• Title/Summary/Keyword: 설계프로세스

Search Result 2,123, Processing Time 0.032 seconds

A Proposal of Practical Management Process for Product Design (제품디자인을 위한 실무적 관리프로세스 제안)

  • 류승호
    • Archives of design research
    • /
    • v.16 no.2
    • /
    • pp.197-208
    • /
    • 2003
  • A recent trend for product development requires that product design firms participate in every process in cooperations with clients. So, this study proposed an advanced practical management process for product design according to the new trend Because existing processes explain summary steps just including market research, design, engineering, manufacturing., to support the recent trend, an extended process which explains every steps should be prepared. Design development precesses include initial meeting, contact, kick-off meeting, market research, idea sketch, rendering, design drawing, design mock-up, design manual, engineering drawing, ES mock up, mold, manufacturing, and patent. To manage these whole design processes, designers should have abundant knowledge about them. This process has three merits: 1) understanding the whole processes, 2)the unity between design and manufactures, 3)collecting accurate information by market research, 4)elevating design quality. So, designers are able to manage whole product development processes. This practical management process proposes an advanced structure for product design development, and can be accepted for various product design development environments.

  • PDF

Design and Implementation of Assessment System for SPICE Maintenance Process (SPICE 유지보수 프로세스 심사 시스템 설계 및 구현)

  • Kwon, Young-Oh;Ko, Young-Cheol;Kim, Jin-Woen;Koo, Yeon-Seol
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.8 no.2
    • /
    • pp.141-154
    • /
    • 2002
  • More efforts have been given to solve the problems related to computer software by process assessment. ISO/IEC 15504(SPICE) has been developed as standardized means for process assessment. The purpose of this paper is to design and implement a process assessment system which is appropriated to the Korean assessment environment based on ISO/IEC 15504. Referring documents are: IS0/1EC 15504 standardized documents, the assessment provisions of the SPICE committee in Korea, and research papers applied the existing process assessment system to real cases. Among a lot of processes, this system is designed for (ENG2). The proposed system in the paper will support the whole process of assessment, presenting the goals and end-products for each assessment step and making it possible to compose and save the product on the same screen. In determining process rating, assessors can retrieve the saved data and documents. By doing so, the system will improve reliability in process rating. The proposed system includes 7 steps of pre-assessment and 9 steps of actual assessment in order to fully prepare assessors for process assessment. And each step has been standardized to improve user-friendliness. This system is designed to provide assessors with specific details of standardized documents, the goals of the process, outcomes of implementing the process, and presentations of base practices and input/output products. Above all, the system automatically generates an assessment rating, by calculating based on input data which assessors make out. It also presents outcomes graphically.

Development of Design Process Management Model using Dependency Structure Matrix for Constructability (시공성을 위한 Dependency Structure Matrix 기반의 설계 프로세스 관리 모델 개발)

  • Park, Moon-Seo;Ham, Young-Jib;Lee, Hyun-Soo;Kim, Woo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.65-74
    • /
    • 2010
  • The design with construction knowledge and experience can eliminate inefficiency in the process of construction and improve productivity in all phase of construction project. To utilize constructability knowledge most effectively in design phase, the information must be made available to the design team at the proper point in time. Current methods for effective utilization of constructability knowledge have focused on the structuralization of constructability knowledge such as checklist, which lack the consideration of the proper point in time. However, constructability knowledge which is used at the inapposite point in time consequently leads to unnecessary rework. To minimize this inefficiency and improve productivity, project manager needs to consider the design process and know what constructability knowledge is required for specific design activities. This paper therefore presents a design process management using Dependency Structure Matrix (DSM) that focus on information flows between design activities and constructability knowledge. We expect that the results of this paper will support that design process management become comprehensive management related to every phase of construction project beyond design review or inspection in design phase, and be used as a basis of the integration of design and construction.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

Establishment of Collaborative Decision Making Support Process in Pre-Final Design Step (건축 중간설계단계의 협력 의사결정 지원 프로세스 구축)

  • Oh Seung-Jun;Kwon Won;Kim kyung-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.315-318
    • /
    • 2003
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. Therefore The final object of this study is to propose the establishment method of decision support process for the cooperative design in order to provides improved design coordination and optimize the building system.

  • PDF

The Study on Development of Automatic Main Placing Macro of Beams for RC Structures based on BIM (BIM기반 철근콘크리트 보의 주철근 자동배근 매크로 생성 및 구현에 관한 연구)

  • Cho, Young-Sang;Shin, Tae-Song;Hong, Sung-Uk;Lee, Je-Hyuk;Jang, Hyun-Suk
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.537-540
    • /
    • 2010
  • 본 논문에서는 보의 주철근을 대상으로 건물정보모델링(BIM, Building Information Modeling)통합 설계 시스템 상에서 배근 설계 및 철근 형상화 알고리즘을 구축하여 자동배근 시스템(ARPM, Automatic Reinforcement Placing Module)을 개발하는데 목적이 있다. 구조분야에서의 BIM 프로세스는 정보호환체계를 구축하는 과정에 있으며, 철골 구조 프로세스의 경우 표준 호환 포맷을 이용하여 원활한 정보 호환 체계를 유지하고 있다. 하지만, 철근 콘크리트의 BIM 통합 설계 시스템은 철근 배근정보의 생성과 호환이 원활하지 않아 표준 정보 호환 체계가 구축되지 않은 실정이다. 기존 2차원 기반 프로세스에서는 철근 배근 설계에 있어 표준화된 기준에 따른 배근이 아닌 관행이나 일률적인 배근 지침에 따라 배근 상세를 정하고 있고, 2차원 배근 설계 결과만 제시하고 있어 상호 호환 가능한 철근 배근 정보데이터가 생성되지 않는다. 철근 콘크리트 구조에서의 철근 배근 정보를 생성하고 BIM 통합 구조 설계시스템에서의 정보 호환성을 확보하기 위해, 보의 주철근을 대상으로 구조 해석 데이터베이스와 통합 설계 플랫폼 간의 호환 시스템을 생성하고, 콘크리트학회 콘크리트 구조설계기준에 따른 배근 설계 및 철근 형상화 알고리즘을 구축하여 자동배근시스템(ARPM)을 개발하는데 목적이 있다.

  • PDF

Design and Implementation of Event Notification System Using E-Mail Service (전자메일 서비스를 이용한 이벤트 알림 시스템의 설계 및 구현)

  • Lee, Seung-Min;Kim, Myoung-Il;Jeong, Hee-Seok;Kim, Jae-Sung;Lee, Sang-Min
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2010.04a
    • /
    • pp.91-94
    • /
    • 2010
  • 응용 프로그램을 실행할 때 프로세스간의 상호 연동이 필요한 경우 통신을 하게 된다. 프로세스간의 통신에서 서비스를 요청하는 프로세스의 상태에 따라 동기(Blocking) 모드와 비동기(Non-blocking) 모드로 나누어진다. 동기 모드는 서비스를 요청받은 프로세스의 작업이 완료할 때까지 서비스를 요청한 프로세스의 상태가 멈추는 방식이고, 비동기 모드는 다른 프로세스에 서비스를 요청한 후 자신은 다른 유용한 작업을 계속 수행할 수 있는 방식으로 통신 상대가 여럿이거나 서비스 수행시간이 긴 작업의 경우 비동기 모드를 사용한다. 프로세스 간의 비동기적인 작업 수행이 이벤트 기반으로 이루어지도록 지원하는 이벤트 알림 시스템은 전자메일(E-mail) 서비스와 유사한 특징이 있다. 전자메일 서비스는 컴퓨터 통신망을 통해 편지를 주고 받을 수 있는 서비스 및 해당 편지를 일컫는 용어로, 본 논문에서는 이전에 제시된 이벤트 알림 시스템의 구성과 잘 알려진 전자메일 서비스의 특징을 파악하여 전자메일 서비스를 이용한 이벤트 알림 시스템의 설계 및 구현 방법을 제시한다.

Application Case Study on the BIM based Structural Design Process for Office Buildings (오피스 건물에 대한 BIM기반 구조설계 프로세스의 적용사례)

  • Shin, Tae-Song;Eom, Jin-Up
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.3
    • /
    • pp.301-312
    • /
    • 2012
  • This paper studied the applicable case study on the BIM, based on a structural design process for office buildings. The design process and the applicable system are provided from the results of the research project on the system development of a virtual construction. The case study evaluated the work productivity and economic application of the process and the developed system. The study mainly takes steel structures into account. By using the structural analysis model and the basic design documents, it is able to create the basic construction model and the construction structural model. Likewise, the integrated model is built by IFC from the finished construction structural model. It checked the interoperability of the information among the various BIM design tools. The work environment was efficiently improved by establishing the BIM process, and work productivity could be increased with the help of the modeling automation for connections at the construction design stage.

A Study on the Personal Software Process Generator using the Process Tailoring Technique (프로세스 조정 기법을 이용한 개인 소프트웨어 프로세스 생성에 관한 연구)

  • 장윤정;김우목
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.04c
    • /
    • pp.64-66
    • /
    • 2003
  • 최근 많은 기업들이 조직의 프로세스 능력 수준을 향상시키기 위해, 표준 프로세스를 정립하고 개발 과제에 적용하고 있다. 이는 체계적인 개발 활동을 통해 우수한 품질의 제품 생산을 유도하고 있지만, 개발 과제의 특성을 고려하지 않고 적용되고 있어 프로젝트 관리상에 많은 문제점을 발생시킨다. 본 논문에서는 조직의 특성, 개발 과제의 특성 등을 고려하여 표준 프로세스를 조정하는 기법을 제시하고, 이를 활용하여 개인 프로세스를 생성하는 도구에 대한 설계를 제안한다. 또한, 생성기를 통해 조정된 개인 프로세스들과 표준 프로세스와의 완전성, 일관성 체크를 통해 생성기의 품질을 보증한다. 본 논문에서 제안된 개인 프로세스 생성기는 조직의 자원을 최적으로 할당하여 불필요한 일정 낭비를 예방하고, 효율적인 프로세스 적용을 통해 프로젝트의 성공을 제공한다.

  • PDF

Presentation and behavior analysis of individual processes for establishing the development process model in the SOC environment (SOC 환경에서의 개발 프로세스 모델 정립을 위한 개별 프로세스의 제시 및 역할 분석)

  • Lee, Dong-Hoon;Paik, In-Sup
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2005.05a
    • /
    • pp.293-296
    • /
    • 2005
  • 소프트웨어 개발 방법론의 새로운 페러다임으로 제시되고있는 서비스 지향적 컴퓨팅방법론은 소프트웨어의 개발에 서비스라는 요소를 이용하고 있다는 점에서 다른 방법론과는 많은 차이점을 가지고 있다. 기존의 여러 방법론은 그 동안 여러 논문에서 효율적인 개발 프로세스 모델을 제시하고 있지만, 서비스 지향적 컴퓨팅방법론은 아직 개발 프로세스 모델에 대한 연구는 진행중이지 못한 실정이다. 기존은 방법론과 서비스 지향적 컴퓨팅방법론의 여러 차이점 때문에 기존 방법론에 대한 개발 프로세스 모델을 적용하기에는 여러 문제점이 따르며 새로운 개발 프로세스 모델에 대한 연구가 필요하다. 개발 프로세스 모델에 대한 연구를 하기 위해서는 서비스 지향적 컴퓨팅 방법론에서 요구사항분석 및 정의, 설계, 개발, 실행, 유지보수와 같은 각각의 프로세스에 대한 연구가 선행되어져야 할 것이다. 이에 본 논문에서는 서비스 지향적 컴퓨팅방법론의 특징을 살펴봄으로써 개발 프로세스 모델에서 사용되어질 프로세스들을 제시해보고자 한다.

  • PDF