• Title/Summary/Keyword: 시공 단계

Search Result 1,343, Processing Time 0.029 seconds

Assessment for Extending Span Ranges of PSC Girder Bridges : I. Proposed Strategy to Estimate the Spans (PSC 거더교의 장경간화 평가 기법 : I. 경간 평가 기법의 제안)

  • Jeon, Se Jin;Choi, Myoung Sung;Kim, Young Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3A
    • /
    • pp.235-241
    • /
    • 2009
  • PSC girder bridge is known to be more economical than other types of bridges and has been usually applied to a span range of 25 m to 35 m according to the standard shapes for highway bridges in Korea. The spans of the recently developed new types of PSC girders are also limited to 50 m at most. In this study, therefore, feasibility of the long-span PSC girder that reaches more than 50 m is investigated by applying several strategies from the perspectives of materials, design and construction. A systematic procedure is proposed that can be used to assess the effect of each strategy on the span. The proposed scheme adopts a graphical approach that represents a relationship between the number of prestressing tendons and the span, and is derived on a basis of safety assessment equations of the girder in each stage of fabrication and in service. In the companion paper, the amount of span extension is quantitatively evaluated by applying the proposed scheme into a sample PSC girder bridge.

Stability Assessment of Tunnel Excavation Face Utilizing Characteristics of Collapse Cases (터널 시공현장 붕괴 사례를 이용한 막장의 안정성 평가 연구)

  • Kim, Mintae
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.2
    • /
    • pp.55-64
    • /
    • 2024
  • While shield tunneling has demonstrated stability in international cases, the new Austrian tunneling method (NATM) encounters challenges in urban environments with shallow cover, weathered ground, and high groundwater levels. This paper introduces two typical collapse scenarios observed in urban areas, specifically within weathered bedrock and uncemented sandy soil layers. The collapses are analyzed using six stability evaluation methods, and the results are synthesized to assess the excavation face stability through a hexagonal diagram. The study finds a consistent agreement between the analysis results of the two collapsed tunnel sites and the evaluation outcomes. The employment of the stability evaluation diagram, a comprehensive method that considers the ground characteristics of the target tunnel, proves crucial for ensuring barrier stability during the tunnel design stage. This method is essential for a holistic evaluation, especially when addressing challenging ground conditions in urban settings.

A study on the optimization of tunnel support patterns using ANN and SVR algorithms (ANN 및 SVR 알고리즘을 활용한 최적 터널지보패턴 선정에 관한 연구)

  • Lee, Je-Kyum;Kim, YangKyun;Lee, Sean Seungwon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.617-628
    • /
    • 2022
  • A ground support pattern should be designed by properly integrating various support materials in accordance with the rock mass grade when constructing a tunnel, and a technical decision must be made in this process by professionals with vast construction experiences. However, designing supports at the early stage of tunnel design, such as feasibility study or basic design, may be very challenging due to the short timeline, insufficient budget, and deficiency of field data. Meanwhile, the design of the support pattern can be performed more quickly and reliably by utilizing the machine learning technique and the accumulated design data with the rapid increase in tunnel construction in South Korea. Therefore, in this study, the design data and ground exploration data of 48 road tunnels in South Korea were inspected, and data about 19 items, including eight input items (rock type, resistivity, depth, tunnel length, safety index by tunnel length, safety index by rick index, tunnel type, tunnel area) and 11 output items (rock mass grade, two items for shotcrete, three items for rock bolt, three items for steel support, two items for concrete lining), were collected to automatically determine the rock mass class and the support pattern. Three machine learning models (S1, A1, A2) were developed using two machine learning algorithms (SVR, ANN) and organized data. As a result, the A2 model, which applied different loss functions according to the output data format, showed the best performance. This study confirms the potential of support pattern design using machine learning, and it is expected that it will be able to improve the design model by continuously using the model in the actual design, compensating for its shortcomings, and improving its usability.

Proposed Sustainability Risk Framework through the Analysis of Advanced Donor Countries' International Development Cases (선진 공여국의 국제개발 사례 분석 기반 지속가능성 리스크 프레임워크 제안)

  • Lee, Kyung-Tae;Kim, Ju-Hyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.6
    • /
    • pp.12-23
    • /
    • 2023
  • The goal of international development projects is to assist sustainable development in recipient countries through foreign aid from donor countries. However, despite the need for both countries to negotiate and work together from the initial stages to maintain sustainability after the project, clear guidelines or standards have not been established. Additionally, despite the need for donor countries, which are relatively advanced, to understand the situation of recipient countries, many projects are donor-centric and fail to prioritize the value of sustainability. Therefore, this study extracted economic, social, and environmental risks that threaten sustainability through literature review and proposed a sustainability framework based on these criteria. To validate framework, actual international development cases conducted by advanced donor countries such as Australia, the United States, and Japan, in collaboration with South Korea, were analyzed by applying content analysis with the reports, which covers the overall contents from the planning stage to the operation stage. Analysis of sustainability perspectives focused on economy, society and the environment, advanced donor countries emphasized (1) the importance of pre-assessment, (2) the need for coordination with the local population and communities despite the existence of donor-specific values, and (3) addressing economic considerations such as pre-operational and maintenance costs, social communication with the local population, and environmental considerations starting from the initial stages of construction regarding the treatment of pollutants as values to be improved. Compared to other advanced donor countries, the Republic of Korea should also focus on consultation with local residents to achieve social integration, and improve sustainability by deployment the managers in local sites for better negotiation.The proposed framework in this study will serve as a tool to enhance communication among the countries and the locals, with the expectation of increasing project efficiency and sustainability.

A Study on the Application of RTLS Technology for the Automation of Spray-Applied Fire Resistive Covering Work (뿜칠내화피복 작업 자동화시스템을 위한 RTLS 기술 적용에 관한 연구)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.79-86
    • /
    • 2009
  • In a steel structure, spray-applied fire resistive materials are crucial in preventing structural strength from being weakened in the event of a fire. The quality control of such materials, however, is difficult for manual workers, who can frequently be in short supply. These skilled workers are also very likely to be exposed to environmental hazards. Problems with construction work such as this, which are specifically the difficulty of achieving quality control and the dangerous nature of the work itself, can be solved to some degree by the introduction of automated equipment. It is, however, very difficult to automate the work process, from operation to the selection of a location for the equipment, as the environment of a construction site has not yet been structured to accommodate automation. This is a fundamental study on the possibility of the automation of spray-applied fire resistive coating work. In this study, the linkability of the cutting-edge RTLS to an automation system is reviewed, and a scenario for the automation of spray-applied fire resistive coating work and system composition is presented. The system suggested in this study is still in a conceptual stage, and as such, there are many restrictions still to be resolved. Despite this fact, automation is expected to have good effectiveness in terms of preventing fire from spreading by maintaining a certain level of strength at a high temperature when a fire occurs, as it maintains the thickness of the fire-resistive coating at a specified level, and secures the integrity of the coating with the steel structure, thereby enhancing the fire-resistive performance. It also expected that if future research is conducted in this area in relation to a cutting-edge monitoring TRS, such as the ubiquitous sensor network (USN) and/or building information model (BIM), it will contribute to raising the level of construction automation in Korea, reducing costs through the systematic and efficient management of construction resources, shortening construction periods, and implementing more precise construction

A fundamental study on the automation of tunnel blasting design using a machine learning model (머신러닝을 이용한 터널발파설계 자동화를 위한 기초연구)

  • Kim, Yangkyun;Lee, Je-Kyum;Lee, Sean Seungwon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.5
    • /
    • pp.431-449
    • /
    • 2022
  • As many tunnels generally have been constructed, various experiences and techniques have been accumulated for tunnel design as well as tunnel construction. Hence, there are not a few cases that, for some usual tunnel design works, it is sufficient to perform the design by only modifying or supplementing previous similar design cases unless a tunnel has a unique structure or in geological conditions. In particular, for a tunnel blast design, it is reasonable to refer to previous similar design cases because the blast design in the stage of design is a preliminary design, considering that it is general to perform additional blast design through test blasts prior to the start of tunnel excavation. Meanwhile, entering the industry 4.0 era, artificial intelligence (AI) of which availability is surging across whole industry sector is broadly utilized to tunnel and blasting. For a drill and blast tunnel, AI is mainly applied for the estimation of blast vibration and rock mass classification, etc. however, there are few cases where it is applied to blast pattern design. Thus, this study attempts to automate tunnel blast design by means of machine learning, a branch of artificial intelligence. For this, the data related to a blast design was collected from 25 tunnel design reports for learning as well as 2 additional reports for the test, and from which 4 design parameters, i.e., rock mass class, road type and cross sectional area of upper section as well as bench section as input data as well as16 design elements, i.e., blast cut type, specific charge, the number of drill holes, and spacing and burden for each blast hole group, etc. as output. Based on this design data, three machine learning models, i.e., XGBoost, ANN, SVM, were tested and XGBoost was chosen as the best model and the results show a generally similar trend to an actual design when assumed design parameters were input. It is not enough yet to perform the whole blast design using the results from this study, however, it is planned that additional studies will be carried out to make it possible to put it to practical use after collecting more sufficient blast design data and supplementing detailed machine learning processes.

Reinforcing Effects around Face of Soil-Tunnel by Crown & Face-Reinforcing - Large Scale Model Testing (천단 및 막장면 수평보강에 의한 토사터널 보강효과 - 실대형실험)

  • Kwon Oh-Yeob;Choi Yong-Ki;Woo Sang-Baik;Shin Jong-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.6
    • /
    • pp.71-82
    • /
    • 2006
  • One of the most popular pre-reinforcement methods of tunnel heading in cohesionless soils would be the fore-polling of grouted pipes, known as RPUM (reinforced protective umbrella method) or UAM (umbrella arch method). This technique allows safe excavation even in poor ground conditions by creating longitudinal arch parallel to the tunnel axis as the tunnel advances. Some previous studies on the reinforcing effects have been performed using numerical methods and/or laboratory-based small scale model tests. The complexity of boundary conditions imposes difficulties in representing the tunnelling procedure in laboratory tests and theoretical approaches. Full-scale study to identify reinforcing effects of the tunnel heading has rarely been carried out so far. In this study, a large scale model testing for a tunnel in granular soils was performed. Reinforcing patterns considered are four cases, Non-Reinforced, Crown-Reinforced, Crown & Face-Reinforced, and Face-Reinforced. The behavior of ground and pipes as reinforcing member were fully measured as the surcharge pressure applied. The influences of reinforcing pattern, pipe length, and face reinforcement were investigated in terms of stress and displacement. It is revealed that only the Face-Reinforced has decreased sufficiently both vertical settlement in tunnel heading and horizontal displacement on the face. Vertical stresses along the tunnel axis were concentrated in tunnel heading from the test results, so the heading should be reinforced before tunnel advancing. Most of maximum axial forces and bending moments for Crown-reinforced were measured at 0.75D from the face. Also it should be recommended that the minimum length of the pipe is more than l.0D for crown reinforcement.

Design of Truck Escape Ramps (자동차 긴급 피난 차선의 계획 설계)

  • 구본충
    • Journal of the Korean Professional Engineers Association
    • /
    • v.28 no.4
    • /
    • pp.54-75
    • /
    • 1995
  • This synthesis has been prepared from a review of literature on Truck Escape Ramps technology and a survey of current practice by state department of transportation. Their locations have been determined usually from a combination of accident experience and en-gineering judgement, but new tools are emerging that can identify needs and sites without waiting for catastrophic accidents to happen. The Grade Severity Rating Systems holds promise in this regard. Design Procedures for truck excape ramps continue to evolve. Gravel arrester beds are clearly the preferred choice across the country Rounded aggregate, uniformly graded in the approximate size range of 13 to 18mm. Tech-nical publications typically have dassified TER types as paved gravity, sandpile, and ar-rester bed ramps. The design speed for vehicle entry into the ramp in critical to the deter-mination of ramp length. An escape ramp should be designed for a minimum entry speed of 130km/hr, a 145km/hr design being preferred. The ramps should be straight and their angle to the roadway align-ment should be as possible. The grade of truck escape ramps show the adjustment of ramp design to local topography, such as the tradeoff of ramp length against earthwork requirements. A width of 9 to 12m would more safety acommodate two or more outof con-trol vehicles. Reguarding comments on the most effective material, most respondents cited their own specification or referred to single graded, rounded pea gravel. The consensus essentially Is that single graded, well -rounded gravel is the most desirable material for use in arrester beds. The arrester beds should be constructed with a minimum aggregate depth of 30cm. Successful ramps have used depths between 30 and 90cm.

  • PDF

An Experimental Study on the Required Performances of Roof Concrete Placed in the In-ground LNG Storage Tank (지하식 LNG 저장탱크의 지붕 콘크리트의 요구성능에 관한 실험적 연구)

  • Kwon, Yeong-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.25 no.3
    • /
    • pp.339-345
    • /
    • 2013
  • This study is to derive from the required performances and the optimum mix proportion of the roof concrete placed in the in-ground LNG storage tank with a capacity of 200000 $m^3$, and propose the actual data for site concrete work. The concrete placing work without sliding and segregation in the fresh concrete condition is very important because the slope of domed roof is varied in the large range by its curvature. Also the control of hydration heat and the strength development at test ages are classified with massive section about 1.4 m thick and considered to the pre-stressing work and removal of air support after concrete placing work. Considering above condition, slump range is selected $100{\pm}25$ mm under the slope $20^{\circ}$ and $150{\pm}25$ mm over the slope $20^{\circ}$ s until 60 minutes of elapsed time. Also, the roof concrete is satisfied with compressive strength range including design strength at 91 days (30 MPa), pre-stressing work at 7 days (10 MPa), air support removal work at 21 days (14 MPa). Replacement ratio of limestone powder is determined by confined water ratio test and main design factors include water-cement ratio (W/C), sand-aggregate ratio and dosage of admixture. As test results, the optimum mix proportion of the roof concrete used low heat cement is as followings. 1) Replacement ratio of limestone powder 25% by confined water ratio test 2) Water-cement ratio 57.8% 3) Sand-aggregate ratio 42.0%. Also, test results for the adiabatic temperature rising test is satisfied with its criteria and shown the lower value compared to preceding storage tank (TK-13, 14). These required performances and the optimum mix proportion is to apply the actual construction work.

A Study on the Revitalization of BIM in the Field of Architecture Using AHP Method (AHP 기법을 이용한 건축분야 BIM 활성화 방안 연구)

  • Kim, Jin-Ho;Hwang, Chan-Gyu;Kim, Ji-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.473-483
    • /
    • 2022
  • BIM(Building Information Modeling) is a technology that can manage information throughout the entire life cycle of the construction industry and serves as a platform for improving productivity and integrating the entire construction industry. Currently, BIM is actively applied in developed countries, and its use at various overseas construction sites is increasing This is unclear. due to air shortening and budget savings. However, there is still a lack of institutional basis and technical limitations in the domestic construction sector, which have led to the lack of utilization of BIM. Various activation measures and institutional frameworks will need to be established for the early establishment of these productive BIMs in Korea. Therefore, as part of the research for the domestic settlement and revitalization of BIM, this study derived a number of key factors necessary for the development of the construction industry through brainstorming and expert surveys using AHP techniques and analyzed the relative importance of each factor. In addition, prior surveys by a group of experts resulted in 1, 3 items in level, 2, 9 items in level, and 3, 27 items in level, and priorities analysis was performed through pairwise comparisons. As a result of the AHP analysis, it was found that the relative importance weight of policy aspects was highest in level 1, and the policy factors in level 2 and the cost-based and incentive system introduction factors were considered most important in level 3. These findings show that the importance of the policy guidance or institutions underlying the activation of BIM rather than research and development or corporate innovation is relatively high, and that the preparation of policy plans by public institutions should be the first priority. Therefore, it is considered that the development of a policy system or guideline must be prioritized before it can be advanced to the next activation stage. The use of BIM technologies will not only contribute to improving the productivity of the construction industry, but also to the overall development of the industry and the growth of the construction industry. It is expected that the results of this study can provide as useful information when establishing policies for activating BIM in central government, relevant local governments, and related public institutions.