BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service. (프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토)

  • Lee, Chang-Hee;Lee, Jeong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF

GMP Calculation Process in CM at Risk for Public Construction Project (공공 건설사업 CM at Risk 적용시 GMP 산출 프로세스)

  • Kim, Gun-Sung;Jin, Zheng-Xun;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.48-49
    • /
    • 2020
  • Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.

  • PDF

Growth Model for Korean CM Firms based on 2012 Statistics (CM기업의 단계별 발전 전략 모델: 2012년 실적자료 기반 분석)

  • Jung, Youngsoo;Shin, Dongwoo;Kang, Seunghee;Kim, Namjoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.92-104
    • /
    • 2014
  • CM services have been increasingly practiced over the two decades in the Korean construction industry, and recent efforts focus on further development in advanced CM capabilities and expansion to overseas market. However, there has been lack of holistic research to investigate current status and future direction of CM industry in Korea. In this context, the purposes of this study are 1) to analyze current status of Korean CM industry in terms of owners, market, CM firms, contracts, and work scopes, 2) to define different types of CM practices, and 3) to propose growth models for Korean CM firms based on the defined CM project types. An extensive literature review and statistical analysis of 2012 CM contracts were performed in order to analyze the CM status. Based on the analyses, ten different CM types are defined, and growth paths of CM firms are illustrated. Implications and lessons learned during the statistical analysis and workshops are briefly introduced as well.

How to Improve the Competency of Agency CM Companies to Conduct the CM at Risk Projects? (용역형 CM사가 책임형 CM 프로젝트를 수행하기 위해 필요한 역량)

  • Jeon, Myeongsik;Kang, Youngcheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.44-54
    • /
    • 2021
  • As the CM at Risk market grows recently, designers and CM companies that have been performing agency CM services have been showing their interests to participate in the CM at Risk projects. With the assumption that agency CM companies with a lot of experiences and know-how in the field of construction project management have created the circumstances to enter the CM at Risk market, this study investigates the competencies necessary for the agency CM companies to carry out the CM at Risk projects. The compentencies to run the CM at Risk projects were identified based on the literature review. A survey was conducted to identify the competencies that need to be supplemented first. The survey results revealed that competency related to partner companies, finance and guarantee, risk and claim, and project cost were identified to have a higher level of complementation compared to other competencies. In addition, considering that the level of competency that need to be secured is high, as the level of holding of all competency is on average 76% of the required level, in the beginning, small-scale CM at Risk projects with relatively low risk are mainly carry out, strengthening competency and then increasing the scale is considered more appropriate strategy.

Proposal for Improvement on the Task of Construction Project Management Service(CM) for the Customized Service Project of the Public Procurement Service (조달청 맞춤형서비스 사업에 대한 '감독 권한대행 등 건설사업관리용역(CM)' 과업내용 개선방향)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.3-11
    • /
    • 2021
  • The construction project manager must clearly carry out the activities of each construction stage specified in the 'Task Description'. In this study, 'design change' and 'completion process' were classified as core tasks in consideration of the frequency and importance of tasks. And, by analyzing the actual construction project, the task contents for the core work were standardized. This laid the foundation for the ordering office, construction project management technicians, and builders to clearly understand the business areas of construction project management and fulfill their responsibilities for their respective tasks.