• Title/Summary/Keyword: 시공실태

Search Result 172, Processing Time 0.02 seconds

Leakage Situation and Main Leakage Areas of Domestic Residential Building Underground Parking Lots (국내 공동주택 지하주차장의 누수 실태 및 주요 누수 부위 조사)

  • Lee, Jung-Hun;Song, Je-Young;Oh, Sang-Keun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.4 no.4
    • /
    • pp.496-503
    • /
    • 2016
  • This paper studies the leakage situation of domestic residential building underground parking lots and main leakage areas. 18 complexes were studied and the results showed that 80% of buildings with exterior waterproofing had no leakage, but all buildings with interior waterproofing had leakage. According to a survey among professionals, water leakage problems are considered to be severe in underground parking lots and a preventative measure is required by the government. By comparing the survey and the actual situation at hand, the results showed that the lowest floor slab, wall construction joints, and floor expansion joints were the most prone to leakage. Based on the results, further study to develop a design manual for the appropriate prevention of leakage is deemed necessary.

A Study on the On-site Flame Resistant Treatment in Domestic (국내 현장방염 시공의 실태분석 연구)

  • Kim, Hwang-Jin;Lee, Sung-Eun;Oh, Kyu-Hyung
    • Fire Science and Engineering
    • /
    • v.25 no.2
    • /
    • pp.33-38
    • /
    • 2011
  • This study is a research for analysis the states of flame resistant treatment and its system which important in fire prevention by ignition delay of early stage of fire. Some problems arose in the flame resistant treatment site were analysed through the meeting with fire officer and businessman related with flame resistant treatment, and visiting the flame resistant treatment places. From the meeting, visiting and reviewing the code system we find the following problems. First one is a problem of excessive competition with many company in small market of flame resistant treatment and to reduce the cost, the businessman who have no professional technic do not work along the specification. Second one is the inspection system which do not inspect on site but inspect by sampling the flame resistant treated materials submitted by businessman. And there are some problems arose about the reliability and consistency of flame resistant performance of the sample and the treated site. To solve the above problems, we suggest some countermeasure.

The Study On The Actual Condition Of Rebar Work In Korean Building Construction (국내 건설 현장의 철근공사 실태조사에 관한 연구)

  • 이응균;박우열;강경인
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.133-138
    • /
    • 2002
  • Rebar work takes up big proportion in a construction work. The current process of purchasing, cutting and election, and working of rebar induces a lot of loss in rebar. This study is focused on analyzing the problem and the present condition of the process from the calculating of rebar quantifies to the actual constructional stage through surveying those who have experience in the estimation department, or the construction site of a domestic construction company. Many reform measures such as diversification of standard(i.e., 8-meter)bar, calculation of rebar quantities and construction according to the rebar election drawing, expansion of accuracy in layout plan, thoroughness in examination of layout plan in advance, utilization of the worked material, systemization of rebar control(management), and a shift in attitude of the field(site) manager were proposed as the result of the survey.

  • PDF

일본의 건축물녹화 조성 및 지원제도 연구

  • Park, Bong-Ju;Kim, Won-Tae;Yun, Yong-Han
    • Proceedings of the Korean Environmental Sciences Society Conference
    • /
    • 2008.11a
    • /
    • pp.554-556
    • /
    • 2008
  • 본 연구는 도시생태계 복원을 위해 추진되고 있는 일본의 건축물녹화의 지원제도 및 조성실태를 분석하였다. 건축물녹화와 관련된 지원제도의 경우 중앙정부와 더불어 각 지방자치단체에서 다양한 지원대책이 실시되고 있는 것으로 나타났다. 옥상녹화의 시공면적은 8년 동안 누계 약 2,000,000m$^2$가 조성된 것으로 나타났으며, 도쿄도가 659,879m$^2$로 전체의 34.0%를 차지해 선도적인 역할을 하고 있는 것으로 나타났다. 그 다음으로 가나가와현, 오사카후, 효고현, 사이타마현의 순으로 나타났다. 벽면녹화는 누계 165,935m$^2$가 시공된 것으로 나타났으며, 도쿄도가 45.7%인 75,889m$^2$로 가장 높은 시공면적을 보였으며, 그 다음으로 효고현, 아이치현, 가나가와현, 사이타마현의 순으로 나타났다.

  • PDF

Current Status and Appropriate Check Method of Construction Quality Control for Rebar Coupler Splice (철근 커플러이음의 시공품질 확인 현황 및 적정 시공품질 확인 방안)

  • Kim, Ju-Yong;Kim, Jin-Dong;Lee, Young-Do;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.531-542
    • /
    • 2022
  • As buildings become taller, the strength of structural materials must increase and the amount of rebar reinforcement also increases while the application of an appropriate rebar splice method in the construction process become one of the essential factors. In this research, the current status of quality check for rebar coupler is identified by an expert questionnaire and an appropriate quality check method is proposed through a quality test on specimens similar to actual on-site construction. In the test results, it was revealed that, among the quality check methods for rebar coupler joints, the coupler tightening method and face to face degree of between upper and lower rebar did not affect the strength the specimen. Therefore, it is considered to be an appropriate way to check the coupler quality check to check whether the threads are completely assembled during on-site construction through manufacture the number of threads of rebar and coupler with a margin beyond the calculated thread number.

A Study on the Actual Condition and Development of BCWS Management In Large Apartment Complex Project (대단지 아파트 건설공사의 계획기성 관리실태에 관한 연구)

  • Kim Sang-Hee;Yang Yong-Cheol;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.434-437
    • /
    • 2003
  • In apartment project, BCWS is a critical management factor and has a great influence on the success of the project. But due to the characteristics of large apartment complex, there are several problems in making out a time schedule of work as well as production and management of precise bcws from the allocation of resources. In this study, Actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of bcsw through the analysis of the problems and the origins relating to BCWS from a field area.

  • PDF

A Survey for a Development Construction Materials' Construction Site Quality Control Guide (건설자재 현장품질관리 지침 개발을 위한 실태조사)

  • Ko, Eun-Joo;Ko, Eun-Jung;Seok, Ho-Joong;Lee, Seung-Hyeok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.1-5
    • /
    • 2008
  • The purpose of this study is to ensure an amicable material quality control in the construction site through investigating a process which can impact the construction material quality. For it, a worker interview and questionnaire survey was conducted through a direct field visit. The visited construction sites are composed of 79% construction site and 21% engineering site. As the respondents of questionnaire survey, the quality control workers were 72% of total respondents. Next, the construction worker, handymen, field representatives and others formed 7%. The interview with the quality control staff was conducted with the items including the construction site quality control guide, incoming inspection and material management. Through this survey, the problems of quality control by progress phase were derived. It could be known that the management and measures by each phase were urgently required. It also was indicated that a selection of low-priced material caused by low price bidding could badly impact the construction and safety. Also, in relation to the opinions such as the insufficient quality control and heavy work-load, the improvements are required. For the effective quality control in the construction site, the material quality control procedures suitable for the phase of construction progress must be presented in the present quality control. Also, the standards for it need to be established.

  • PDF

Analysis on the Application of Estimation Criteria for Construction Cost of Masonry and Demolition (돌쌓기 및 헐기 공사의 공사비산정기준 적용실태 분석)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.234-235
    • /
    • 2019
  • In the stacking and pitching items of the stone masonry and demolition process presented by 2018's standard of estimate, 7 estimating standards are presented according to the depth of masonry stone, and it is presented that the quantity per unit increases as the depth of masonry stone grows. As a result of analyzing the application status in the site, it is shown that 2 or 3 stones are mainly used according to the stone sizes regardless of the depth of masonry stone, and that as the size of the stone becomes larger, the quantity per unit decreases due to the size per square meter(㎡). Also, in most of sites, machine construction is mainly carried out by excavators with clampers attached to them. Therefore, in the 2019's application standard of estimate, it is analyzed that the size is simplified down to 3 sizes reflecting the site application status and that it is revised as a standard reflecting the result that as the stone size becomes bigger, the productivity increases.

  • PDF

A Study on the Actual Conditions of Quality Standards Recognition of Rebar Workers (철근작업자의 품질기준 인지 실태 조사)

  • Lee, Byung-Yun;Choi, Oh-Young;Han, Byung-Min;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.243-246
    • /
    • 2009
  • Importance of quality control is gradually increasing in the construction. And the reber work is very important things which influence in safety and durability of the building and accounts for about 9.8% of the total cost. Although reber work is important, quality control of the rebar work is still performed by attitude and experience of worker. Therefore, it is very important to quality achievement effort and quality standards recognition of rebar worker for quality sophistication in the construction. Some papers have dealt with the quality control in construction. But there was no study for actual conditions of quality standards recognition of rebar workers. The purpose of this study is to survey the actual conditions of quality standards recognition of rebar workers and to analyze difference of consciousness of administrator and worker. The result are : there id difference of consciousness of worker and administrator, workers work without knowing quality standard.

  • PDF