• Title/Summary/Keyword: 시공VE

Search Result 85, Processing Time 0.024 seconds

Field Application of Spalling Prevention Method of High Performance Concrete (고성능 콘크리트의 폭렬방지 공법 현장적용 사례)

  • Kim Kyoung-Min;Heo Young-Sun;Lee Jae-Sam;Jee Suk-Won;Lee Seong-Yeun;Han Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.7-10
    • /
    • 2005
  • This paper is about manufacture of spalling resistance concrete and also investigates the spalling mechanism and spalling resistance method with diverse materials, mixture proportion and lateral confinement. The present work with the basic experiment achieved successful method for spatting resistance using both proper amounts of fiber contents and lateral confinement using metal lath. Moreover, the developed spatting resistance method was applied for full sized column construction in the Doosan We've Poseidon I field, located in Busan city. The author investigated the physical properties examining workability, placeability and pumpability. These studies are continuously processing to develop new technology expecting remarkable impact on the spatting resistance and fire resistance performance of high-raise building construction in the future.

  • PDF

A Proposal of Quality Model for Alternative Evaluation of Major Construction Projects (건설공사에서 주요공종 대안평가를 위한 품질모델 제안)

  • Lee, Jong-Min;Seo, Bo-Ram;Son, Hyun-Jeong;Lee, Tae-Shim;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.43-44
    • /
    • 2019
  • Major construction projects will be directly related to construction costs and disclosure period depending on the selection of the construction method. However, there are some sites that choose without taking into account sufficient conditions. Therefore, the company wants to present a quality model that suits the characteristics of major engineering fields.

  • PDF

A Study of cost data modeling for Megaproject (메가프로젝트 원가 자료 분석에 관한 연구)

  • Ji, Seong-Min;Cho, Jae-Kyung;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.253-256
    • /
    • 2009
  • To the success of the megaproject including various and complex facilities, it is needed to establish a database system. Developments in data collection, storage and extracting technology have enabled iPMIS to manage various and complex information about cost and time. Especially, when we consider that both the go and no go decision in feasibility, Cost is an important and clear criteria in megaproject. Thus, Cost data modeling is the basis of the system and is necessary process. This research is focus on the structure and definition about CBS data which is collected from sites. We used four tools which are Function Analysis in VE, Casual loop Diagram in System Dynamics, Decision Tree in Data-mining, and Normalization in SQL to identify its cause and effect relationship on CBS data. Cost data modeling provide iPMIS with helpful guideline.

  • PDF

Properties of the Reaction to Acid Stained Agent and Cement Hydrate (착색용 산화제와 시멘트 수화물의 반응 특성)

  • Park, Hyo-Jin;Sin, Sang-Chul;Hong, Seong-Rok;Choi, Ji-Ho;Jeong, Ji-Yong;Kim, Jin-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.117-118
    • /
    • 2011
  • The acid stained agents are able to make remarkably thin colored layers on concrete surfaces and have simple processes for applying them comparably. This study has examined properties of the reaction to acid stained agent and cement hydrate. We've observed that the C-S-W autoclave cured specimens contain less Calcium Hydroxide than the others and create tobermorite of C-S-H system crystalline and concluded that the reactions of acid stained agent become slowdown under C-S-W and cause light colors of specimens.

  • PDF

A Study on the Selection of High-Risk Construction Types for Safety Management on Construction Projects (건설공사 안전관리를 위한 고위험 공종 선정에 관한 연구)

  • Yang, Jin-Kook;Lee, Ki-Hun;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.137-138
    • /
    • 2022
  • Construction work has potential risk factors in the process. Therefore, the safety management task is very important and requires continuous management. In particular, the importance of safety management in construction projects has been highlighted recently with the introduction of the act on punishment of serious disasters. In this perspective, this study intends to select and present high-risk construction types that requires safety management. The presented result is expected to present standards for systematically performing safety management of construction projects.

  • PDF

Development and application effect analysis of sound insulation materials between floors focusing on maintenance performance (유지관리 성능중심의 층간차음재 개발 및 적용효과 분석)

  • Yang, Jin-Kook;Park, Young-Duk;Kim, Ki-Nam;Lee, Seok-Bong;Yun, Jeong-No
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.63-64
    • /
    • 2022
  • Inter-floor noise in an apartment building is a serious problem that causes conflicts between tenants. Accordingly, there are various attempts to solve this problem, but it is not easy to find a clear solution. Therefore, in this study, a soundproofing material between floors was developed that can improve the sagging that occurs after construction. And as a result of testing the developed interlayer soundproofing material, both light weight and weight were grade 1. And it was analyzed that maintenance performance could be improved with integrated structural characteristics.

  • PDF

Expansion and Remodeling - The Case of Vocational Rehabilitation Center (증축공사에 대한 리모델링 - ○○○직업재활센터의 사례)

  • Chun, Ui-Yeon;Kim, Gyu-Yong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.135-136
    • /
    • 2023
  • The Vocational Rehabilitation Center Expansion Project, with a budget of 15.3 billion KRW, transformed an existing facility into a more eco-friendly, user-friendly, and publicly accessible space. The project involved expanding the building from a basement and two above-ground floors to a basement and six above-ground floors, addressing the shortage of facilities for people with disabilities while promoting eco-friendliness. Design concepts included eco-friendly MASS, improvements to the existing building, social adaptability, and user-centric evacuation measures. Value Engineering (VE) and technical reviews led to proposals for cost reduction and functionality enhancement. Completed in September 2019, the project, renamed "Se-um Center," now hosts seven disability welfare facilities, serving as a vital infrastructure improving the lives of individuals with disabilities in the local community.

  • PDF

A Case Study on Construction Management in Nuritkum Square Project (누리꿈스퀘어 프로젝트의 건설사업관리 사례)

  • Lim, Hyun-Yong;Yoo, Seung-Kon;Seo, Joon-Oh
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.25-31
    • /
    • 2007
  • Nuritkum Square Project is a IT Complex which is being constructed in Digital Media City. The project consists of several buildings and is a Design-build, so that the systematic construction management from design to construction stage is more important for a successful project. This study introduces the practical tasks of construction management during the project and analyze some of main tasks to increase understanding construction management in the design-build project. Based on experience of construction management in this project, we examine managerial problems which frequently occur in this kind of project, and suggest how to improve construction management in Korea.

  • PDF

A Study on the Superstructure System Analysis of Underground Parting Lot in Apartment. (공동주택 지하주차장 상부구조 형식 분석연구)

  • Lim, Nam-Gi;Song, Hee-Won;Lee, Young-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.149-156
    • /
    • 2003
  • The purpose of this study was to find out the most reasonable design in the superstructure of an underground parking lot which needs to be considered with the economic efficiency being influenced on the subdivision price, construction duration, workability and the maintenance of crack and leakage status of apartment house. In this research, we've evaluated the fitness for the superstructure of an underground parking lot by examination of construction constraint, which was based on the calculated data of structural design and quantity survey. The results of this study are summarized as follows. 1. The system of the absent structure of beam is proper structure for economic efficiency, construction duration and workability, but it is disadvantageous at the side of maintenance efficiency because of the many part of large slab. In the opposite direction, the establishing structure of beam has the advantages of structural stability except economic efficiency, construction duration and workability 2. It's required a proper selection for the views being contrary to each other which the owners considers good quality, on the other hand, the contractors consider construction duration and workability. 3. In making a selection for the superstructure of an underground parking lot, we have concluded that it is the most important to choose the proper structure for the demanded performance by contrasting with two system. (2Bay or 3Bay)

Development of Design Support System to Optimize the Temporary Work (강교량 설치 가설공사의 최적화설계 지원시스템 개발)

  • Cho, Hun-Hee;Park, Jae-Woo;Cho, Moon-Young;Kim, Jung-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.115-123
    • /
    • 2005
  • Design of steel $bridge^{\circ}AEs$ temporary works has conducted relying on the experiences of engineers based on the previous similar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actual construction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developed an optimum design support system for temporary works of the steel bridge construction through establishing the database for the materials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the works through the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the design informations at the construction stage.