Browse > Article
http://dx.doi.org/10.15683/kosdi.2018.06.30.174

Development of modernizing Old Small-Hydropower system with custom-built at Overseas  

Kim, Woonhak (Department of Civil, Safety, and Environmental Engineering, Hankyong National University)
Kang, Seokwon (Department of Civil, Safety, and Environmental Engineering, Hankyong National University)
Shin, Giseok (BOSUNG POWERTEC)
Publication Information
Journal of the Society of Disaster Information / v.14, no.2, 2018 , pp. 174-181 More about this Journal
Abstract
Purpose: The purpose of this study is to develop and demonstrate the customized modernization technology of the old aged hydropower generation system in operation Method: The modernization design was carried out based on the daily, weekly, monthly, and yearly information of the power plant in operation at the site. Results: In this paper, a safety diagnosis of existing facilities located in the Philippiness was carried out in accordance with the Special Act on the Safety Management of Domestic Facilities, and a method for reinforcing the facilities was selected. Conclusion: The selection of wheel suitable for the local environment and the maintenance of the old facilities were designed by domestic repair/reinforcement technology.
Keywords
Old small hydro power; Civil structure; efficiency improvement; Maintenance.reinforce ment; Safety diagnosis;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Taehwang Chung(2015) "Security Improvement Plan for Nationwide Key Energy Facilities" Journal of the Korea Society of Disaster Information, Vol 11 No 2, P263-267   DOI
2 J. S. Kim ,H. C. Kwon (2009)"Development and Application of the Methodology to Establish Life Extension and Modernization Plan of Aged Hydropower Plants" Transactions of the Korean Society of Mechanical Engineers A, Vol 33 No 10 P1171-1176   DOI
3 Operating and Maintenance Instructions Ton-ok, Republic of the Philippins National Electrification Administration, Volume I, June 1982
4 HAP, "Condition Assessment Manual", Pelton Turbine Inspection Form and Check List,Revision 1.0, PP214-423, 12-8-2011
5 Ahmed M.A.Haidar(2011) "Feasibility Study of Microgrid Application in Langkawi and Socotra Islands" ICITA 2011 P228-232
6 EPRI , 1999 , Hydro Life Extension Modernization Guide