• Title/Summary/Keyword: 수행실적

Search Result 400, Processing Time 0.028 seconds

A Study of the Actual Construction Data Management System for Apartment Housing (공동주택의 공사실적자료 관리시스템 분석)

  • Park Hyung-Jae;Kim Tae-Hee;Kim Sun-kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.489-494
    • /
    • 2001
  • Actual construction data of completed projects can be utilized for the economic, time benefit of improving the efficiency on planning, designing, estimating and managing tasks in succeeding projects. But the lack of the system which accumulates and manages the actual data with standardized type, it has not performed well and stayed on early stage. It is required not only specific plan for the utilization of actual data but a construction information management system which collects and processes far-reaching data with standardized from based on facility. Therefore, the purpose of this study is to develop a construction information management system for Apartment housing ,which stored data along project feature database, actual cost database and actual database based on the Web. This effort can make an offer the clearness of dull construction market and the base of construction intelligence

  • PDF

진단 대상사업 수요분석을 통한 개선방안 연구

  • Choe, Un-Gyu;Gang, Won-Sik;Kim, Yeong-Du
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2013.06a
    • /
    • pp.521-523
    • /
    • 2013
  • 해상교통안전진단 제도 시행관련, 경과 진행에 따른 실적 분석 및 소요 분석을 통한 개선점 도출이 현 시점에는 시행된 바가 없는 상태로 제도의 원활한 운영 및 개선점 발굴을 위해선 연구 필요성이 있다. 따라서 수행된 진단 실적, 사업별 특성, 진단 특성을 분석하고 장래 진단 수요량을 예측 분석하여 진단 수행에 따른 개선점을 도출하고 장래 상황 예측을 통한 해상교통안전진단 효율화 자료로 사용하고자 한다. 그에 따라 본 연구에서는 진단실적 분석, 진단수행 개선점 분석, 장래 진단 수요분석, 진단 수요에 따른 개선점 분석의 4단계로 분류하고 관련 내용을 연구, 분석, 검토 기술하였다.

  • PDF

Performance Management through Time-Cost Integration in Construction Project (비용-일정 통합관리를 통한 건축공사 실적관리)

  • Kim Dong-Jin;Lim Hyoung Chul;Choi Jung Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-382
    • /
    • 2001
  • In domestic construction industry, time and cost has been managed separately in most cases. Usually projects are managed focused on cost, so time is not yet managed systematically. Project performance in these managemental situation can not be assessed correctly. This would cause project delay, cost overrun, productivity loss. Therefore it is needed to adopt earned value concept, an approach used in the management and control of project costs and schedules. Using this EV concept through time-cost integration, project can be managed properly based on the consistency, predictability, and reliability of the performance data. This paper proposed time and cost integration process, proper PMT method, and practical performance management model through time and cost integration.

  • PDF

A Study on the Improvement of Historical Data For Knowledge Management in Construction Project (지식관리(KM)를 위한 건설공사 실적자료관리 개선방안 연구)

  • Lee Tai Sik;Song Jae Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.468-471
    • /
    • 2001
  • The importance of early project planning is broadly recognized for construction projects. From the planning step, If extensive historical data related with the project is applied effectively, It can be major resource for estimating cost and project scope. However, The accumulation, analysis, and application of historical data is not sufficient in Korea. So useful information of construction project has disappeared. In order to solve the problems, Project Historical Data Management Systems is need to be developed. The purpose of this study is to analyze current problems and to find the method to utilize historical data in similar project.

  • PDF

Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation (물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안)

  • Jeong, Ki-Chang;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.540-545
    • /
    • 2008
  • The purpose of this study is to suggest problems and improving plan of process of calculating escalation rate of the Historical Cost by price fluctuation. In order to implement this research, we analyzed problems by calculating the rate of price fluctuation with Historical Cost and measurement applying method making on-site with historical cost data were included as samples and suggested improving plan to the adjustment of contract cost. The results of research according to this are same as followings:1) Of all construction details, it is more appropriate to calculate price fluctuation by applying measurement method to the contents of historical cost unit. 2) To avoid confusion in calculating method, it was indicated that amendment in part should be achieved in order to calculate by measuring the part of calculating escalation rate of Historical Cost at related law and regulation.

  • PDF

AIS 데이터를 활용한 정량적인 선박정보제공 실적 산정에 관한 연구

  • Kim, Gwang-Il;Lee, Seung-Hui;Jeong, Jung-Sik
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2016.05a
    • /
    • pp.252-254
    • /
    • 2016
  • VTS에서 정보제공실적은 대내 외적으로 많이 활용되며, VTS 성과평가 자료로 중요하게 활용되고 있다. 지금까지 VTS에서 산정되는 정보제공 실적은 대부분 관제사가 관제업무 중 정보제공 발생시 관제일지에 수기로 기록하고 있으나, 선박관제 및 선박모니터링, PORT-MIS 등 여러 업무를 수행하고 있는 관제사가 정보제공 실적을 일일이 기록하는데 한계가 있다. 본 연구에서는 객관적인 정보제공 실적 산출을 위해 VHF 음성 자료 및 선박간 조우데이터를 분석하여 선박교통데이터 기반의 선박 안전정보 제공 회귀모형식을 도출하고자 한다.

  • PDF

통계

  • Korea Radioisotope Association
    • Radioisotope journal
    • /
    • v.14 no.3
    • /
    • pp.146-148
    • /
    • 1999
  • PDF

The Comparison of the Calculations for the Lightning Outage Hate of Transmission Line Using the EPRI-Flash program and CRIEPI-LORP Program (EPRI-FLASH 및 CRIEPI-LORP를 이용한 송전선로의 뇌사고율 예측계산 비교)

  • Kang, Y.W.;Kwak, J.S.;Woo, J.W.;Kweon, D.J.;Shim, E.B.;Jung, G.J.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07c
    • /
    • pp.1635-1637
    • /
    • 2003
  • 송전선의 뇌사고율은 뇌방전 현상, 송전선의 써지 전달 현상, 아킹혼 사이의 섬락 현상 등 다양한 현상이 관련된다. 송전선의 내뢰설계 목표는 이러한 자연현상 및 물리적인 현상이 편차를 포함하고 있다는 것을 인식하고, 가능한 한 정확도가 높은 뇌사고율을 예측을 수행하고 허용 가능한 뇌사고율을 산정하여 송전선로 설계시 반영하는 것이다. 이러한 예측 계산을 위해 한전에서는 EPRI에서 개발한 FLASH 프로그램을 기본으로 사용해 왔으며, 이 예측계산법의 타당성은 예측 사고율과 사고 실적과의 비교에 의해 검토되어야 한다. 한전에서는 과거 10년간의 뇌사고 실적과 FLASH 프로그램으로 계산한 예측 사고율이 차이가 많이 나타나고 있어, FLASH 프로그램의 예측 계산법의 타당성에 의문을 제기하고 있는 상황이다. 일본 전력회사들은 뇌사고율을 예측 계산하기 위하여 1988년에 전력중앙연구소에서 개발한 프로그램을 사용하여 왔으며, 최근에 사고 실적과의 비교 및 관련 연구를 수행하여 예측 계산 프로그램에 사용되는 파라메타를 수정 보완한 LORP2000-1을 완성하였다. 본 논문에서는 지리, 기후적으로 한국과 유사한 일본의 자연현상을 반영한 LORP 프로그램의 예측계산법이 한전 송전선로의 뇌사고율 예측 계산에 적용 가능성을 사고 실적과의 비교를 통해 검토하였다.

  • PDF

Development and application of long-term reservoir operation rule for single operation (댐의 담독운영을 위한 장기 저수지운영률 도출 및 평가)

  • Kang, Shin-Uk;Lee, Sang-Ho;Kim, Hyeon-Sik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.233-233
    • /
    • 2011
  • 필요한 수자원을 추가확보하기 위한 댐 건설이 갈수록 어려워짐에 따라 이미 건설된 댐을 최대한 활용하는 과학적 저수지운영 방안이 필요하다. 또한 댐운영자가 쉽게 실무에 적용할 수 있는 방법이어야 한다. 본 연구의 목적은 댐관리자가 이해하기 쉽고 사용하기 쉬운 장기 저수지운영 방안을 개발하고자 하는 것이다. 수위구간별 저수지운영을 위한 운영률을 구성하고 이에 따른 순단위 저수지운영 모형을 구축하였다. 다변량 추계학적 모의발생기법을 사용하여 댐 유입량을 모의 발생하였다. 저수지운영의 수위구간을 결정하기 위한 최적화 방법으로 메타휴리스틱 방법으로 차원변화 탐색기법을 선정하였다. 안동댐의 단독운영을 위한 수위구간별 저수지운영률을 도출하여 저수지 모의운영을 수행하고 기존의 운영실적과 모의결과를 저수지운영 평가기준에 따라 비교하여 평가하였다. 안동댐의 단독운영 결과 모의된 저수위는 실적 저수위보다 전반적으로 높게 유지되었고, 모의 발전량이 실적 발전량보다 평균적으로 높음을 볼 수 있었다. 안동댐의 실적 발전량 평균값은 124.81 GWh이며, 모의결과의 발전량은 131.01 GWh이었다. 모의 발전량이 전반적으로 높은 이유는 방류량이 적은 상황에서 저수위를 높게 유지하여 발전효율을 높게 한 것이 주된 이유라고 사료된다. 안동댐의 실적과 모의 결과를 3 가지 저수지운영 평가기준으로 평가한 결과, 실패한 횟수는 실적이 554 회, 모의결과는 426 회이었다. 또한 2 순 연속하여 실패가 발생한 횟수는 각각 71회, 48 회이었고, 최대 연속 실패는 각각 52 순, 51 순이었다. 또한 총운영 기간에 대한 성공 횟수의 비율을 나타내는 신뢰도는 실적은 0.53, 모의된 결과는 0.64로 약 9 %의 차이를 보였다. 취약도는 실적이 $12.69\times10^6\;m^3$, 모의된 결과가 $5.14\times10^6\;m^3$$7.55\times10^6\;m^3$의 차이를 보였다. 회복도는 실적이 0.21, 모의 결과가 0.13으로 모의결과가 0.08 낮은 것으로 나타났다. 도출된 장기 저수지운영률을 안동댐의 단독운영에 적용한 결과 실적보다 본 연구에서 개발한 방법론에 의한 모의운영이 공급량, 발전량, 저수지 운영평가 통계량에서 나은 결과를 보였다.

  • PDF

An Analysis of Differences between Contract Costs Estimated by the Actual-Cost-Data-based Method and the Quantity-based Method (실적공사비적산제도 도입에 따른 도급금액 변동 분석)

  • Park Chang-Bae;Kim Dong-Young;Kim Ju-Hyung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.510-514
    • /
    • 2004
  • This research is a preliminary one to investigate transitional problems of actual-cost-date-based contract cost estimation method and suggestions for counteracting them. As parts of it, in this paper, the brief background and methods of the new method and contract costs estimated by introducing it are presented. The results of five projects' contract costs are compared to those estimated by the conventional quantity-based method. Comparison of the both is conducted in terms of total contract costs and contract costs according to type of sub-contracts. Finally, the propositional differences of the later to the former are analysed.

  • PDF