• Title/Summary/Keyword: 수주액

Search Result 61, Processing Time 0.029 seconds

Interaction Analysis between Construction Business Indicators and Business Performance Indicators of Specialty Contractors providing Labors (노무중심 전문건설업체의 건설경기지표와 경영성과지표의 상관성 분석)

  • Kim, Nam-Sik;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1893-1899
    • /
    • 2014
  • This study is to suggest strategies of specialty contractors that provide labors oriented engineering service by interaction analysis between construction business indicators and business performance indicators. For specialty contractors that mainly provides labor oriented engineering service, the amount of construction orders imposes lasting impact to the turnover ratio of current assets supposedly because they are operating current assets to secure labor. In other words, this type of specialty contractors are focused on mobilization of labor not materials or equipment. So, it is determined that they will be able to increase revenue by operating current assets to address current liabilities and labor mobilization.

An Analysis of the International Competitiveness of Productivity in the Korean Construction Industry (한국 건설 산업 생산성의 국제경쟁력 분석)

  • Won, Jong-Sung;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.75-83
    • /
    • 2008
  • In the previous comparative studies of international competitiveness conducted before 2003, Korean construction productivity had been estimated to be lower (or poor) than that of developed countries such as US, UK, and Japan. However, the amount of international contracts Korean has won increased substantially, and Korean construction has progressed with creating two skyscrapers such as Petronas Tower and Burj Dubai. At this point we need to reevaluate what we are capable of. In this paper, we evaluated international competitiveness of our construction industry comparing to advanced countries by analyzing labor productivity. For evaluating construction competitiveness we measured labor productivity using the value of construction work in US dollar per hour based on domestic and foreign statistical data and analyzing completion days per a story and the ratio of underground floors to ground floors of buildings in Korea and Japan. As a result, although our construction productivity is not yet competitive with the US and Japan yet, we excel the UK.

Quantification of a Global Construction Core Competencies for Korean Construction/Engineering Firms (국내 건설업체의 해외 진출역량 계량화 연구)

  • Kim, Sang-Bum;Kim, Yong-Bi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2541-2549
    • /
    • 2013
  • The Construction industry has been dealing with much trouble due to global economic recession and domestic political trends emphasizing on welfare than development. Consequently, domestic construction market has been dramatically shrunk during the last a few years, and international market has become the only potential solution for the industry. However, there has been lack of efforts in developing a quantified measure of global competencies for Korean engineering and construction organizations. This study attempted to develop quantified indices for Korean engineering and construction contractors with which the level of global construction competencies can be objectively monitored. In doing so, a survey questionnaire was developed to identify relative importances of core competency elements which were derived from extensive literature reviews and experts interviews. AHP (Analytic Hierarchy Process) was employed as a main analysis method in developing quantification measures. The analysis results reveal little differences in competency requirements between engineering and construction firms and it implies that the global market becomes more integrated and requires a total solution for a construction project. The developed core competency measures can be used to quantify the level of preparedness of Korean engineering and construction firms at the time of evaluation and also be used as a basis for performance benchmarking indicators if they are compared with business showings.

Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects (산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가)

  • Lee, Kyusung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.140-151
    • /
    • 2013
  • In 2011 and 2012, Korean construction firms awarded around $ 64.5. Billion each year from the overseas market in 2011. This contract value accounted for overwhelming portion of total overseas construction contract values, and this growth is expected to continue for the next decade. However, contract scopes awarded to the Korean construction firms mainly involve detailed design and construction phases due to their competitiveness for the construction techniques. In other words, front-end-engineering-design and construction project management are not considered part of core business due to the lack of project management skills and experience. The researchers focused on development of construction sequence model required to improve construction planning and scheduling skills for the Korean construction firms. The model identifies critical work items and the sequence throughout project execution process. In addition, the researchers developed a risk evaluation method by applying fuzzy theory to the critical construction activities for the industrial plant construction projects. Developed methodology will help project practitioners to develop project schedule in a timely and effe ctive manner and evaluate project risks associated with scheduling process for the industrial plant construction projects.

An Analysis of Concentrate Competency in Bidding Process for Overseas Project of Domestic Construction Companies (국내건설기업의 해외 프로젝트 입찰단계 우선집중역량 분석)

  • Kim, Ji Hyung;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.23-30
    • /
    • 2014
  • Overseas construction orders of domestic companies had been increased significantly in a short period from $10.9 billion in 2005 to $64.9 billion in 2012. However experts are concerned that quality of growth will not support quantitative growth. This study suggest concentrate competencies for not only winning in bid but also successful execution of domestic companies. 4 Steps which are Pre-Marketing, Bid-Preparation, Bidding, Contract Phase are defined for competency assessment. After drawing specific tasks by phase, survey asking importance and capability of the tasks to the person in charge of bidding and site was conducted by utilizing Likert 7 point scale. According to the result of IPA analysis, domestic construction companies need to ensure internal competencies; Project risk review, Bid team organization, and external competencies; Client needs grasp, Localization strategy, Cooperation establishment. Hearafter domestic construction companies will be able to utilize the result of the study for setting bidding strategy for winning in bid and improving earning rate.

A Study on the Legal Liabilities of Contractor as a Delay in the Product Delivery on the Offshore Plant Construction Contract (해양플랜트공사계약상 제조물인도지연에 따른 당사자의 법적 책임에 관한 고찰)

  • Jin, Ho-Hyun
    • MARITIME LAW REVIEW
    • /
    • v.29 no.2
    • /
    • pp.115-144
    • /
    • 2017
  • The impact of the global financial crisis, which began in the United States in 2007, had a major impact on the domestic shipping and shipbuilding industries. In this regard, the domestic shipyard has established an order-taking strategy in several ways as an alternative to lowering the amount of construction of commercial vessels due to deterioration of the shipping industry, and selected industrial sector was the offshore plant sector. However, the domestic shipyard has under performed the offshore plant in order to just increase sales and secure work without any risk analysis for EPC contracts. As a result, the shipyard has been charged more than the initial contract price with the offshore plant contractor, or the shipyard has become a legal issue requiring payment of liquidated damages due to delays in delivery of the product. The main legal disputes are caused by the thorough risk analysis and the inexperience of process control that can occur during offshore plant construction. and In particular, there is no sufficient review of the unequivocal provisions in the contract as an element of risk management. There is no human resource to review these contractual clauses. Therefore, this study identifies the existence of specific risks that could lead to delays in offshore plant construction, and examined the existence of any unequivocal clauses in contracts for offshore plant construction. and also discussed how the toxic clause applies to the actual parties and how the concrete risk factors in the construction contracts are transferred and expressed by referring to the interviews with the project manager of the domestic shipyard and the previous research. As a result, This paper examined the legal liability of the contracting parties regarding delayed delivery of the products due to the offshore plant construction contract. And to improve the domestic shipbuilding industry.

Transition and prospect of quantitative indexes for integrated water management (통합물관리 정량지표의 변천과 전망)

  • Jae Sung Jung;Jin Keun Song
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.441-441
    • /
    • 2023
  • 통합물관리는 2000년 이전부터 필요성이 논의되다가 2019년 물관리기본법이 제정·시행되면서 수량, 수질, 수생태, 방재 등 분야의 물관리 통합이 단계적으로 추진되고 있다. 수자원장기종합계획, 물환경관리 기본계획, 국가물관리기본계획, 4대강별 유역물관리종합계획 등이 수립되거나 수립중에 있다. 2021년 6월에 수립된 국가물관리기본계획에서는 통합물관리 정량지표들을 물환경, 물이용, 물안전, 물산업, 거버넌스의 5개 분야로 구분하여 제시하였고, 4대강 유역물관리종합계획(안)에서는 국가기본계획의 지표들을 근간으로 유역별 특성을 고려한 정량지표를 설정하고 있다. 수자원장기종합계획부터 유역물관리종합계획까지 통합물관리 정량지표들의 변천 내용과 현황을 검토하였다. 수자원장기종합계획(2016~2020)의 전략과 목표는 "①맑은 물 공급: 급수보급율, 관망 복선화율, 댐 부족량 공급기준, 비상급수 피해인구, 스마트시티 음용률, 누수율 저감, 물 기본법 제정, ②홍수안전 기반구축: 하천기본계획, 하천정비, 수해금액, 도시하천 종합치수대책 수립, 국가하천 홍수예보 지점, 홍수예보시간 단축지점 비율, ③친수환경 조성: 하천유지유량, 하천 이용객, 어류종 및 철새종 증가, ④수자원산업 및 기술개발: 일자리, 수자원산업 육성제도, 해외수주액, 외국 MOU, 국제회의, 남북공유하천 협의"이었다. 물환경관리 기본계획(2016~2025)의 전략과 목표는 "①물순환 체계: 불투수면적률 25% 초과지역, ②깨끗한 물 확보: 상수원 수질달성, ③생태계 서비스 증진: 수생태계 건강성 달성, ④물환경 기반 조성: 산업폐수 유해물질 배출저감, 상수원 4대강 보의 총인 농도와 남조류 세포수, ⑤경제·문화적 가치 창출: 국민체감 만족도"이었다. 국가물관리기본계획에서는 "①물환경: 하천·호소 목표수질 달성률, 수생태계 건강성 B등급 이상 비율, ②물이용: 수돗물 만족률-직·간접 음용률, 노후 상수관로-하수관로 개량, ③물안전: 가뭄피해 인구, 홍수피해 인구-피해액, 댐안전성 강화율, ④물산업: 물관리 R&D 예산, 수량·수질·수생태 통합측정 중권역 비율, 물산업 매출액의 수출액 비중, 한국 주도 국제협력 의제, ⑤거버넌스: 미정"을 계획지표로 하였다. 유역종합계획에서는 4대강별로 거버넌스를 포함하여, "①물환경: 국가계획지표, 주요 상수원 수질, ②물이용: 노후 상하수관로 개량, 지방상수도 유수율, ③물안전: 한해 인구, 수해 인구-피해액, 하천정비율, ④물산업: 물산업 일자리 창출, ⑤거버넌스: 물포럼, 시민참여활동"을 정량지표로 고려하고 있다.

  • PDF

A Study on the Effect and Improvement Direction of the Credit Rating of Large Construction Firms by the Reinforced Real Estate Regulations and the Raising of the Base Rate (정부 부동산규제 강화와 기준금리 인상이 대형건설사 신용등급에 미치는 영향과 개선방향에 관한 연구)

  • Lee, YunHong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.90-102
    • /
    • 2018
  • In preparation of the increase in the domestic debts and the rise in the US interest rate, the Korean government has started to strengthen the regulation on the property market since 2017. So, it is likely that the sales in the domestic construction market would be decreased. Even in the overseas plant projects market, as there has been the continuous increase in the cost and the resulting increase in the losses, it looks hard for the large construction companies to keep their credit ratings as they are now. This study is designed to check Korean government's property policy and any possible problems caused by the overseas and domestic economic environment, which include the property market policy, interest rate, rise in the property price and lackluster sales in housing market. It showed the change in the credit ratings by finding out the sales, work capability, sales in non-governmental projects, operating profits and PF contingency liabilities. For this study, the questionnaires were sent to 30 practical experts to analyze the effect of the risk factor on the outside credit rating of large construction companies.

Development of Construction Benchmarking for Oversea Industrial Projects (해외플랜트 공사 벤치마킹 프로그램 개발)

  • Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1165-1171
    • /
    • 2013
  • The oversea construction contract amount has sharply increased since 2003. The contractor's capability for EPC and project management is a key factor for a successful industrial construction project. Construction performance measurement and evaluation is needed to improve contractor's project management capability. Therefore, this paper proposes the construction performance benchmarking program for oversea industrial projects. Performance metrics consists of project cost, schedule, quality, and safety. Data from 10 oversea industrial projects were collected and analyzed. Also, this paper describes the process for development of the benchmarking program and lessons learned from industry are summarized. Finally, this paper recommends how sustainable benchmarking program should be established and implemented.

Causal Relationships between Vessel Export and Economic Growth in Korean Shipbuilding Industry (우리나라 조선산업에서 선박수출과 경제성장의 인과성)

  • Kim, Chang-Beom
    • Journal of Korea Port Economic Association
    • /
    • v.24 no.1
    • /
    • pp.1-10
    • /
    • 2008
  • This paper analyses the dynamic causal relationship between vessel export and economic growth using annual data over the period from 1977 to 2006. Tests for ADF unit-roots, the dynamic vector using Johansen's multiple cointegration procedure, dynamic vector error correction model and impulse response function are presented. The findings of the Granger test suggest that vessel export Granger-causes economic growth in the short-run and economic growth Granger-causes exports in the short and long-run. The empirical results of impulse-response analysis show that the vessel export to a shock in real GDP responds positively and the real GDP responds positively to the shocks in vessel export. Also, the results indicate that the impact of vessel export shock on the real GDP is short-lived.

  • PDF