공사 낙찰률 상향조정 - 재정경제부, 정부계약제도 개선

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.118
    • /
    • pp.30-33
    • /
    • 2000
  • 재정경제부는 지난 4월 28일 정부계약제도 개선안을 확정하고 29일부터 1천억원 이상 대형공사를 제외한 공공공사의 낙찰 하한율을 동전보다 2.8$\~$10$\%$ 상향조정토록 한 적격심사기준을 개정했다. 또 10억원 미만 소규모 시설공사는 시공실적을 평가하는 한편 기존업체와의 역차별을 해소하기 위해 시공실적에 가산점을 부여하게 된다.

  • PDF

Development of a Model for Calculating the Construction Duration of Urban Residential Housing Based on Multiple Regression Analysis (다중 회귀분석 기반 도시형 생활주택의 공사기간 산정 모델 개발)

  • Kim, Jun-Sang;Kim, Young Suk
    • Land and Housing Review
    • /
    • v.12 no.4
    • /
    • pp.93-101
    • /
    • 2021
  • As the number of small households (1 to 2 persons per household) in Korea gradually increases, so does the importance of housing supply policies for small households. In response to the increase in small households, the government has been continuously supplying urban housing for these households. Since housing for small households is a sales and rental business similar to apartments and general business facilities, it is important for the building owner to calculate the project's estimated construction duration during the planning stage. Review of literature found a model for estimating the duration of construction of large-scale buildings but not for small-scale buildings such as urban housing for small households. Therefore this study aimed to develop and verify a model for estimating construction duration for urban housing at the planning stage based on multiple regression analysis. Independent variables inputted into the estimation model were building site area, building gross floor area, number of below ground floors, number of above ground floors, number of buildings, and location. The modified coefficient of determination (Ra2) of the model was 0.547. The developed model resulted in a Root Mean Square Error (RMSE) of 171.26 days and a Mean Absolute Percentage Error (MAPE) of 26.53%. The developed estimation model is expected to provide reliable construction duration calculations for small-scale urban residential buildings during the planning stage of a project.

Development of Information Management System by use of PDA for Wide-area Sewerage Line Construction (광역 하수관거 건설공사의 PDA 기반 공사관리 시스템의 개발)

  • Baek, Yeong-In;Kim, Bo-Hyun
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2008.11a
    • /
    • pp.179-182
    • /
    • 2008
  • 국가 경제규모의 성장과 더불어 하수관거 공사의 규모도, 영세업체들에 의해 소규모 지역별로 시공되던 것에서 벗어나 최근에는 효율적 공사관리와 소요품질의 확보를 위하여 광역화되는 추세에 있다. 광역화의 규모는 2-3개 지자체와 산하의 40-50여개의 마을이 포함될 정도에 이르고 있다. 이러한 하수관거 공사의 규모 확대에 따른 변화에 대응하기 위하여는 적기, 적소에서의 제반 자원의 효율적 활용이 무엇보다 중요한 것으로 분석되었으며 이러한 문제점의 해결방안으로서 IT 기술을 활용한 공사관리시스템을 개발 사용하였다.

  • PDF

A Study on Improvement Plan to Enhancing the Effectiveness of Technical Guidance Project for Safety Control of Small Construction Site (소규모건설현장 안전관리를 위한 기술지도 사업의 실효성 제고를 위한 개선방안 연구)

  • Lim, HyoungChul;Beak, NakKyu;Kim, DaeYoung;Jeong, SeongChoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.79-85
    • /
    • 2018
  • The government and of the Safety and Health Corporation have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce accidents on the construction site. However, the number of disasters on the construction site is increasing every year, Which accounts for more than 80% of the total number of casualties. It is necessary to investigate the implementation status of safety and health management in the field of small-size construction site, and to provide the appropriate technical guidance plan to the relevant work places. Also, it is necessary to reduce the disaster at the small-size construction site, The purpose of this study is Improvement Plan to Enhancing the Effectiveness of Technical Guidance Project for Safety Control of Small Construction Site.

Analysis of Safety Management Operations of Fire Risk Factors in Small-Scale Construction Sites (소규모 건설현장 화재 위험요인 안전관리 운영실태 분석)

  • Moon, Pil-Jae;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.775-785
    • /
    • 2022
  • By analyzing the operation status of fire safety management of small construction site workers, deriving problems, and suggesting improvement measures, this study was conducted to present practical basic data for their efficient use in the future, and the following conclusions were drawn. First, it was analyzed that small construction site workers are elderly in the age group of construction workers, have short construction skills, most of the jobs are working in the construction industry, and the employment type is non-regular workers. Second, the fire safety management improvement plan of small construction site workers is systematized, fire safety manager is deployed to manage fire risk, fire escape routes and emergency warning facilities are provided to inform all workers at the construction site. In addition, measures to reduce industrial accidents are needed through realistic evacuation training, fire VR training, and interesting educational programs.

건설산업기본법 시행령.시행규칙 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.223
    • /
    • pp.47-57
    • /
    • 2009
  • 건설산업기본법 시행령 시행규칙이 개정, 2008년 12월 31일 공포되었다. 이번에 개정된 건산법 시행령은 ${\bullet}$원도급자의 공사금액 조종사유 통보 내용과 절차 구체화 ${\bullet}$소규모 공사의 건설기술자 중복배치 허용 현장 수 확대, 건산법 시행규칙은 ${\bullet}$건설공사 하도급계약통보서 및 건설공사대장에 4대 보험료 등의 내용 명시 ${\bullet}$건설업 양도 공고절차 간소화 등의 내용이 개정되었다. 개정된 건산법 시행령은 오는 7월 1일부터, 시행규칙은 오는 4월 1일로부터 시행된다.

  • PDF

A Study on the Reduction Plan of Dust Dispersion at Small-Scale Construction Sites in Downtown Seoul (서울 도심지 내 소규모 공사현장 비산먼지 감소방안에 관한 연구)

  • Cho, Jeong Gyu;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.6
    • /
    • pp.745-750
    • /
    • 2021
  • As public concern for fine dust has increased, so too has the interest in fugitive dust. Fugitive dust generated at construction sites, which is then scattered by vehicles moving around the sites, accounts for a significant portion. Small construction sites, which comprise the majority of construction sites, are often not adequately managed, because there are no regulations on fugitive dust for such sites. Therefore, in this study, in order to contribute to the establishment of fugitive dust management regulations on small-scale construction sites and to prepare measures to reduce fugitive dust, we measured and analyzed fugitive dust generated at small-scale building sites in Seoul. The fluctuations of fugitive dust generated at small-scale sites over time were checked, and the relatively low concentration when measured behind fences and railings suggested that fence installation is an appropriate method of reducing fugitive dust.

어항소식

  • 한국어항협회
    • Monthly Newsletter
    • /
    • no.11
    • /
    • pp.1-4
    • /
    • 1988
  • 설계파고이상파랑내습 소규모어향구조적취약 - 원인에 적극대응 견실시공도 도모 - 어항공사 사진촬영법<2>

  • PDF

어항소식

  • 한국어항협회
    • Monthly Newsletter
    • /
    • no.139
    • /
    • pp.1-4
    • /
    • 1999
  • 육지 소규모어항 개발 활성화 돼야 - 어항공사시공관리의 첫걸음[33]

  • PDF