• Title/Summary/Keyword: 시공업무

Search Result 419, Processing Time 0.019 seconds

Improvement of Supervision Work in Cultural Heritage Repair (문화재 감리업무 개선방안 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo;Kim, Kyong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.1
    • /
    • pp.61-71
    • /
    • 2020
  • The Cultural Heritage Administration is operating the resident supervision and non-resident supervision system to prevent poor repair and ensure the quality of cultural heritage repairs And recently, responsible supervision system was introduced to enhance the supervision of cultural heritage repairs. However, many problems have arisen in the operation of the supervision work, and need improvement. Accordingly, this study improved the resident and non-resident supervision of cultural heritage repair and developed work guidelines for the responsible supervision. First, this research has derived unreasonable sectors and problems of work guidelines for resident supervision about cultural heritage repair and has suggested supervision work guidelines which are improved. Second, we have derived the problems of work guidelines for non-resident supervision about cultural heritage repair and has suggested non-resident supervision work guidelines which are improved. Third, this paper has proposed the development direction and detailed supervision work to perform responsible supervision as a result of the adoption of the supervision system for cultural heritage repair.

Proposal for Improvement on the Task of Construction Project Management Service(CM) for the Customized Service Project of the Public Procurement Service (조달청 맞춤형서비스 사업에 대한 '감독 권한대행 등 건설사업관리용역(CM)' 과업내용 개선방향)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.3-11
    • /
    • 2021
  • The construction project manager must clearly carry out the activities of each construction stage specified in the 'Task Description'. In this study, 'design change' and 'completion process' were classified as core tasks in consideration of the frequency and importance of tasks. And, by analyzing the actual construction project, the task contents for the core work were standardized. This laid the foundation for the ordering office, construction project management technicians, and builders to clearly understand the business areas of construction project management and fulfill their responsibilities for their respective tasks.

Analysis of Construction Safety Management and Execution Tasks for Performance Improvement (건설공사 안전관리 및 시공 업무의 중요도 분석에 관한 연구)

  • Kang, Sang-Hun;Kim, Dae Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.130-131
    • /
    • 2018
  • The main purpose of this study is to analyze the importance of the construction work of apartment buildings. The construction work operation was divided into five major tasks, which include: Schedule Control (P'1 - P5) Construction Management (C'1 - C'5), Environmental Management (E'1 - E'3), and Quality Management. Finally, this study derived major construction execution tasks through correlation between construction work and the original index and t-test.

  • PDF

Analysis of Construction Safety Planning Tasks for Performance Improvement Using Importance Performance Analysis (IPA) Method (안전관리자 계획단계 업무 도출을 통한 난이도 및 예방효과 분석)

  • Kang, Sang Hun;Huh, Young-Ki;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.545-554
    • /
    • 2020
  • As recent safety accidents at construction sites can lead to serious accidents that threaten the lives of workers, the role of safety managers in charge of safety management has emerged. However, the current construction safety management system requires the improvement and simplification of the work contents due to the excessive workload and inefficient safety tasks of each person. In this respect, the main purpose of this study is to reduce the occurrence of construction safety accidents by deriving correlations using 2×2 Matrix analysis techniques through expert opinion, simplifying unnecessary tasks and identifying areas requiring improvement. Therefore, if this research reduces inefficient safety manager work and reduces job stress caused by excessive simple document work, thereby efficiently reorganizing safety manager's work to prevent blind spots of hazards and risks, it will ultimately have a great effect on preventing safety accidents at construction sites.

Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

A Field Study on the Preference in the Construction Management - Focused after construction Stage - (현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 -)

  • Lee, Doo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

A Field Study on the Preference in the Construction Management - Focused after construction Stage - (현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 -)

  • 이두진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

Measures to Implement Comprehensive Supervision for the Purpose of Bolstering Construction Management (CM) (건설관리(CM)업무 활성화를 위한 종합감리업무 수립방안)

  • Yoon, Jun-Seon;Yoo, Byoung-Eok;Han, Chang-Pyeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.4 s.22
    • /
    • pp.99-102
    • /
    • 2006
  • Although constructions are getting diverse, larger in size, and higher-storied, we witness that CM technologies are not coping with such a growing trend. In particular, CM, one of vulnerable areas, shall continue to be given priority hereafter. The research has been conducted with a strong focus on total design and supervision offices already specializing in CM projects, in order to prepare for the future activated CM markets. Authors have sought to find mistakes in the process of being in control of CM works and create measures to boost CM through case-study, documentary research, and interviews with experts. It excludes theoretical research, as many data are already accumulated domestic and abroad.

A Framework of Automating Inspection Task Generation for Construction Projects (건축 시공단계 검측 업무 자동 생성을 위한 프레임워크 개발)

  • Jo, Seuckyeon;Lee, Jin Gang;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.40-50
    • /
    • 2023
  • Quality control (QC) is an essential work for the successful construction project execution. Recently, robust application of ICT to the QC tasks leads to utilizing innovative technologies and equipment. However, overall planing of QC works needs to take place before applying new technologies to each and individual QC task. The objectives of this research involve developing a database and an algorithm that identifies QC tasks and related information upfront. In addition, the researchers developed a methodology to generate inspection tasks in conjunction with construction work tasks. The Korean Ministry of Land and Transportation provides standard supervision checklists. They were classified based on criteria of inspection items, methods, period and the scope. Reinforced concrete work was selected as a case study for validation of the method. This framework can function when planing construction tasks with any type of planning tools and innovative technologies. The researchers expect this framework may contribute to various construction projects when developing QC plans and tasks with applicable technologies.

안전관리 - 설비공사 주요 안전대책

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.253
    • /
    • pp.57-61
    • /
    • 2011
  • 설비공사는 구조물의 진행에 따라 처음부터 준공시까지 진행되며, 작업공종별로 대부분 단시간에 이동작업을 하여야 하는 작업이 주종을 이루고 있고, 다양한 전기기계 기구를 사용하여 작업을 하기 때문에 이에 따른 추락, 협착 및 감전재해 등 안전관리에 각별히 유의해야 한다. 본지는 시공업무에 도움이 되고자 기계설비의 주요 안전관리에 대한 대책을 연재한다.

  • PDF