• Title/Summary/Keyword: 시공방법론

Search Result 162, Processing Time 0.032 seconds

Usability Improvement of BIM for Construction Projects Using Active BIM Functions (능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구)

  • Kang, Leen-Seok;Moon, Hyun-Seok;Kim, Hyeon-Seung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.74-83
    • /
    • 2013
  • Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.

A Study on Interaction Behaviors of Soil-PET Mat installed on Dredged Soils (연약한 준설점토상 매립시 포설된 PET 매트와 지반거동에 관한 연구)

  • Lee Man-Soo;Jee Sung-Hyun;Yang Tae-Seon
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.3
    • /
    • pp.13-21
    • /
    • 2006
  • Geosynthetic damage has attracted a major attention since the introduction of geotextiles for civil engineering applications. In this study 3 pilot trial embankments were carried out to investigate the behaviours of reinforced embankments over soft cohesive soils and to find the optimum methodology of embankments over soft soils. As the seamed part of polyester mat (PET, tensile strength 15 ton) used in the first full-scale field test was ruptured under progressing rotational slope failure because of unexpectedly rapid construction of embankments, the excessive pore water pressures were measured. On the soil behavior where tension explosion of mat was continued, pore pressure larger than the one caused by embankment height was measured. Especially, at the depth of 5.0 m under the ground pore pressure increased over long term. It was discussed with respect to the height of embankment and heaving behavior of soft soils.

Proposal of the Modified Management Criteria Value in Earth Retaining Structure using Measured Data (계측자료를 이용한 흙막이 구조물의 수정된 관리기준치 제안)

  • Kim, Jueng-Kyu;Park, Heung-Gyu;Nam, Jin-Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.1
    • /
    • pp.95-103
    • /
    • 2016
  • The absolute value management method is widely used in the most of the earth retaining construction, which evaluates the safety by comparing measurement result and management criteria. Therefore, the management criteria is the standard to evaluate the safety of the site, and in other words, the criteria is a direct factor of the evaluation. That means that the safety of the site can not be acquired if the management criteria is not proper, even though the measurement system is perfectly set. However, many of field technicians do not have rely on the current management criteria, and they even recognize the necessity of the revision. Therefore, in this study, the necessity of the revision was studied. Also, the optimum criteria selection and the application were performed based on the test results of earth retaining deflection and probabilistic theory. The absolute value management method was used for this study. The details are tabulated.

Method of Deriving Activity Relationship and Location Information from BIM Model for Construction Schedule Management (공정관리 활용을 위한 BIM모델의 공정별 수순 및 위치정보 추출방안)

  • Yoon, Hyeongseok;Lee, Jaehee;Hwang, Jaeyeong;Kang, Hyojeong;Park, sangmi;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.33-44
    • /
    • 2022
  • The simulation function by the 4D system is a representative BIM function in the construction stage. For the 4D simulation, schedule information for each activity must be created and then linked with the 3D model. Since the 3D model created in the design stage does not consider schedule information, there are practical difficulties in the process of creating schedule information for application to the construction stage and linking the 3D model. In this study, after extracting the schedule information of the construction stage using the HDBSCAN algorithm from the 3D model in the design stage, authors propose a methodology for automatically generating schedule information by identifying precedence and sequencing relationships by applying the topological alignment algorithm. Since the generated schedule information is created based on the 3D model, it can be used as information that is automatically linked by the common parameters between the schedule and the 3D model in the 4D system, and the practical utility of the 4D system can be increased. The proposed methodology was applied to the four bridge projects to confirm the schedule information generation, and applied to the 4D system to confirm the simplification of the link process between schedule and 3D model.

Construction Technology Research and Development Planning - In the Case of Real-time Construction Project Monitoring System Development - (건설 기술 연구 개발을 위한 기술 기획 - 적시 시공을 위한 시공 현장 모니터링 기술 사례를 기반으로 -)

  • Kim, Changyoon;Kim, Hyoungkwan;Kim, Changwan;Kim, Moon Kyum
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.849-857
    • /
    • 2008
  • Technology roadmapping is one of the widely used technology planning methodologies. Using a technology roadmap, the researchers can increase the possibility of the project success by systematic management of research contents, budgets, and commercialization strategies. Currently, Ministry of Land, Transport and Maritime Affairs has a plan to increase the research fund to improve the construction industry. As a result, the number of long term research projects with more than five years of research period, is increasing. This entails the need for a methodology for the systematic planning and management of research. However, the construction industry has the characteristics that the research results should ultimately be implemented in an outdoor environment. Through processes of diverse literature reviews, questionnaire-based survey, and pilot research, this paper presents a systematic procedure for the development of construction technology roadmaps, which can consider the unique nature of the construction industry. Based on the procedure, a technology roadmap for intelligent construction monitoring is also developed.

A Study of Construction Methods for Quality and Productivity Enhancement of Form Works in the Bearing Wall Systems (벽식구조 거푸집공사의 품질 및 생산성향상을 위한 공법개선 연구)

  • Lee Jung-Ho;Joo Jin-Kyu;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.523-526
    • /
    • 2002
  • In the bearing wall systems, a form work has a lot of room that saves cost because it takes a substantial proportion of construction cost. Therefore the systemic and efficient methods are required in the form work. This study focuses on methods that enhance the quality and the productivity of form work and presents the kicker form as an alternative plan to simplify the form work through being modular and automatical it. Work sampling method is used for productivity measurement. It is expected that it will reduce the work process and improve the Qualify and the podructivity of construction.

  • PDF

A Case Study of Application of the Emulsion Explosives in Long Hole Tunnel Blasting (장공 터널발파에서 Emulsion폭약의 시공사례와 적용성에 관한 연구)

  • 조영곤;김희도;이상돈
    • Explosives and Blasting
    • /
    • v.19 no.1
    • /
    • pp.31-40
    • /
    • 2001
  • 일반적으로 장공발파(長孔發破) 방법(Long hole blasting method)은 그동안 주로 대규모 채탄막장이나 댐 기초굴착, 광산 등에서 행하여져 왔으나 최근 토목터널에서 시공 효율성 및 경제성을 목적으로 관심이 높아지고 있다. 기존의 터널설계 패턴은 I -Type을 기준으로 3.5~3.8m 천공이며 신공법 적용시 최대 4.Om까지 설계되는 것이 보통이었다. 과거 착암장비는 천공장이 늘어남으로서 슬러지에 의한 천공속도가 저하되어 천공비가 증가하기 때문에 빠른 슬러지 배제가 필요하고 Rod의 휨 현상에 의한 천공오차의 증대를 초래할 수 있는 단점이 있었다. 그러나 최근 장비의 발달로 인하여 천공각도 및 천공장 등을 Computer로 모니터링하여 제어할 수 있어 정밀한 천공이 가능하여 졌고 또한, 고성능 에멀젼계 폭약(Super Emulsion)의 개발로 그동안 극 경암터널에서 에멀젼계 폭약의 단점으로 여겨졌던 비 장약량의 증대와 사압현상의 발생, 굴진효율 저하문제론 극복할 수 있었다. 따라서 본 연구는 현재 건설중인 대상현장을 중심으로 장공 터널발파의 효율성과 경제성을 분석하고 나아가 암질에 따른 새로운 Type별 설계기준을 마련하는 기초자료로서 활용하고자 하였다. 된 연구의 대상현장은 충북 괴산군 영풍면 소재 중부내륙(여주-구미간) 고속도로 제 9공구 이화터널 건설공사현장으로 $\varphi{102mm}$ 무 장약공 Cylinder 4공을 이용한 심발법을 사용하였으며 천공장은 최대 5.0m로 2000년 11일 15일에서 동년 12월 15일까지 31일간 총 112회의 시험발파를 실시하여 평균 92%의 높은 굴진 효율을 기록하였다.

  • PDF

Preliminary Study on Applying VE to Design Change (설계변경 시 VE 적용을 위한 예비연구)

  • Nam, Keong-Woo;Jang, Myung-houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.80-81
    • /
    • 2019
  • Change requests occur persistently in the construction phase of a construction project. The law requires that the contract amount be adjusted in accordance with the relevant regulations when there is a change in the construction amount due to the design change in the construction contract. SAVE international, on the other hand, defines the value methodology as a systematic and structured approach to improving projects, products and processes. Design Changes in the construction projects require organizational efforts to improve value and quality. However, the law does not include change requests in which the VE object is fixed and related data is collected and function analysis can be derived in a short time. Therefore, it is necessary to apply VE to the design change procedure, which can further improve the value of construction work. The application derived from this study need to be presented as simply as possible without compromising the basic concept of VE. If the application is extended to the field and proved to be effective, it is expected to contribute to the overall value of construction work.

  • PDF

The Comparison of Certified Emission Reductions Forecasting Model Using Price of Certified Emission Reductions and Related Search Keywords (탄소배출권 가격과 연관검색어를 활용한 탄소배출권 가격 예측 방법론 비교)

  • Kim, Hyeonho;Im, Giseong;Kim, Yujin;Lee, Minwoo;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.44-45
    • /
    • 2020
  • Korea has the fourth highest CO2 emission among OECD countries in 2018, As of 2019, total greenhouse gas emissions per capita increased by about 98.2% in comparison to 1990. Korea has promised a 37% reduction in greenhouse gas emissions in 2030 from the projected Paris Climate Change Accord. Currently, many countries use the emissions trading system(ETS) for international carbon management. In 2015, ETS has been implemented in Korea, and the importance of calculating CO2 emissions from construction machinery has increased. So, we require an accurate calculation of the environmental charges through the allocated CERs. Using the CER price and related search keywords, this paper derive about prediction models of CER price and compare and focus on more accurate prediction about CER price. By this method, the budget needed to establish the initial construction process plan can be calculated based on more accurate predicted CER price.

  • PDF

GNSS-Based PHC Pile Cutting Position Sensing Methodology (GNSS 기반 PHC 파일 절단위치 센싱 방법론에 관한 연구)

  • Cho, Se-Hyun;Yoou, Geon-Hee;Kim, Jun-Sang;Lee, Jun Ho;Hur, Je;Kim, Young Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.387-388
    • /
    • 2023
  • PHC pile head cutting is an essential work in pile foundation construction. However, since the work has labor-intensive characteristics, there are problems such as productivity and safety. So in previous study PHC pile one-cutting head cutting automation equipment was developed to solve this problem. However, it has been investigated as a limitation that checking the cutting position of the PHC pile can be challenging in place where a rotary laser leveler cannot irradiate cutting position, as the sensing unit of the developed automated equipment utilizes an optical method. Therefore, the objective of this study is to delvelop a GNSS-based methodology for sensing the cutting position of PHC piles to overcome the limitations of the optical method and to examine its feasibility for field application. If the proposed methodology is applied to the construction site, it is expected that the convenience and productivity of the PHC pile cutting position sensing work will be improved.

  • PDF