• Title/Summary/Keyword: 숏크리트

Search Result 342, Processing Time 0.02 seconds

Analysis on Surface Collapse of the Road NATM Tunnel through the Weathered Rock (풍화대를 통과하는 도로 NATM 터널의 천단부 함몰에 대한 연구)

  • Shin, Eun-Chul;Yoo, Jai-Sung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.2
    • /
    • pp.55-64
    • /
    • 2016
  • The construction of the road NATM tunnel, which undergoes the weathered zone of the mountain, was in process with the reinforcement methods such as the rock bolt, shotcrete depositing, and the multi step grout with large diameter steel pipe. The collapse from the ceiling, and on the ground surface area(sink hole), of which were measured to be 25m from the ground surface($V=12m(W){\times}14m(L){\times}5m(H)=840m^3$), as well as excessive displacements in the tunnel, had occurred. In order to execute the necessary reconstruction work, the causes of the surface collapses were inspected through the field investigation, in-situ tests, and numerical analysis. As a result, several proper solutions were suggested for both internal and external reinforcements for the tunnel. As a result of numerical analysis, the collapsed zone of the tunnel was reinforced up to 0.5D~1.0D laterally by the cement grouting on the ground surface, 0.5D longitudinally by the multi step grout with large diameter steel pipe in tunnel. With further reinforcement implemented by rebars in lining, the forward horizontal boring was executed to the rest of the tunnel to evaluate the overall status of the tunnel face. Appropriate reinforcement methods were provided if needed.

Application of the convergence-confinement method of tunnel design to rock masses (암반 터널에서의 시공단계를 고려한 암반-지보 거동특성 곡선적용에 관한 연구)

  • Lee, Du-Wha;Choo, Seok-Yean;Lim, Sang-Bin;Park, Young-Jin;Ahn, Sung-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.2
    • /
    • pp.143-153
    • /
    • 2002
  • Convergence Confinement Method (CCM) makes a more simple judgement in a ground-support reaction than numerical method. Also this method is good for the applicability of construction feedback and the analysis of field measurement. However, there has been little research with respect to the application of CCM in tunnel construction. One of the problems in CCM is a decision of the time to support installation. To decide a reasonable supporting installation time, support characteristic curve and displacement characteristic curve considering construction stage are proposed. In addition, to predict displacement distribution ratio and load distribution ratio, the time dependent support reaction curve is used. Finally, through a comparison of the result between CCM and numerical analysis, the trust of this study is proved and the practical application is proposed to control resonable tunnel construction management.

  • PDF

A study on the effect of support structure of steel rib in partitioning excavation of tunnel (터널 상·하반 분할 굴착 시 강지보재 지지구조 효과에 대한 연구)

  • Kim, Ki-Hyun;Kim, Yeon-Deok;Hwang, Beoung-Hyeon;Choi, Yong-Kyu;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.5
    • /
    • pp.543-561
    • /
    • 2020
  • This paper is the result of the study on the effect of the support structure of the tunnel steel rib. In tunnel excavation, the top and bottom half excavation methods result in subsidence of steel rib reinforcement due to insufficient support of steel rib reinforcement when the ground is poor after excavation. The foundation of the steel rib installed in the upper half excavates the bottom part of the base, causing the subsidence to occur due to various effects such as internal load and lateral pressure. As a result, the tunnel is difficult to maintain and its safety is problematic. To solve these problems, steel rib support structures have been developed. For the purpose of verification, the behavior of the supporting structure is verified by model experiments reduced to shotcrete and steel rib material similarity, the numerical analysis of ΔP and ΔP generated by bottom excavation by Terzaghi theoretical equation. As a result, it was found that the support structure of 20.100~198.423 kN is required for the 10~40 m section of the depth for each soil of weathered soil~soft rock. In addition, as a result of the reduced model experiment, a fixed level of 50% steel rib deposit of steel rib support structure was installed. The study shows that the installation of steel rib support structures will compensate for uncertainties and various problems during construction. It is also thought that the installation of steel rib support structure will have many effects such as stability, economy, and air reduction.

Mineralogical Characteristics of Calcite observed in the KAERI Underground Research Tunnel (고준위폐기물 지하처분연구시설(KURT)에서 관찰되는 방해석의 광물학적 특징)

  • Lee, Seung-Yeop;Baik, Min-Hoon;Cho, Won-Jin
    • Journal of the Mineralogical Society of Korea
    • /
    • v.19 no.4 s.50
    • /
    • pp.239-246
    • /
    • 2006
  • KAERI Underground Research Tunnel (KURT) was recently constructed through the site investigation from the yea. of 2003 at KAERI site, Dukjin-dong, Yuseong-gu, Daejeon city. The geo-logic setting of the site has been slightly metamorphosed. There are small fractures developed in the rock and several kinds of secondary filling minerals exist in the fractures. We examined mineralogical characteristics of fracture-filling calcite, which is not only largely distributed, but also can significantly affect the radionuclides migration. The calcite is found along fractures like other secondary minerals, forming thick veins in part. Most calcite-filled fractures contain quartz, iron oxides, and dolomite as minor minerals. The calcite crystals show an characteristic appearance with an uniformly oriented growth, coated with goethite on the edge and the etch-pit sites of their surface. Some calcite crystals have been newly formed by the precipitation of elements dissolved from the tunnel shotcrete wall, and their morphology changed according to the chemistry and flow of groundwater. The calcite can modify the groundwater chemistry and significantly affect the sorption behavior of radionuclides. The characteristic crystal structure and surface morphology of the calcite examined in the KURT site will be used as important basic data for the radionuclide migration experiment in the future.

A Study on the Reduced Rebound Method of Surface Finishing Spray Photocatalytic Mortar (표면 마감 광촉매 스프레이 모르타르의 리바운드량 저감 방안 연구)

  • Baek, Hyo-Seon;Park, Jeong-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.9
    • /
    • pp.604-609
    • /
    • 2020
  • There are various methods of finishing concrete surfaces, and when considering workability, the spray method is effective, but rebound occurs. The allocation of rebound occurrence control should be adjusted according to the materials used. Thus, a basic study was conducted on multiple techniques for reducing the rebound incidence that are suitable for surface finishing materials containing a photocatalyst. A prior study derived the reduction effect and optimal mix ratio for photocatalytic performance. Based on that study, the rebound reduction was verified according to the specifications of the content and the mechanical durability characteristics of the mixed materials. Rebound, compressive strength, flexural rigidity, and table flow tests were done. The flow was fixed at 170±10 mm considering the workability of the mortar spray equipment. For the experimental variables, the rebound number was adjusted to the silica sand variables relative to the cement weight, and silica sands No. 5 and No. 7 were used. The results show the highest compression strength in the final S-1 variable, and the amount of rebound was minimized. These results were sufficiently filled with the bindings of the silica pores, which increased the binding force between the aggregates, resulting in a lower amount of rebound.

Assessment of Acid Rock Drainage Production Potential and Damage Reduction Strategy: A Case Study of Tunnel Construction Area (암석의 산성배수 발생개연성 평가 및 피해저감대책: 터널건설예정구간 사례)

  • Kim, Jae-Gon;Lee, Jin-Soo;Kim, Tong-Kwon
    • Economic and Environmental Geology
    • /
    • v.41 no.3
    • /
    • pp.335-344
    • /
    • 2008
  • The acid rock drainage (ARD) production potential of rock was assessed for a tunnel construction area, Kimhae and the damage reduction strategy was discussed based on the ARD risk evaluation. The geology of the studied area consisted of Mesozoic quartz porphyry, sandstone, tuff and granite. Sulfides occurred as a disseminated type in quartz porphyry and granite, and a vein type in sandstone. Quartz porphyry and sandstone with a high content of sulfide were classified as a potentially ARD forming rock. The drainage originated from those rocks may acidify and contaminate the surrounding area during the tunnel construction. Therefore, the drainage should be treated before it is discharged. A slope stability problem due to the ARD was also expected and the coating technology was recommended for the reduction of ARD generation before the application of supplementary work for enhancing slope stability such as shotcrete and anchor. From the ARD risk analysis, those rocks should not be used as aggregate and be used as bank fill material with the system for the minimum contact with rain water and ground-water.

Characteristics of the Cut Slopes located in Mt. Jang Area, Busan (부산 장산지역에 분포한 절개사면의 특성)

  • Song, Young-Suk;Kim, Kyeong-Su;Cho, Yong-Chan;Lee, Choon-Oh;Chae, Byung-Gon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.12 no.3
    • /
    • pp.65-73
    • /
    • 2013
  • The information of cut slope in Mt. Jang area, Busan is investigated in order to construct the Slope Management System in Urban Area. The slope inspection sheet is made to record the characteristics for cut slopes, and that is capable to be inputted slope information systematically. The cut slopes in Mt. Jang area are consisting of 69 slopes. Most of the cut slopes are constructed in cutting slope and retaining wall (CR). The cut slopes located in housing facilities are 46 slopes, and the slopes located in school facilities are 12 slopes. The traverse of cut slopes is mainly ranged from 50 m to 150 m, and the height is mainly ranged from 10 m to 20 m. The slopes combined with soil and rock are mostly distributed. The retaining wall was installed in the toe part of cut slope in order to increase the slope stability, and the additional reinforcement methods including the anchor, drainage, preventing rock fall, shotcrete and vegetation were installed at the toe part of cut slopes.

Analysis of Water Penetration through Pores in Spray-applied Waterproofing Membrane Using X-ray CT Images (X-ray CT를 이용한 분무식 방수 멤브레인의 공극 내 물 침투 분석)

  • Choi, Soon-Wook;Kang, Tae-Ho;Chang, Soo-Ho;Lee, Chulho;Choi, Myung-Sik;Kim, Kwang Yeom
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.4
    • /
    • pp.211-219
    • /
    • 2017
  • The spray-applied waterproofing membrane is installed on shotcrete or concrete surface to make impermeable layer with 3-5 mm thick for the purpose of waterproofing. This study aims to determine the internal structure of a spray-applied waterproofing membrane including pores by using X-ray CT technique. Before obtaining X-ray images of the membrane specimens, a waterproof performance test was performed on the membrane specimens with a water pressure of 500 kPa for 28 days. Results show that the movement of moisture is made through micropores. This is based on the fact that the large pores inside the membrane are not saturated and the degrees of saturation of the micropores are high. X-ray image is effective for determining the pore size distribution and whether the membrane with pores contains the water However, it is necessary to pay attention to the determination of water content, since water content may vary depending on the threshold value of X-ray image analysis applied to calculate the water content.

Analysis of Reinforcement Effect of TSL (Thin Spray-on Liner) as Supports of Tunnel by Numerical Analysis (수치해석에 의한 터널 지보재로서 TSL(Thin Spray-on Liner)의 보강 효과 분석)

  • Lee, Kicheol;Kim, Dongwook;Chang, Soo-Ho;Choi, Soon-Wook;Lee, Chulho
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.4
    • /
    • pp.151-161
    • /
    • 2017
  • A TSL (Thin Spray-on Liner) has a higher initial strength and faster construction time than conventional cementitious shotcrete. Because of its high adhesion and tensile strength, the TSL reinforced concrete show a characteristic like composite materials. In this study, to consider an application to the conventional design method, ASD (allowable stress design), numerical study was used. In the numerical analysis, material and contact properties were adopt from previous studies. Then a thickness of concrete in the tunnel was evaluated with the TSL reinforced case by the ASD concept. In other words, bending compressive stress, bending tensile stress and shearing force of the concrete were considered to determine a thickness of concrete lining by the given boundary conditions. From the numerical analysis, there was no tendency to show by the ASD because the ASD is based on the elastic theory while the TSL typically contributes to reinforcement after yielding.

Behavior and pillar stability of enlarged existing parallel tunnels (기존 병설터널의 확폭에 따른 터널 거동 및 필라 안정성 분석)

  • Lee, Myeong-Han;Kim, Bumjoo;Jang, Yeon-Soo;Yun, Ji-Nam;Park, Hyun-Gon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.5
    • /
    • pp.537-546
    • /
    • 2013
  • Traffic congestion in existing tunnels has increased due to increased traffic volume and enlarged vehicles. Enlarging existing tunnels has advantages over constructing new tunnels by reducing land purchasing costs as well as minimizing natural environment destruction. In fact, many overseas projects for enlarging existing tunnels have been reported. Thus, it appears that the demand on enlarging existing tunnels continues to rise in Korea in near future. Nonetheless, the studies related to the enlarged tunnels have been relatively rare since there have been few tunnel enlargement projects in Korea. In the present study, the tunnel behavior and the stability of rock pillar when enlarging existing parallel tunnels were investigated by performing FE analysis and using existing theory and empirical relationships. Four different enlarging cases, depending on the enlargement types and directions, were examined in the study. According to the results, for the tunnels with the same pillar width after enlarged, the uni-laterally enlarged tunnel indicated 5 to 20% higher crown settlement compared to the bi-laterally enlarged tunnel, and for the tunnel with the narrowest pillar, the highest shotcrete stress was observed. Also, the strength/stress ratio for rock pillar was more than 1.0 for all four enlargement cases, and the Matsuda's method was found to give higher strength/stress ratio by about 50% compared to the Peck's method.