• Title/Summary/Keyword: 수량산출 분류체계

Search Result 17, Processing Time 0.029 seconds

Integrated Code Classification System for Work Sections in Standard Method of Measurement and Construction Standard Specifications (수량산출기준 및 공사시방서의 공종분류코드 통합기준 연구)

  • Kang Leen-Seok;Kwak Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.80-91
    • /
    • 2001
  • Considering that the classified items in the work section level can have an applicability when those items are being used to cost and specification information with consistency, the work section classification code should be applied as an Integrated code system. Our construction industry is using three work section classification systems for civil engineering projects, such as integrated construction information classification system, standard method of measurement and guide of project specification. And each standard construction specification is also using different work section classification systems. This study suggests a methodology to integrate the code systems in construction specifications with civil engineering standard method of measurement. And the methodology suggested in this study was applied to a web-based prototype system with practical specification codes.

  • PDF

A Study on the Current Status and the Problem of Classification System in Agricultural Facilities (농업건축물 분류체계 현황 및 문제점 파악에 관한 연구)

  • Choi, Oh-Young;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee;Cho, Hyung-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.253-257
    • /
    • 2009
  • General technique and management technology of agriculture have development in every year to ensure the competitiveness of agriculture. Accordingly, Interested in using information systems management technology is improving. For information system, the first system of rural buildings category should be established. Classification system is set up through each specific code. and it takes advantage of the information system is to achieve the computerization of agricultural society. Therefore, in this study construction information classification system, quantity of output category, got to the standard classification system architecture, apply to agricultural buildings to review the situation and saw a problem. The result, it is the complexity and broad scope, and it is set to inappropriate setting of the Category item.

  • PDF

A Case on the Applying QDB based Schedule·Cost Data Management for Road Construction (디지털 수량산출정보 기반 도로분야 공정·공사비 정보 관리 시범적용 사례)

  • Moon, Jin Seok;Yoon, Hoi Soo;Han, Choong Han;Kim, Seong Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1428-1429
    • /
    • 2012
  • 건설분야 수량산출정보의 연계 및 교환을 위한 디지털 수량산출정보 교환표준과 지방국토관리청의 도로관리관점에 따라 구성된 작업분류체계를 바탕으로 도로분야 수량산출정보를 지원도구를 통해 생성한다. 건설사는 지원도구에서 작성한 도로공사 수량산출정보를 건설사업관리시스템에 등록함으로써 공정 공사비 관리에 활용하고 있다. 본 연구는 공정 공사비의 통합관리를 통해 실질적인 사업관리가 가능하도록 10개 도로건설공사 시범사업을 선정하여 문제점과 개선방안을 도출하였다.

The Current Status and Development Plan of Construction CALS Standard (건설CALS표준 현황과 발전방안)

  • Kim, Jin-Uk
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2012.07a
    • /
    • pp.435-436
    • /
    • 2012
  • 건설CALS 1998년부터 국토해양부에서 추진하고 있는 정보화사업으로 시스템의 개발 운영과 표준의 개발 운영의 2개 분야로 사업을 진행하고 있다. 건설CALS 표준은 건설정보분류체계, 전자도면작성표준, 도면정보교환표준, 전자문서표준, 디지털 수량산출 교환표준, 건설정보모델(BIM) 작성 납품 공통기준이 있다. 향후 건설CALS 표준은 건설정보 호환을 위하여 정보분류체계의 확장개발과 건설용어의 표준화, 토목분야의 BIM 활성화에 대비하는 토목BIM 표준의 개발이 필요하다.

  • PDF

A Study on the Application of Information Classification for Integration of Construction Information in Construction Phase (시공단계의 건설정보 통합을 위한 분류체계 적용에 관한 연구)

  • Kim Jin-Young;Kim Yong-Gu;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-455
    • /
    • 2002
  • Construction market situation has been changed quickly in the 21st century. One is a large variety of information, the other is the development of IT technology among the rest of the change. Accordingly, it is very important that information is managed systematically and made good use of broadly in proportion to the increase of information volume. Therefore, the purpose of this study is to propose a applicable classification system in the construction phase. First of all, the Construction Information Classification proposed by the government is studied to apply the actual work and to build a applicable construction information classification for construction project. A base of the applicable classification system is the Construction Information Classification, SMM and Materials classification(Public Procurement Service). The applicable classification system to control and manage the construction information is consist of the 4 types : Facility classification, Element classification, Work classification, Resource classification (Materials, Equipment, Labor).

  • PDF

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.

Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management (BIM의 공정과 기성 관리 적용을 위한 CBS 수량 분개 및 코드 정립 방안)

  • Hando Kim;Jeongyong Nam;Yongju Kim;Inhye Ryu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.6
    • /
    • pp.381-389
    • /
    • 2023
  • One of the crucial components in building information modeling (BIM) is data. To systematically manage these data, various research studies have focused on the creation of object breakdown structures and property sets. Specifically, crucial data for managing programs and payments involves work breakdown structures (WBSs) and cost breakdown structures (CBSs), which are indispensable for mapping BIM objects. Achieving this requires disassembling CBS quantities based on 3D objects and WBS. However, this task is highly tedious owing to the large volume of CBS and divergent coding practices employed by different organizations. Manual processes, such as those based on Excel, become nearly impossible for such extensive tasks. In response to the challenge of computing quantities that are difficult to derive from BIM objects, this study presents methods for disassembling length-based quantities, incorporating significant portions of the bill of quantities (BOQs). The proposed approach recommends suitable CBS by leveraging the accumulated history of WBS-CBS mapping databases. Additionally, it establishes a unified CBS code, facilitating the effective operation of CBS databases.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

A Study on Estimating Rice Yield of North Korea using MODIS NDVI (MODIS NDVI를 이용한 북한의 벼 수량 추정 연구)

  • Hong, S.Young;Choe, Eun-Young;Kim, Gun-Yeob;Kang, Sin-Kyu;Kim, Yi-Hyun;Zhang, Yong-Seon
    • Proceedings of the KSRS Conference
    • /
    • 2009.03a
    • /
    • pp.116-120
    • /
    • 2009
  • 원격탐사 기술은 사람이 직접 방문하여 조사하기 힘든 극지라든가 농업환경에 대한 자료 요구도가 높으면서도 직접 수집이 어려운 비접근 지역에 대한 정보를 추출하는데 유용한 관측수단이다. 본 연구는 MODIS(Moderate Resolution Imaging Spectroradiometer) 제공 산출물 중 16일 단위로 작성되는 NDVI(Normalized Difference Vegetation Index, MOD13)를 이용하여 북한의 벼 수량을 추정하는 것을 목적으로 하였고, 그 가능성과 한계에 대하여 알아보았다. 2000년부터 2008년까지 촬영된 MODIS MOD13 자료를 미국 NASA로부터 제공받아 좌표체계를 우리나라에 맞게 투영하고 NDVI를 추출하여 자료분석에 사용하였다. 통계청에서 발표한 벼 수량 및 생산량 통계자료를 이용하였다. 농촌진흥청 국립농업과학원에서 작성한 북한의 토지피복분류도를 이용하여 서해안 평야지대에 위치한 논을 위도별로 네군데 정하여 관심지역(area of interest)으로 설정하였다. 이 관심지역에 대한 시계열 값을 추출하여 연중 연간 변화를 분석하고 2000년부터 2007년까지 수잉기의 NDVI 값을 이용하여 수량에 대한 상관계수(r)는 $0.77^*$로 5%에서 유의하여 NDVI 값에 따라 벼 수량에 큰 영향을 주는 것으로 나타났다. 수잉기의 NDVI 값과 벼 수량에 대해 회귀분석한 결과($R^2=0.591^*$), NDVI에 따른 벼 수량의 변이를 59.1% 설명할 수 있었다. 이와 같이 회귀식을 이용하여 2008년 북한의 벼 수량은 약 2.80 ton/ha로 추정되었다.

  • PDF

Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information (공정-내역정보 연계를 위한 통합건설정보분류체계기반의 공통WBS 활용방안 -도로공사 사례를 중심으로-)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.107-114
    • /
    • 2005
  • The time and cost is the most important information for the construction project management. Currently, a lot of studies have been done in order to clearly relate them with each other, but there have been some difficulties. Because of the characteristic of Korean government contract law, the construction project in Korea is managed by only cost and the time and cost information is distinctly separated. In order to manage all the major construction project information smoothly, the time and cost information should have relation with each other. This study suggest methods for relating the time and cost information, especially for road construction project of MOCT. Through the survey of construction field engineers and case study of the road construction project, several alternatives to improve the usability of construction information are suggested in this study. These alternatives can support relating other construction information.