• Title/Summary/Keyword: 수정진도

Search Result 16, Processing Time 0.027 seconds

The Evaluation of Seismic Performance on the Concrete Dam of Analysis Method (해석방법에 따른 콘크리트댐의 내진성능평가)

  • 임정열;이종욱;오병현
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.7 no.5
    • /
    • pp.1-9
    • /
    • 2003
  • The seismic design of the domestic concrete dams has done by seismic coefficient method considering inertia force, but this method has defect not reflect dynamic properties, as a conservative design method. Therefore, it is necessary for seismic design of dam to consider dynamic properties. Also, concrete dam evaluation of seismic performance has done by seismic coefficient method - in fact, it may done by dynamic analysis - that has many problems when applied to the domestic criteria. This study make a comparative analysis for result from seismic design and evaluation of seismic performance by seismic coefficient method, modified seismic coefficient method, and dynamic analysis method.

The Evaluation for Stability at Joint Part in Composition Dam (복합댐 접합부의 안정성 평가)

  • Kim, Jae-Hong;Oh, Byung-Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.3
    • /
    • pp.155-166
    • /
    • 2008
  • Research dam is consisted of concrete gravity dam that right bank department is built to concrete material, left bank department is composition dam that is consisted of rockfill dam that consist of rockfill material In domestic case, composition dam form of storage of water facilities of about 17,000 does not exist hardly in dam of irrigation water industry drinking water purpose that manage local government or other institution, Even if exist, is real condition that there is total nonexistence administrator fare of facilities, Choose unique dam of domestic multipurpose dam and analyzed conduct special quality of con'c gravity dam and rockfill dam joint part To analyze dynamic conduct special quality of composition dam by analytic method in this research, Do modelling via axis of dam and achieved static(Psuedo-static, modify Psuedo-static) and dynamic analysis, When achieving earthquake response analysis, analyzed seismic response analysis between concrete part and rockfill's part.

Evaluation of the Application and Analysis Method at Seismic Design of Dam (댐의 내진설계시 해석방법과 그 적용성 평가)

  • Hwang, Seong-Chun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.9
    • /
    • pp.4239-4249
    • /
    • 2011
  • In the country with frequent earthquakes like Japan, resistance to earthquake is assessed on the basis that Dam body's Face slab is destroyed by concentrated stress. In our country this kind of modeling and analysis is not yet definitely established. This paper performed pseudo static analysis and dynamic analysis for CFRD and evaluated reliability with the results of Shaking Table Test. The Seismic coefficient method, modified seismic coefficient method, Newmark method of Pseudo-static analysis and frequency domain response analysis, time domain history analysis of dinamic analysis were used. The analysis results were differ between analysis method, but the trends of acceleration and displacement were good agreement with the results of shaking table test.

Hydroelastic Vibration Analysis of Three Dimensional Submerged Structure (3차원 접수구조물의 유체탄성 진동해석)

  • 정기태;강호승;김영복
    • Computational Structural Engineering
    • /
    • v.4 no.1
    • /
    • pp.20-27
    • /
    • 1991
  • 본 논문에서는 유체-구조 상호작용해석의 일종의 3차원 접수구조물의 진동해석을 효과적으로 수행하기 위한 해석방법을 제시하기 위하여 동적재해석기법을 검토하였다. 접수구조물의 유한구조 상호작용해석 결과는 구조진동의 관심 주파수역에서는 3차원 연성 부가수질량으로 표현되는 관성력으로 나타난다. 따라서 구조질량행렬에 부가수질량 행렬이 더해져서 전체 관성력으로 표현된다. 이 부가수질량을 추가질량으로 보고 재해석기법을 응용하는 방법을 수치실험을 통해 검증하였다. 이 때 재해석기법이 갖추어야 할 조건은 원구조의 질량과 거의 같은 정도의 질량이 추가되고 또한 완전 연성질량이 추가된 경우에도 정확한 해를 주어야 한다는 것이다. 이를 검증하기 위해 직접재해석기법과 섭동법을 이용한 재해석기법으로 4질량 스프링지지구조에 대한 해석을 수행한 결과 직접재해석기법의 응용이 적합함을 쉽게 입증할 수 있었다. 접수구조물의 예로는 3차원 잠수주상체에 대해 접수진동해석을 수행하였으며 그 결과 선체진동해석에 전통적으로 이용되고 있는 2차원 부가수질량과 3차원 수정계수를 사용한 기준차수법에서는 수지모드와 수평-비틔 연성모드와 같이 서로 독립적인 모드에 대해서는 따로 진동해석을 수행해 주어야 하는 단점이 발견되었다. 이 단점을 보완한 각 모드의 3차원 수정계수행렬을 이용한 재해석기법을 도입하여 모드에 상관없이 동시에 해를 구할 수 있었다. 그러나, 이 방법은 3차원 수정계수가 구해져 있는 경우에 한해서만 적용가능하며 실제 선체진동의 경우에는 10Hz 미만의 저차 주선체 진동에 한해서만 적용가능한 방법이다. 고차의 진도옴드에는 3차원 수정계수를 구할 수 없기 때문에 유체-구조 상호작용 해석결과로부터 얻은 3차원 연성 부가수질량을 이용하게 되며 이 때 이 행렬이 접수구조 표면의 전 자유도와 연성되어 있기 때문에 방대한 방정식을 푸어야 하지만 직접재해석기법을 적용함으로써 정확한 해를 구할 수 있었다. 또한 3차원 부가수질량을 이용한 직접재해석기법은 종래의 2차원 부가수질량과 3차원 수정계수를 이용한 방법에 비해 해석시간 면에서도 전혀 불리한 점이 없는 경제적 방법임이 밝혀졌다. 앞으로 Slamming 혹은 수중폭파 등의 충격하중에 의한 천이 구조응답 해석을 위한 효과적인 방법에 대해서도 연구결과를 발표할 계획이다.

  • PDF

Slope Stability Analysis Using Modified Seismic Intensity Method During Earthquake (수정진도법에 의한 지진시의 사면안정해석에 관하여)

  • 오병현
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2000.10a
    • /
    • pp.124-131
    • /
    • 2000
  • Numerical analysis of slop stability is carried out using seismic intensity, modified seismic intensity, and response seismic coefficient methods. It is found by comparing each of method that minimum safety factor precedes the required safety factor. It is also proved during analysis that most conservative method is the earthquake response analysis method, next is the response seismic coefficient method, and last one is the seismic intensity method. Usually, seismic intensity method is applied in analysis of slop stability. However, in view of safety factor, modified seismic intensity method is more conservative than seismic intensity method. Also modified seismic intensity method is appropriate when height of structure analyzed is high enough.

  • PDF

The Comparision of Analysis Methods in dynamic Design of Dam based on Shaking Table tests (진동대시험에 근거한 댐의 내진설계시 해석 방법의 비교)

  • Hwang, Seong-Choon;Oh, Byung-Hyun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.05a
    • /
    • pp.732-737
    • /
    • 2005
  • This paper performed pseudo static analysis and dynamic analysis for CFRD and evaluated reliability with the results of Shaking Table Test. The Seismic coefficient method, modified seismic coefficient method, Newmark method of Pseudo static analysis and frequency domain response analysis, time domain history analysis of dynamic analysis were used. The analysis results were differ between analysis method, but the trends of acceleration and displacement were good agreement with the results of shaking table test.

  • PDF

Slope Stability Analysis of Filldams by Modified Seismic Intensity Method (수정진도법에 의한 댐사면 안정해석)

  • 신동훈;이종욱
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.223-228
    • /
    • 2000
  • The current slope stability analysis of a filldam is based on the limit equilibrium method, and in calculation of safety factor during earthquake, adopts the seismic intensity method in which it considers a uniform seismic force from dam foundation to crest. However the observed behaviour of filldam during earthquake shows some different behaviour in that at the crest the measured acceleration is usually several times the ground acceleration. In this study, slope stability calculations of a filldam are provided based on the modified seismic intensity method, which can take into account the amplification phenomena of acceleration in the upper part of dam. And also the results of calculations are compared with that of current seismic intensity method.

  • PDF

The Creep-Rupture Life of Al Alloy (Al합금의 크리프 파단수명에 관한 연구)

  • Bae, Choon-Ik;Chin, Do-Hun
    • Journal of the Korean Society of Mechanical Technology
    • /
    • v.13 no.4
    • /
    • pp.125-130
    • /
    • 2011
  • Technological mode progress demands the use of materials at high temperature and pressure. Constant load creep tests have been carried out over the range of stresses at high temperatures. One of the most critical factors in considering such applications as the most critical one is the creep behavior. In order to investigate the creep behavior in this study, the stress exponents during creep were determined over the temperature range of $275^{\circ}C$ to $325^{\circ}C$ and the stress range of 36MPa to 72MPa. The applicability of modified Monkman-Grant relationship was also discussed.

Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM (이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 -)

  • Rho, Juhee;Park, Moonseo;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.11-19
    • /
    • 2020
  • A daily progress monitoring and further schedule management of a construction project have a significant impact on the construction manager's decision making in schedule change and controlling field operation. However, a current site monitoring method highly relies on the manually recorded daily-log book by the person in charge of the work. For this reason, it is difficult to take a detached view and sometimes human error such as omission of contents may occur. In order to resolve these problems, previous researches have developed automated site monitoring method with the object recognition-based visualization or BIM data creation. Despite of the research results along with the related technology development, there are limitations in application targeting the practical construction projects due to the constraints in the experimental methods that assume the fixed equipment at a specific location. To overcome these limitations, some smart devices carried by the field workers can be employed as a medium for data creation. Specifically, the extracted information from the site picture by object recognition technology of CNN model, and positional information by GIPS are applied to update 4D BIM data. A standard CNN model is developed and BIM data modification experiments are conducted with the collected data to validate the research suggestion. Based on the experimental results, it is confirmed that the methods and performance are applicable to the construction site management and further it is expected to contribute speedy and precise data creation with the application of automated progress monitoring methods.

Adaptability of Process Evaluation in New and Renewable Energy Dissemination Program (신재생에너지 보급사업 평가에 있어 Process evaluation 적용 가능성 고찰)

  • Kim, Ji-Hyo;Park, Joo-Young;Heo, Eun-Nyeong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.302-302
    • /
    • 2009
  • 미국 DOE(Department of energy) 산하 EERE(the office of energy efficiency and renewable energy)에서는 시행되고 있는 일반 프로그램 평가(General Program Evaluation) 중 하나인 과정 평가(Process Evaluation)는 프로그램의 수행의 효율성과 유효성을 평가하기 위해 수행된다. EERE에서는 프로그램 별로 매 2~3년에 한번, 프로그램의 진행에 장애요인을 시행하기 위해 부정기적으로 과정평가를 수행하여 프로그램의 진행과정을 개선할 것을 제안하고 있다. 과정평가의 방법론으로는 사례연구(case study), 내용분석(content analysis), 메타평가(meta evaluation), 델파이분석(delphi-analysis), 외부 동료평가(peer review) 등의 방법론이 사용될 수 있다. 특히, EERE는 "Peer Review Guide(2004)"을 발간하여 과정평가에서 있어 외부 동료평가의 방법론을 정리하였다. 과정평가를 통해 프로그램 수행결과의 중간점검과 동시에 프로그램의 발전을 위하 전문가의 제언을 수집할 수 있다. 따라서 과정평가의 결과는 프로그램의 개선에 도움을 줄 수 있으며, 장기 과제인 경우 프로그램 관리에 효과적으로 사용될 수 있다. 우리나라의 경우, 사업 수행 시 '진도보고'나 '중간결과 발표' 등을 통하여 동일한 내용의 평가를 시행하고 있으나, 평가의 항목.시기.예산 등에 대한 지침(guideline)이 구축되었다고 볼 수 없는 상황이다. 한국의 신재생에너지 보급사업은 국가적인 중요도, 투입예산의 규모 및 수행기간 등을 고려할 때 과정평가를 통해 정기적으로 사업의 진행과정을 점검할 필요가 있다 하겠다. 따라서 신재생에너지 분야의 사업의 관리에 적용될 수 있는 EERE의 과정평가를 한국의 상황에 맞게 수정하고 이를 정규적으로 시행하는 방안에 대한 논의가 필요하다 하겠다.

  • PDF