• Title/Summary/Keyword: 수력 효율

Search Result 143, Processing Time 0.028 seconds

Hydraulic Performance Characteristics of Vertical-Axis Propeller Turbine Model (일체형 입축 프로펠러수차 모형의 수력학적 성능특성)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.10a
    • /
    • pp.379-382
    • /
    • 2008
  • The propeller type hydro turbine model with vertical axis has been tested and analized. The blade angle of runner of turbine model were designed to be varied according to the condition of head and flowrate. When the changes in head and output were comparatively large, the efficiency drop were small, so the efficiency characteristics and stability of the entire operating condition were maintained in good condition. These results showed that the developed model in this study will be suitable for small hydro power stations with large changes in head and load such as sewage treatment plants and agricultural reservoirs.

  • PDF

Hydraulic Performance of Vertical Axis Propeller Type Hydro Turbine for Small Hydropower Plants (수소력발전용 입축 프로펠러 수차의 수력학적 성능특성 분석)

  • Lee, Chul-Hyung;Park, Wan-Soon
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.14 no.2
    • /
    • pp.171-176
    • /
    • 2003
  • The propeller type hydro turbine model with vertical axis has been tested and analyzed. The blade angle of turbine model were designed to be varied according to the condition of head and flowrate. When the changes in head and output were comparatively large, the efficiency drop were small, so the efficiency characteristics and stability of the entire operating condition were maintained in good condition. These results showed that the developed model in this study will be suitable for small hydro power stations with large changes in head and load such as sewage treatment plants and agricultural reservoirs.

Development of App. for Visualization of Micro Hydro Power Potential (초소수력 발전 잠재량의 가시화를 위한 앱 개발)

  • Kim, Dong Hyun;Yang, Chang Wook;Lee, Seung Oh
    • The Journal of the Korea Contents Association
    • /
    • v.17 no.4
    • /
    • pp.1-11
    • /
    • 2017
  • Interest in all kinds of renewable energies has been highly increased while the micro-small-hydro power(MSHP) development has shown relatively slowly growth because of the negative public recognition about dam site development. It is, however, announced that the micro-SHP shows higher energy conversion efficiency compared to other renewable energies and does not emit any carbon dioxide. Thus, it is concerned about the development and application of micro-SHP as an alternative energy. In this study, the application for Android was exploited with Eclipse to visualize readily the potential realizable amount of hydropower by micro-SHP. With this application, we can select the region from the map, obtain the design discharge of the selected site was calculated with HEC-HMS, presented by U.S. Army of Corp. and perform the simply economic analysis in sequence. Yeongwol in Gangwon-do Province, Korea was chosen as the target area since historically abundant precipitation was found and it is possible to obtain fundamental data from WAMIS. Results from this study could be expanded the whole region of Korea. Also, the initial investment cost would be reduced if the location for micro-SHP would be determined properly, because this application can help us easily select and examine the potential micro-SHP sites without on-the-spot visit.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

A Study on the Hydraulic Experiments of Modi Khola Hydroelectric in Nepal (네팔 Modi Khola 수력발전소 수리모형실험 연구)

  • 선우중호;박창근
    • Water for future
    • /
    • v.28 no.1
    • /
    • pp.107-120
    • /
    • 1995
  • This study is concerned with the hydraulic experiments of Modi Khola Hydroelectric in Nepal. The experimental domain consists of the intake structure and the settling basin. The intake structure was made by the undistorted model with the scale of 1:20, the settling basin by the distorted model with the scale of 1:10(vertical) and 1:15(horizontal). Based on the movable bed model theory, the 'Anthracite'($\rho_s$ =1.48) is chosen as a model material. According to the model tests, the installation of the guide wall with proper height and the proper control of the flushing gate are required for the effective flushing in the intake structure. In the settling basin a more proper design of the inlet in order to constrain the turbulence flow is required for an efficient sedimentation and the installation of another flushing pipe near the maximum sedimental area is required. Since the trap efficiency is measured about 95%, it is concluded that the design of the settling basin is proper.

  • PDF

Application of Linear Tracking to the Multi-reservours System Operation in Han River for Hydro-power Maximization (한강수계 복합 저수지 시스템의 최적 수력발전 운영을 위한 LINEAR TRACKING의 적용)

  • Yu, Ju-Hwan;Kim, Jae-Han;Jeong, Gwan-Su
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.5
    • /
    • pp.579-591
    • /
    • 1999
  • The operation of a reservoir system is necessary for establishing the operation rule as well as designing the reservoirs for water resources planning or management. Increasingly complex water resource systems require more advanced operation techniques. As a result, various techniques have been introduced and applied until now. In this study Linear Tracking model based on optimal control theory is applied to the operation of the largest scale multi-reservoir system in the Han river and its applicability proved. This system normally supplies the water resources required downstream for hydro-power and plays a role in satisfying the water demand of the Capital region. For the optimal use of the water resources the Linear Tracking model is designed with the objective to maximize the hydro-power energy subject to the water supply demand. The multi-reservoir system includes the seven main reservoirs in IIan river such as Hwachon, Soyanggang, Chunchon, Uiam, Cheongpyong, Chungju and Paldang. These reservoirs have been monthly operated for the past 21 years. Operation results are analyzed with respect to both hydro"power energy and water supply. Additionally the efficiency of the technique is assessed.sessed.

  • PDF

Characteristics of Proteins and Total Suspended Solids Removal by Counter Current Air Driven Type, High Speed Aeration Type and Venturi Type Foam Separator in Aquacultural Water (향류 공기 구동식, 고속 폭기식 및 벤튜리식 포말분리기에 의한 양어장수의 단백질 및 부유 고형물의 제거 특성)

  • SUH Kuen-Hack;KIM Byong-Jin;KIM Sung-Koo
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.33 no.3
    • /
    • pp.205-212
    • /
    • 2000
  • Experimental investigations on the removal of protein, total suspended solids and turbidity from aquacultural water were carried out by using three types of foam separator: counter current air driven type foam separator (CCADFS), high speed aeration type foam separator (HSAFS) and venturi type foam separator (VFS). The decrease of flow rate by CCADFS, HSAFS and VFS were $0.4,\;66.1,\;77.2 {\%}$ respectively. Protein removal rates by three types foam separator were decreased with the increased hydraulic residence time (HRT). Bellw 0.32 minute and 0.21 minute of hydraulic residence times, protein removal rate of HSAFS and YES was higher than that of CCADFS, respectively. Protein removal rate of VFS was lower than that of HSAFS at any HRT. As increasing the HRT, protein removal efficiency of CCADFS was increased, but that of HSAFS and VES were decreased. The changes of removal rates and efficiencies of total suspended solid and turbidity were similar to proteins.

  • PDF

Experimental Study of Energy-Saving Realized with the Improvement of Inner Roughness in Double-Entry Centrifugal Pump (양흡입 원심펌프의 내부 표면 거칠기 개선에 따른 에너지 절감 실험 연구)

  • Lim, Sung-Eun;Sohn, Chang-Hyun;Ryu, Jung-Yup
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.40 no.6
    • /
    • pp.409-415
    • /
    • 2016
  • In this study, we test the effects of the surface roughness on the hydro efficiency of double-suction centrifugal pumps ($Q=70.7m^3/min$, H = 87 m). The original surface of the impeller and inner casing were coated, resulting in surface-roughness reductions ranging from $100{\sim}110{\mu}m$ to $0{\sim}0.08{\mu}m$. We conducted experimental studies to measure the efficiency of the pumps and operating-pump electro energy variations with different surface roughness values. The experimental results showed that the efficiency of the pumps increased by about 0.8~1.79% and the electric energy of the operating pump was reduced by around 4.38 ~ 6.08%. These results indicate that the performance of the pumps depend largely on the surface roughness of the impeller and inner casing, and by reducing the surface roughness, we can improve the efficiency of the pump and reduce costs by reducing the electric energy consumption.

Development of modernizing Old Small-Hydropower system with custom-built at Overseas (해외 노후 수력발전시스템 수용가 맞춤형 현대화 기술개발 및 실증)

  • Kim, Woonhak;Kang, Seokwon;Shin, Giseok
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.2
    • /
    • pp.174-181
    • /
    • 2018
  • Purpose: The purpose of this study is to develop and demonstrate the customized modernization technology of the old aged hydropower generation system in operation Method: The modernization design was carried out based on the daily, weekly, monthly, and yearly information of the power plant in operation at the site. Results: In this paper, a safety diagnosis of existing facilities located in the Philippiness was carried out in accordance with the Special Act on the Safety Management of Domestic Facilities, and a method for reinforcing the facilities was selected. Conclusion: The selection of wheel suitable for the local environment and the maintenance of the old facilities were designed by domestic repair/reinforcement technology.

Experimental and numerical study on the flow characteristics of circular pipe (원형관의 흐름특성에 관한 실험적 및 수치모의 연구)

  • Bynugjoo Kim;Hongjoon Shin;Joongcheol Paik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.294-294
    • /
    • 2023
  • 보나 댐에 설치된 배수관이나 지하에 매설된 상하수도관과 같이 물을 운반하기 위한 관로 뿐만 아니라 유류를 운송하는 관, LPG와 같은 기체를 운송하는 관처럼 유체를 운송할 때 다양한 관로를 사용한다. 그 중 사용범위나 제작에 대한 용이성 등에 의해서 원형관이 주로 사용된다. 따라서 위와 같은 원형관 내의 관수로 흐름분포에 대한 연구는 아주 중요하며 필요하다. 원형관 내 흐름분포는 관에 연결된 펌프 혹은 수조나 저수지의 수위에 의한 관내 압력에 의해 지배되어지며, 관 내부 표면의 거칠기나 관의 꺾인 정도 등 다양한 요인에 영향을 받는다. 본 연구에서는 일반적인 실험결과를 도출하기 위하여 직선의 원형관을 대상으로 실험과 수치모의를 동시에 수행한다. 실험은 높이 3m, 길이 4.5m, 폭 1.5m 수조의 바닥에서부터 0.45m 위에 위치한 1.8m 길이의 아크릴 재질의 원형관이 설치된 수조에서 진행되었으며, 수치모의 또한 동일한 규모에서 수행되었다. 수조의 수위를 변화시켜 여러가지 레이놀즈 수에 따른 관 내 흐름의 변화에 대하여 분석하는 것이 목적이며, 실험결과와 수치모의 계산결과 간의 비교검증을 통해 분석한다. 이 연구에서는 난류의 영향을 RANS(Reynolds-averaged Navier-Stokes)와 LES(large eddy simulation)을 혼합한 형태인 Hybrid RANS/LES 모형 중 하나인 DES(detacged-eddy simulation)기법을 이용하여 해석함으로써, 빠른 유속으로 인한 관 내의 강한 와(eddy)에 대한 효과를 예측하는데 한계가 있는 RANS 모형과 벽면근처에서의 흐름 해석을 위해 굉장히 높은 격자해상도가 요구되어 계산적 비용 측면에서 효율이 떨어지는 LES 모형의 한계를 극복하고자 한다. DES 모형은 벽에서 떨어진 와에 대하여 LES로 직접해석하고, 벽 근처에서의 흐름에 대해선 난류모형을 통해 모델링함으로써 벽 근처 계산격자와 계산량을 줄이면서 LES와 비슷한 결과를 얻을 수 있다. 실험결과와 수치모의 계산결과 사이의 비교검증을 통하여 관 내 흐름에 대한 수치모의의 적용성을 평가하고 실험에서 측정하기 어려운 난류강도와 압력변동의 상세한 특성을 수치모의를 통해 분석함으로서 관 내 흐름특성에 대하여 자세히 분석하였다.

  • PDF