Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance (건설 프로젝트 특성에 따른 성과 제고가 가능한 최적 공사 관리기법 선정 방안)

  • Ko, Young-Jin;Cha, Hee-Sung;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.3-13
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

A Study on Improvement of Road Compaction Method in Soft Ground (연약지반 상 노상다짐 방법 개선에 대한 연구)

  • Choi, Hyeonsuk;Jang, Hohun
    • The Journal of Engineering Geology
    • /
    • v.29 no.4
    • /
    • pp.427-437
    • /
    • 2019
  • The purpose of this study is to improve construction cost, time, and field management when constructing a road on soft soil foundation by eliminating extra-banking of subgrade layer after completion of the consolidation process. The subgrade layer was pre-constructed before the soft ground improvement. And then it was confirmed by the field test that the compaction effect was maintained or not after consolidation settlement. As a result of the experiment, all subgrade layers were kept constant except for the top subgrade layer. So it would be advantageous to secure economical and practical in road construction if subgrade layers were constructed exclusive of the top subgrade layer.

설계$\cdot$시공 일괄입찰제도 개선

  • 조영준;남정수;김홍만;이태식
    • 월간 기계설비
    • /
    • s.35
    • /
    • pp.28-42
    • /
    • 1993
  • 최근들어 우루과이 협상의 진전이 가사화됨에 따라 서비스업의 개방이 현실적인 사항으로 인식되고 있고, 서비스업으로 분류되는 건설업도 개방압력에 직면해 있다. 건설시장의 개방에 따라 가장 크게 우려되는 부분은 국내업체의 설계 및 엔지니어링 분야를 들 수 있으며 선진외국 건설업체와 비교했을 때 매우취약한 실정이다. 이에 대처하기 위해 설계 및 엔지니어링 기술을 육성시킬 수 있는 기술경쟁입찰 풍토를 조성할 필요성이 있으며 설계 및 시공단계의 상호조정을 통하여 공사수행을 보다 효율적으로 수행할 수 있는 일괄입찰제도의 확대운용은 필수적이라 하겠다. 따라서 본 연구는 국내 일괄입찰공사의 확대시행을 위한 현행 일괄입찰제도의 개선방향을 설정하고 일괄입찰제도 절차의 개선안을 제안하여 설계입찰자의 평가 및 낙찰자 선정에 대한 구체적인 개선안을 도출하고자 하였다. 이와 같은 개선방안의 마련을 위해 설문 및 면담조사가 실시되었으며 최종적으로 실무자들과의 총의회를 통하여 최종안을 제안하였다. 본 연구의 주된 내용은 일괄입찰공사유형의 제시, 사전자격심사, 입찰서류 및 입찰기간, 입찰자평가시 발주처참여, 낙찰자선정, 실시설계판정, 건축$\cdot$토목$\cdot$기계$\cdot$설비에 대한 새로운 평가체계 제시 등으로 요약할 수 있다.

  • PDF

A Study on the Mechanization of the Grounding Rod Earth Construction Method to Improve the Grounding Resistance Characteristics (봉형접지극 접지저항 향상을 위한 기계화 시공 연구)

  • Park, Jung-Shin;Cho, Sung-Jae;An, In-Suk
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.10
    • /
    • pp.143-150
    • /
    • 2009
  • The bar-shaped electrode is very popular in earth construction for its easy obtainments of the regulative grounding resistance values on power distribution systems in many countries. For these reason, a lots of researches are being proceeded on its deformation and materials. But the grounding construction has limit for improvement the grounding resistance characteristics not only by the improvement of the driven electrode, because that the grounding characteristics are very sensitive to soils(hard, soft). This study is about the construction methods on which the driven electrode can be serially or parallely connected using by hollow screw rod for obtaining the regulative grounding resistance values. The experimental results show that the grounding resistance values are reduced more than 30[%] comparing with the other construction methods under the same conditions(earth resistance, numbers of driven electrode, construction method of serial and parallel, chemicals for reducing grounding resistance, water).

A Case Study of the Improvement of the Structural Work of a Logistics Facility by Using PC Member (PC부재에 의한 물류시설의 골조공사 개선사례 연구)

  • Kim, Seon-Hyung;Choi, Eun-Gyu;Kim, Sun-Kuk;Lee, Sung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.127-135
    • /
    • 2010
  • As logistics facilities have a high ceiling height, simple structure, and the need for a quick return on investment, it is usually essential to advance the construction schedule of such facilities. Accordingly, PC structures, which require less labor, cost and schedule, can be more competitive than RC structures. However, most construction companies in Korea are familiar with RC structure design, have negative perceptions regarding PC structures, and do not sufficiently adopt new construction techniques. The structure that this research features has 110 columns that are 14 m high and are built to the same specification, and applying an RC design to the structure will lead to issues related to constructibility, economic viability, project duration and safety. Therefore, this study intends to feature PC design as an alternative to the RC warehouse design, and perform a comparative analysis of the reduction in labor, cost and construction schedule to highlight benefits. The research outcomes herein will provide inputs to subsequent studies on new construction strategies to advance the construction schedule, improve quality and constructibility, enhance safety and save costs.

Applications of Improved Low-Flow Mortar Type Grouting Method for Road Safety and Constructability in Dangerous Steep Slopes (급경사지 붕괴 위험지역의 도로 안전 및 시공성을 고려한 개선된 저유동 몰탈형 그라우팅공법 적용성 분석)

  • Choi, Gisung;Kim, Seokhyun;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.409-415
    • /
    • 2020
  • Low-flow mortar injection method grouting technology was selected and the traffic area was preserved as much as possible in order to secure safety for road traffic when the outflow and subsidence of landfill occurred due to ground-water, and etc. In particular, the current existing method was newly improved since there are risks of damage such as hydraulic fracturing at the lower part of the road, spilling of soil particles on steep slopes, and bumps on the road due to excessive injection pressure during construction. This study was carried out at the site of reinforcement work on the road as a maintenance work for the danger zone for collapse of the steep slope of the 00 hill, which was ordered from the 00 city 00 province. The improved low-flow mortar type grouting method adopted a new automated grouting management system and especially, it composites the method for grouting conditions decision by high-pressure pre-grouting test and injection technology by AGS-controlled and studied about grouting effect analysis by using new technology. By applying the improved low-flow mortar type grouting method, it was possible to lay the groundwork for road maintenance work such as the prevention of subsidence of old roads, uneven subsidence of buildings and civil engineering structures, and of soil leakage of ground-water spills. Furthermore, the possibility of application on future grouting work not only for just construction that prevents subsidence of old roads but also for various buildings and civil engineering structures such as railroads, subways, bridges, underground structures, and boulder stone and limestone areas was confirmed.

Critical Success Factors for Nuclear Power Plant Construction Projects (원전건설의 성공적인 시공을 위한 핵심성공요인(CSFs) 도출)

  • Shin, Gisung;Bang, Seongdeok;Kim, Kyeongseok;Kim, Hyoungkwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.48-57
    • /
    • 2017
  • The construction of the first nuclear power plant (Kori #1) in Korea started in 1971, Korea operates 24 nuclear power plants and is constructing 4 in 2015. During about 45 years of construction experience, insufficient studies have been investigated for the identification of critical success factors(CSFs) for nuclear power plant construction. Based on literature reviews and focus group interviews, this study presented a list of CSFs for construction of nuclear power plants. A survey for validating the results of CSFs was conducted with 164 experts. This study indicates that attentions should be placed upon the lowest price-based contract awarding policy, the need for reasonable pricing standard implementation, database development, and deployment for experienced nuclear power plant construction workers, identification and nurturing of competitive subcontractors, and minimization of lag times in construction activities.

Improvement of Synthesis Construction Plan through 6sigma (6시그마를 통한 종합시공계획서 작성 프로세스 개선)

  • Baek, Ho-Jin;Yoo, Chang-Kyu;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.613-617
    • /
    • 2007
  • To achieve project successfully in domestic construction site, pre-management of risk is important factor. Synthesis Construction Document made early construction is representative as means of pre-management of risk. But, Synthesis Construction Document is not working properly for pre-management of risk because the level is low as Synthesis Construction Document is made formally and the time is too late to pre manage the risk for various factor. A epoch-making method that differ with existing need to solve this deep-rooted problem of domestic construction site. So, this study is analyzing to achieve subject to heighten level Synthesis Construction Document and shorten creation period with "S"construction company(introducing 6sigma by tool of management innovation 6 sigma)'s data and offering an opportunity that heightens effectiveness and goes forward and aims possibility about construction site suitability of 6sigma by confirming Pilot Test.

  • PDF

Improvement Prospect and Problems of Revegetation Method in the Cutting Slope (절토사면의 보호 및 녹화공의 문제점과 개선방향)

  • 전기성;유병옥;황영철;김태수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11b
    • /
    • pp.123-135
    • /
    • 2000
  • 절토사면 보호.녹화공의 개념과 분류체계가 아직까지 확립되어 있지 않으며, 현장에서 공법의 선정과 시공도 여러 가지 적절하지 못한 경우가 자주 발생하고 있다. 이러한 것을 해결하기 위해서는 이 분야에 대한 지속적인 투자와 관심, 그리고 관련회사의 사면의 환경특성을 고려한 성실시공이 수반되어야 한다. 또한, 절토사면의 장.단기적인 유지관리를 위해서 사면의 분포현황, 사면녹화공의 시공.관리상태, 환경특성 등의 자료를 조사하여 종합적인 사면유지관리시스템과 연계해야 할 것이다.

  • PDF