• Title/Summary/Keyword: 시공 생산성

Search Result 464, Processing Time 0.028 seconds

Productivity Analysis for Strutural Formwork Using 3D BIM (3D BIM을 활용한 골조 거푸집 공사의 생산성 분석에 관한 연구)

  • Choi, Chang-Hoon;Park, Young-Jin;Soh, Ji-Yoon;Kim, Sung-Yeon;Lee, Junbok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.292-300
    • /
    • 2014
  • The construction progress control is very important because there are many unexpected factors affecting time schedule delay and cost overruns. A complicated measure including item quantity and inherent time and costs is used to monitor the progress. Another element to be considered is a productivity, which is cost effectiveness because productivity is primarily measured by the costs. Productivity is stated as constant in-place value divided by inputs such as worker-hour. The main purpose of this paper is to analyze the productivity of structural formwork using a 3D BIM. In order to achieve the research objective, an integrated model of a BIM with a daily foreman's report is developed. The quantities being extracted from a 3D model and information are integrated with manpower utilized. The developed model is applied to a case project to measure and analyze the productivity in terms of individual building and work crew team. The results are discussed and further research topics will be addressed.

The Evaluation of Technology for Temperature Reduction of Mixing & Compaction for Polymer Modified Asphalt (폴리머 개질 아스팔트의 생산 및 시공 온도 저감기술 평가)

  • Jo, Shin-Haeng;Ryu, Ju-Yeol;Lee, Jin-Gu;Kim, Nak-Seok
    • 한국방재학회:학술대회논문집
    • /
    • 2010.02a
    • /
    • pp.46.2-46.2
    • /
    • 2010
  • 아스팔트 포장의 공용성능 행장을 위해 널리 사용되고 있는 폴리머 개질 아스팔트(PMA)는 높은 생산온도와 다짐온도로 인해 생산 시 연료 소비가 많고 시공관리가 어려운 단점을 가지고 있다. 이에 중온형 아스팔트 기술을 접목하여 고온에서의 아스팔트 점도를 낮춤으로써 이와 같은 문제점을 해결하고자 하였다. 바인더의 전반적 공용성능 향상을 위해서 폴리머 (SBR)와 작업성 개선을 위해 Wax 및 기타 첨가제를 혼합하여 아스팔트 바인더를 제조하였으며, 실험결과 PG 82-22의 높은 공용등급의 바인더를 얻었으며, 생산 및 시공온도는 기존의 PMA 아스팔트와 달리 일반 스트레이트아스팔트와 비슷한 수준을 확보하였다. 이를 이용한 아스팔트 혼합물의 공용 성능 면에서도 PMA개질 아스팔트와 비슷한 수준을 나타내었다.

  • PDF

Suggestion improvement measures based on form work productivity analysis in apartment housing construction (공동주택 거푸집공사 작업량 분석에 따른 개선 방안에 대한 연구)

  • Yoon, Ja-Young;Kim, Young-Suk;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.49-56
    • /
    • 2010
  • A competitive construction project must address factors such as cost, performance, aesthetics, schedule and quality. The importance of these factors will vary from project to project and from market to market. Productivity is becoming an ever-more important factor in the acquisition of a project. As the technology or aesthetics of a product matures or stabilizes, and the competitive playing field levels, competition is increasingly based on time. Recently, the construction industry has been depressed due to difficult market circumstances. At this time in particular, construction companies are striving to rationalize their management, both in their planning offices and in the field. In this study, we present a method of calculating a reasonable duration for reinforced form work. We did this by first developing a question for field workers, then sampling form workers based the question. Second, we employed a work analysis method to analyze worker"s work-methods and Time. Then, using the result of this analysis, we measured the Productivity of form work. This measure can be used as basic data to determine the appropriate duration of form work.

The Production Process and Mock-up Test of Freeform Concrete Segments using LOM type 3D Printer (LOM 방식 3D 프린터를 이용한 비정형 콘크리트 부재 생산 프로세스 및 Mock-up test)

  • Lee, Dong-Youn;Lee, Dong-Min;Cho, Hun-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.89-98
    • /
    • 2018
  • Recently, the importance of the construction technology of the free-formed buildings is becoming more significant, as the interest and demand for the free-formed buildings are increasing. However, it takes much time and cost during the construction of free-formed buildings because the current construction technique of freeform concrete segments is manufactured by a formwork. Therefore, in this study, we suggested a new manufacturing process based on the LOM-type 3D printer for freeform concrete segments that can shorten construction time and reduce cost when constructing freeform concrete segments, and we also verified the feasibility of production process through mock-up test. The result shows that the suggested process shortened 47.8% of production time and saved 56.2% of cost compared to the existing steel formwork method. In conclusion, it is expected that the production method of freeform concrete segments using 3D printer will contribute to the improvement of productivity of freeform concrete segments construction and the activation of new construction method for free-formed building construction.

Reinforced-Concrete Works Productivity and Influence Factor Analysis on Nuclear-Power-Plant Project (원자력발전소 건설현장의 철근콘크리트 공종 생산성 및 영향요인 분석)

  • Huh, Young-Ki;Lim, Jin-Ho;Kim, Kyoung-Uk;Ahn, Young-Chul;Oh, Jae-Hun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.314-321
    • /
    • 2014
  • Nuclear power plant projects are being increased all over the world. The construction of nuclear power plants needs huge money and time, which makes conducting a detailed analysis of productivity through the whole process. Reinforced-concrete works productivity field data was collected for more than one year and analyzed from a nuclear-power-plant project in Korea. The productivities of formwork, rebar-work, and concrete pouring were $0.54m^2/man{\cdot}day$, $0.06ton/man{\cdot}day$, $1.98m^3/man{\cdot}day$, respectively. Moreover, it is revealed that 'Day of the Week' is a driver of the formwork activity and 'Overtime' is for all of the three. The results will be a great interest of industry personnel estimating time and cost of a new nuclear power plant.

OLAP and Decision Tree Analysis of Productivity Affected by Construction Duration Impact Factors (공사기간 영향요인에 따른 생산성의 OLAP 분석과 의사결정트리 분석)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.100-107
    • /
    • 2011
  • As construction duration significantly influences the performance and the success of construction projects, it is necessary to appropriately manage the impact factors affecting construction duration. Recently, interest in the construction industry has been rising due to the recent change in the construction legal system, and the competition among the construction companies on construction time. However, the impact factors are extremely diverse. The existing productivity data on impact factors is not sufficient to properly identify the impact factor and measure the productivity from various perspectives, such as subcontractor, time, crew, work and so on. In this respect, a multidimensional analysis by a data warehouse is very helpful in order to view the manner in which productivity is affected by impact factors from various perspectives. Therefore, this research proposes a method that effectively takes the diverse productivity data of impact factors, and generates a multidimensional analysis. Decision tree analysis, a data mining technique, is also applied in this research in order to supply construction managers with appropriate productivity data on impact factors during the construction management process.

A Study on the Productivity of Form Work by using Work Analysis Method (작업측정기법을 이용한 거푸집 공사의 생산성에 관한 연구)

  • Jung, Hea-kyang;Yun, Yer-Wan;Yang, Keek-young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.131-137
    • /
    • 2005
  • Lately Construction industry has been depressing by hard construction market circumstance. Construction company, especial at this time, makes more rationalize the management of inside Company and Construction field. In this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work

Productivity Analysis of Gas Pressure Welding Work Using Web-CYCLONE (웹싸이클론을 이용한 가스압접공사의 생산성 분석에 관한 연구)

  • Gu, Shin-Hyuk;Kim, Yong-Woo;Lee, Dong-Eun;Huh, Young-Ki;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.273-275
    • /
    • 2012
  • In apartment building with column structure, reinforcing bar of the column is constructed mainly using gas pressure welding job. Therefore, gas pressure welding job in very critical process is construction apartment building with column structure. The purpose of this study is to analyze productivity of gas pressure welding work in column structure apartment using Web-CYCLONE. In this study, a CYCLONE model was developed for the productivity analysis of gas pressure welding work. Through this model, the optimal combination of the resources was obtained. This study will be utilized in the future as a useful tool of productivity analysis and the determination of an optimal combination of resources for gas pressure welding in apartment with column structure.

  • PDF

Basic Study on the Measurement of Unit Productivity Data By Image Processing Technology (이미지 프로세싱을 활용한 생산성 정보 측정방안에 관한 연구)

  • Lee, Chan-Kyu;Lee, Seung-Hyun;Son, Jae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.281-282
    • /
    • 2012
  • Construction performance and productivity improvement are key focus areas in construction industry for any nation. There have been frequent delays and cost overruns in construction projects and poor productivity is one of the major contributions. For this reasons, there have been many research studies performed on the improvement of construction productivity for several decades. However, measuring productivity on a construction job site is still not an easy work. Because collecting reliable data consistently from the job site requires a lot of personnel efforts causing extra time and cost. This paper provides a basic study on the application of image processing technology for measuring unit productivity. It presented the possibility of unit productivity measurement by image processing technology through case study.

  • PDF

A Work Process for Productivity Improvement of Concrete Structural Frame Work in Tall Building (초고층 골조공사 생산성 향상을 위한 작업 프로세스 개선)

  • Jang Ji-Sun;Shin Yoon-Seok;Kang Kyoung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.161-164
    • /
    • 2005
  • According to the trend of tail building, it is essential to improve productivity in tall building construction. However, the study on that is insufficient until now. Therefore, the purpose of this study is to propose a new work process of efficient concrete structural fame work to improve productivity in tall building construction. The results of being applied proposed work process are that the 5day cycle time of concrete structural frame work is cut by 0.5day and the quantity of rebar to be demanded in concrete structural frame work is reduced.

  • PDF