• Title/Summary/Keyword: 시공 생산성

Search Result 464, Processing Time 0.024 seconds

A basic study of reinforcement tools development for Productivity Improvement of Composite PC connection work (합성 PC 구조 접합부공사의 생산성 향상을 위한 철근배근 도구 개발 기초연구)

  • Kim, Geun-Ho;Lim, Chae-yeon;Na, Young-Joo;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.339-340
    • /
    • 2012
  • Green frame is combined by structural steel and reinforcements of Green column and beam and unified by cast-in-place concrete. However, when upper reinforcements penetrate structural steel hole, the execution is difficult due to interference of joint and a rib of deformed reinforcements. Therefore, the objective of this study is to propose the reinforcement tools to improve productivity of precast structure connection construction. The reinforcement tools proposed in this study can be helpful to improve constructability, safety, duration, and cost comparing with conventional reinforcement method since unskilled workers can deal with reinforcements easily.

  • PDF

A Study on the Unit Modular System Process Application Plan (모듈러공법의 국내 적용 활성화 방안에 대한 연구)

  • Kim, Do-Min;Lim, Jae-Bok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.113-114
    • /
    • 2012
  • The productivity of the construction industry is lower than other industries. Modular system is suggested to enhance the productivity of the construction industry. Modular system is a construction method which installs units manufactured in factory on site. It enables to reduce the duration and improve the quality of the constructions. However, the construction technique applied to modular system has not overcome certain structural problems. To solve the problems and motivate the application of modular system, this study propose the hybrid system which use core to resist a lateral force.

  • PDF

Productivity Improvement Method of Wall Rebar Work in Apartment House Construction (공동주택 벽 철근 조립 생산성 향상 방안에 관한 연구)

  • Kim, Min-Kyu;Kim, Young-Kil;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.159-160
    • /
    • 2019
  • Reinforced concrete construction is one of the labor intensive construction projects and its productivity is very low. It is necessary to increase the productivity of rebar construction for improving the productivity of construction work. Therefore, in this study, the rebar drawings of apartment buildings are analyzed to prefabricate wall rebar unit shaped mesh in the factory and installing it on site. If the proposed wall rebar unit is applied to apartment construction working time of wall rebar can be reduced by 50% or more.

  • PDF

Development of Eco-Friendly Light Weight Form for Increased Formwork Productivity (거푸집공사의 생산성 향상을 위한 친환경 경량 거푸집 개발)

  • Ahn, Hee-Jae;Lee, Dong-Min;Lee, Dong-Youn;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.8-9
    • /
    • 2019
  • Euro forms and aluminum forms, which are currently used in formwork construction sites are limited by their heavy weight and the use of environmentally hazardous form oils. Therefore, in this study, 'eco-friendly light weight form' was developed, which does not require form oils during the removal process of form. In addition, the superiority of the developed form was verified by comparison with Euro forms and aluminum forms in terms of noise generation and weight. Application of the eco-friendly light weight form in construction sites is expected to reduce the noise level, and increase workers' convenience. The productivity of formwork is also increased.

  • PDF

Optimum Layout Model of Lift Car for Improving Productivity in High-rise Building Exterior Finishing Work (마감공사 생산성 향상을 위한 리프트 카 최적배치 모델)

  • Lee, Dongmin;Lim, Hyunsu;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.171-172
    • /
    • 2013
  • An operation planning of lift car is crucial in tall building construction especially it's arrangement plans, because it is related with transportation distance of finishing materials affecting construction productivity. Since tall building construction, composed of complicating and huge plane have complex traffic lines of finishing materials, to determine the position of lift car empirically or intuitively has limits. Therefore this paper suggest an optimum layout model of lift car minimizing the transportation distance both at site-level and floor-level using Graph theory and Dijkstra algorithm.

  • PDF

A Study on the Hindrance Factors of the Productivity in Design VE Phase (설계 VE단계에서 발생하는 생산성 저해요소 분석 - '00공사 사옥 신축공사' 사례를 중심으로 -)

  • Choi, Ji-Hye;Sang, Jun;Kim, Ban-Seok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.178-179
    • /
    • 2013
  • After the introduction of the design VE system in 1990s, based on the legal system has made a rapid growth. Also It is evaluated as qualitative growth. Despite this growth, VE effort can cause the occurrence of the risk. In this paper carried out to hindrance factor that decrease the productivity in VE phase for strategy to improve the utilization of basic data.

  • PDF

Integrating Order Process in Residential Building Construction (주거시설공사의 하도급 통합발주 프로세스 개발)

  • Kim, Yongl-Won;Park, Hyung-Jin;Jung, Jin-Hyun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.84-85
    • /
    • 2013
  • Integrating multi-trade works system helps to reduce to minimize the conflict of subcontract business and improve communication to increase productivity of construction. However it takes such a big risk if subcontract of integrating multi-trade works went bankrupt during the project so some of construction companies executed to only small project and it's not sufficient to adopt overall project. This paper suggested the improvement scheme of work classification integrating multi-trade works, which takes a consideration into work zoning in order to apply current work situation.

  • PDF

Productivity management methodology development using Bayesian Approach (베이시안 접근법을 이용한 생산성 관리 방안 제시)

  • Ko, Yong-Ho;Lee, Tae-Hee;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.21-22
    • /
    • 2013
  • Construction industry has become higher, larger and more complicated. Construction projects demand precise planning and management prior and during actual operation. However, it has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly that usually results in unreliable results. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to suggest quantitative results. It has been analyzed that many studies have focused on limited data only and neglected suggesting an appropriate methodology for changing data applications. Therefore, this study suggests a methodology that effectively manages construction productivity by applying bayesian approach focusing on the high-rise curtain wall operations.

  • PDF

Database establishment method for process scheduling by means of simulation (시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론)

  • Ko, Yong-Ho;Noh, Jae-Yun;Ngov, Kheang;Shin, Do-Hyoung;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

Classifying Management Tasks to Improve PC Construction Management System (PC공사 관리체계 개선을 위한 주요 관리업무 분류)

  • Mun, Seong-Hwan;Kim, Taehoon;Cho, Kyuman
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.177-178
    • /
    • 2020
  • In the construction industry, expectations for the Precast Concrete(PC) construction method are rising due to demands for high quality and productivity and social and environmental issues. However, although technical problems that occurred in the early stages of technology introduction have been solved, research related to proper construction management for PC construction methods has been relatively neglected and the advantages of PC construction methods have not been fully utilized. In this study, each group involved in PC works was surveyed to identify important management tasks affecting productivity of PC works to improve PC contruction management system. Based on factor analysis, 22 tasks were calssified into 5 management groups. The results of this study will be used to present a framework for the application of automation and information technology to improve the productivity of PC works.

  • PDF