• Title/Summary/Keyword: 스터드볼트 접합

Search Result 14, Processing Time 0.023 seconds

Tensile Behavior of Stud Bolt Connections (스터드 볼트 접합부의 인장 거동에 관한 연구)

  • 이태석;김승훈;서수연;이리형;홍원기
    • Journal of the Korea Concrete Institute
    • /
    • v.13 no.4
    • /
    • pp.321-328
    • /
    • 2001
  • This paper presents the tensile behavior of stud connections installed between reinforced concrete and steel members. Eight specimens are tested to verify the factors influencing the tensile behavior of the connection. Major variables considered in the test are the reinforcement ratios of concrete member and connection details. Test results indicate that the reinforcing bars near stud bolts contribute to the increase of the tensile strength of the member as well as to the reduction of brittle failure. It is shown that C-type or U-type connection has relatively high ductility. From the evaluation on the tensile strength of test results including those of peformed by previous researchers, it was shown CCD (Concrete Capacity Design) method overestimated the strength. In this paper, the reduction factor of 0.75 ø instead of ø is suggested for design purpose of the stud connection.

An Experimental Study of Demountable Bolted Shear Connectors for the Easy Dismantling and Reconstruction of Concrete Slabs of Steel-Concrete Composite Bridges (강합성 교량의 콘크리트 바닥판 해체 및 재시공이 용이한 분리식 볼트접합 전단연결재에 관한 실험적 연구)

  • Jung, Dae Sung;Park, Se-Hyun;Kim, Tae Hyeong;Kim, Chul Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.751-762
    • /
    • 2022
  • Welded head studs are mainly used as shear connectors to bond steel girders and concrete slabs in steel-concrete composite bridges. For welded shear connectors, environmental problems include noise and scattering dust which are generated during the removal of damaged or aged slabs. Therefore, it is necessary to develop demountable shear connectors that can easily replace aged concrete slabs for efficient maintenance and thus for better management of environmental problems and life cycle costs. The buried nut method is commonly studied in relation to bolted shear connectors, but this method is not used in civil structures such as bridges due to low rigidity, low shear resistance, and increased initial slip. In this study, in order to mitigate these problems, a demountable bolted shear connector is proposed in which the buried nut is integrated into the stud column and has a tapered shape at the bottom of an enlarged column shank. To verify the performance of the proposed demountable stud bolts in terms of static shear strength and slip displacement, a horizontal shear test was conducted, with the performance outcomes compared to those of conventional welded studs. It was confirmed that the proposed demountable bolted shear connector is capable of excellent shear performance and that it satisfies the slip displacement and ductility design criteria, meaning that it is feasible as a replacement for existing welding studs.

An Experimental Study on Structural Performance of HRC Composite Beam according to types of Connection Plate with Stud Bolts (HRC 복합보의 연결플레이트 보강법에 따른 구조성능실험)

  • Lee, Soo-Kueon;Yang, Jae-Guen;Song, Chang-Seok;Jang, Eun-Young;Moon, Jun-Chul
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.3
    • /
    • pp.377-384
    • /
    • 2011
  • Recently, for the purpose of reducing work terms and improving performance for construction work, various methods in structure field were developed. This included the HRC system which is applicable to a typical structure (e.g., parking and office building). The HRC system introduced the Gerber Joint to raise structural efficiency and used connection plate to bolt HRC composite beam to H beam in the construction field. In this research, the experimental tests for six specimens, which were in the same field conditions, were conducted with several parameters such as the length and height of the connection plate and the number of stub bolts. The test result was compared with those made by current design codes for the deflection and strains of the main bar. Within the given load, the integration of concrete in beam and connection plate, welded with stud bolts, was verified.

Mechanical Properties of High Stiffness Shear Connector (고강성 스터드볼트의 역학적 특성에 관한 연구)

  • Eom, Chul-Hwan
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.28 no.5
    • /
    • pp.491-496
    • /
    • 2015
  • The headed studs used extensively for steel-composite construction are specified as SS400 in the current Korean Standard specification considering the welding condition. And the corresponding equation for the shear force calculation is limited for the use of compression strength of concrete below $300kgf/cm^2$. However, it is expected that the high strengthening and precasting of both steel and concrete due to the necessity of shear connector or other connecting material for the combination of steel and concrete. Therefore, the experimental results obtained during the development process of high strength stud for the connection of high strength concrete and the steel member are reported in this paper. Also the effectiveness of newly developed shear connector using pipe(pipe stud) to increase the stiffness of a stud is verified by comparing both the stiffness and the strength with common stud bolt through the welding ability, mechanical characteristics and experimental investigation.

Elasto-Plastic Behaviors of Composite Beam using Shear Connectors installed in Driving Pins (드라이빙핀전용 전단연결재를 이용한 합성보의 탄소성 거동)

  • Yang, Il-Seung;Oh, Young-Ho;Lee, Man-Jae
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.1
    • /
    • pp.73-80
    • /
    • 2012
  • The adoption of a composite beam system is regarded as a simple but effective solution because it improves the overall stiffness, strength and stability of the structure by welding shear studs. However, welding shear studs poses problems including electric shock and weld defects. Mechanical methods have emerged as an alternative to metallurgical methods for connecting the H-beam and shear connector. Four specimens were tested in order to compare the structural behavior of the proposed composite beams with that of the classical composite beam given the condition of horizontal loading. With the original composite beam (FCB-SB specimen) using stud bolts, hysteresis loops are stable, but its strength decreased with the crashing of the concrete slab around the column. The suggested composite beams using shear connectors also yielded stable hysteresis loops. Consequently, use of the suggested composite beams instead of the original composite beam are recommended.

A Study on the Shear performance of Joints for slab extension (슬래브확장을 위한 접합부의 전단성능에 관한 연구)

  • Ryu, Han-Gook;Park, Tae-Won;Chung, Lan;Lee, Sang-Hyun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.109-110
    • /
    • 2009
  • This study is to evaluate the shear performance of joint between existing and new slab in apartment remodeling construction for enlarging existing slab. The horizontal joint parameters are consisted by steel pipe cotter, shear reinforcement, H-steel, stud bolt, and round shear key by concrete. And joint specimens will be tested to evaluate the shear performance of these parameters. If the joint detail have sufficient strength, it will be proposed the basic form on the design of joint parts.

  • PDF

A Study for Structural Capacity Evaluation of Embedded Steel Plate Connected with Prestressed Concrete Beam to Build Large Space Educational Facilities (대공간 교육시설 축조를 위한 프리스트레스트 보에 사용되는 접합 강재의 성능평가에 대한 연구)

  • Lee, Kyoung-Hun
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.10 no.2
    • /
    • pp.1-7
    • /
    • 2011
  • An experimental study to evaluate structural capacity of an embedded plate connected with prestressed concrete beam was performed. Embedded steel plates and prestressed concrete beam were connected with stud-bolts at the ends of concrete beam specimens. About 1,000 kN concentrated load was applied at 450mm away from the end of beam specimen. A 3,000 kN capacity static Oil-jack was used to direct concentrated load. The maximum strain of stud-bolt recorded $90{\times}10^{-6}$(mm/mm) and wide width cracks were not founded. Any falling failures of concrete and large deformations were not founded either between steel plate and prestressed concrete specimen. As a result, construction performance can be improved using this embedded steel plate connection system apply to large space educational facilities.

Behavior of Stud Connection Subjected to both Constant Axial and Various Bending Moments (축력과 휨을 받는 스터드볼트 접합부의 거동에 관한 실험적 연구)

  • 김승훈;이태석;서수연;이리형;홍원기;백승대
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10a
    • /
    • pp.535-540
    • /
    • 2000
  • When the stud connection is considered as pin joint in the practical design, it is required to have high deformability. The rotational capacity as well as moment of the connection are evaluated through experimental works. Considered in the test are the reinforcement ratios of concrete member, the magnitude of axial force and connection details. It is shown that the stud connection has some quantity of moment capacity buy on the other hand it has low deformability. The strength and deformability of the connection depend on the axial force and reinforcements around the studs. The strength and ductility of the connection ate increased by using closed C-type.

  • PDF

A Study on the Behavior of Wall-Support Joint of Steel Plate-Concrete Structure (SC(강판-콘크리트)구조 브라켓 접합부 거동에 관한 연구)

  • Kim, Woo Bum;Kim, Kang Sik
    • Journal of Korean Society of Steel Construction
    • /
    • v.16 no.3 s.70
    • /
    • pp.377-385
    • /
    • 2004
  • An experimental and analytical study on the behavior of the wall-support joint in SC(steel plate-concrete) structure was performed. Nine full-scale specimens were tested with a horizontal monotonic load, all acting in the same plane, causing a uni-axial moment on the SC structure's wall-support beam joint. The main focus is to examine thenonlinear behavior and ultimate strength of the SC wall-support joint. The effects of parameters, such aslocation of support, thickness of the steel plate, and size of support, were studied. The yield strength and ultimate strength of the plate-concrete wall was defined by examining the load-deflection relationship, showing the tension membrane action.

A Study on Seismic Performance for CFT Square Column-to-Beam Connections Reinforced with Asymmetric Lower Diaphragms (이형 하부다이아프램으로 보강된 각형 CFT 기둥-보 접합부의 내진성능에 관한 연구)

  • Choi, Sung Mo;Yun, Yeo Sang;Kim, Yo Suk;Kim, Jin Ho
    • Journal of Korean Society of Steel Construction
    • /
    • v.15 no.5 s.66
    • /
    • pp.579-589
    • /
    • 2003
  • Most beam-to-column connections are symmetrically reinforced because of the reverse action caused by earthquakes. However, in weak-earthquake regions like Korea, asymmetrically reinforced connections could be used. In particular, the connections between concrete-filled tube (CFT) column and H-shape beam could be applied using a simplified lower diaphragm. The tensile capacity or Combined Cross Diaphragm for upper reinforcing was tested using a simple tension test. Four types for lower reinforcing combined Cross, none, horizontal T-bar, and vertical plate were tested using the ANSI/AISC SSPEC 2002 loading program. Horizontal T-bar and stud bolts in vertical flat, bar transmit tensile stress from the beam's bottom flange to filled concrete. All test specimens satisfied 0.01 radian inelastic rotational requirement in ordinary moment frame of AISC seismic provision. According to the results of the parametric studies simplified lower diaphragms demonstrated outstanding strength, stiffness, and plastic deformation capacity which could lead to more sufficient seismic performance in the field.