yeop;Ahn, Bong-Do;Kang, Dae-Woo;Lee, Ha-Young
    • Explosives and Blasting
    • /
    • v.35 no.1
    • /
    • pp.43-52
    • /
    • 2017
  • Mountain and hill areas occupy by more than 70% in South Korea and Rock drilling should be applied in order to reduce noisy & vibration from massive civil engineering business such as road expansion, high-way construction, subway construction and construction of site renovation such as a newly-built & re-development of apartment, newly-built of high-rising building in downtown area. As Blasting noise & vibration such as vibration, noise, fly rock etc caused by blasting operation from large small scale construction occurs, neighboring residents who demand the compensation file a civil complaint so that the business reach a deadlock. As the excavation method for these areas, There are blasting of micro-vibration, mechanical excavation method(Rock splitter, Breaker etc), similar blasting method(plasma, gel fragmentation etc) to date. In this study, we are trying to find the feature & performance which get improved economic feasibility & construct ability through improving sympathetic detonation of New KINECKER-I used in blasting of micro-vibration & formulation and would provide convenience for use by introducing standard blasting pattern & construction method. Also, checked and confirmed all the blasting with connecting cap has been cleary detonated.

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.

Study on Verification of Applicability for a Warehouse Construction Site using a Fire Risk Assessment Tool (화재위험도 평가 Tool에 의한 물류창고 공사장 적용성 검증에 관한 연구)

  • YongGoo Seo;SeHong Min
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.673-688
    • /
    • 2023
  • Purpose: Fires that occur during construction are infrequent, but cause great damage. Recently, with the growth of the logistics and distribution industry, the number of construction sites for new logistics warehouses is increasing, so it was selected as a research subject and research was conducted to reduce accidents at construction sites through the development of a fire risk assessment tool to quantitatively approach fire prevention. Method: A comprehensive fire risk assessment tool was accumulated by classifying the work in progress, classifying combustibles and ignition sources by grade, excluding air (oxygen), which is difficult to control, and additionally substituting evacuation safety. Result: Using the developed and proposed fire risk evaluation tool, excavation work with low fire risk, facility construction with medium fire risk, and finishing work with high fire risk were sampled to derive the result (CGI). Conclusion: In this study, it was possible to establish specific preventive measures and evaluate evacuation safety by controlling physical conditions (combustibles) and energy conditions (ignition sources) according to the risk assessment by developing a tool that can evaluate the risk of 14fire occurrence at construction sites. It is expected that in the future, through the application of the fire risk evaluation tool at construction sites, it will be provided as a criterion for establishing a process plan that can reduce risk and evaluating the adaptability of firefighting equipment.14