• Title/Summary/Keyword: 선형계획법

Search Result 469, Processing Time 0.035 seconds

A New Approach for Forest Management Planning : Fuzzy Multiobjective Linear Programming (삼림경영계획(森林經營計劃)을 위한 새로운 접근법(接近法) : 퍼지 다목표선형계획법(多目標線型計劃法))

  • Woo, Jong Choon
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.3
    • /
    • pp.271-279
    • /
    • 1994
  • This paper descbibes a fuzzy multiobjective linear programming, which is a relatively new approach in forestry in solving forest management problems. At first, the fuzzy set theory is explained briefly and the fuzzy linear programming(FLP) and the fuzzy multiobjective linear programming(FMLP) are introduced conceptionally. With the information obtained from the study area in Thailand, a standard linear programming problem is formulated, and optimal solutions (present net worth) are calculated for four groups of timber price by this LP model, respectively. This LP model is reformulated to a fuzzy multiobjective linear programming model to accommodate uncertain timber values and with this FMLP model a compromise solution is attained. Optimal solutions of four objective functions for four timber price groups and the compromise solution are compared and discussed.

  • PDF

A study on rivised simplex method for linear programming with unrestricted variables (비제약 변수를 포함한 선형계획법의 해법)

  • 소영섭;박순달
    • Korean Management Science Review
    • /
    • v.6 no.2
    • /
    • pp.97-104
    • /
    • 1989
  • 본 논문에서는 선형계획법에 비제약 변수가 포함될 경우 발생되는 제반 이론을 정리하고, 이를 이용하여 원문제를 소거법이나 치환법을 사용하지 않고 해를 구하는 변형된 수정단체법을 제시하려고 한다.

  • PDF

Long-Term Operation Modeling for the Hydropower Reservoir in the Han River Basin Using Linear Programming (선형계획법을 이용한 한강 수계 수력발전 댐 장기모형 구축)

  • Lee, Eunkyung;Ji, Jungwon;Yi, Jaeeung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.156-156
    • /
    • 2015
  • 최근 화석연료의 사용으로 인한 지구온난화 등 환경파괴가 점점 증가하는 추세이며 이로 인해 신재생에너지 중 하나인 수력발전이 주목받고 있다. 수력발전은 물의 위치에너지를 기계에너지로 이를 다시 전기에너지로 변환하는 친환경적인 방식으로 운영된다. 수력발전량은 우리나라 전체 발전량의 1.5% 정도로 적은 양의 발전량을 생산하지만 가동시간이 짧아 전력수요가 급변하는 상황에 대비 가능하기 때문에 수력발전은 필수적이다. 기후변화의 영향으로 연평균강수량은 증가하는 양상을 보이나 연 강수일수는 줄어드는 등 수자원의 불확실성이 증가하고 있는 실정이다. 따라서 미래 불확실한 수자원 공급에 대비할 수 있는 수자원의 효율적 활용에 대한 연구가 필요하다. 본 연구에서는 하천의 유량이 계절에 따라 변동 폭이 크다는 점을 고려하며 월별 발전량을 최대화하기 위해 선형계획법을 적용하는 모형을 구축하였다. 선형계획법은 목적함수와 제약조건식 모두 1차식으로 비선형항을 포함할 수 없으나 초기 해가 불필요하고 최적해가 보장된다는 장점을 가진다. 일부 목적함수나 제약조건식에 비선형항이 포함되어 있을 경우 Successive Linear Programming(SLP), Piecewise Linear Programming(PLP), Taylor Expansion 등의 방법을 이용하여 선형화할 수 있다. 본 연구에서 비선형 제약조건은 Taylor Expansion을 이용하여 선형화하였으며 한강수계 9개 댐의 월간 발전량을 최대화시키는 장기 운영 모형을 구축하였다. 개발 환경은 Linux-CentOS이며 사용프로그램은 통계 분석에 많이 활용되는 R programming이다. R programming은 패키지를 이용한 개발이 용이하고 Windows 뿐만 아니라 Linux, Mac, Unix 등의 운영체제에서도 호환 가능하다는 장점이 있다.

  • PDF

Security Constrained Economic Dispatch based on Interior Point Method (내점법에 의한 선로 전력 조류 제약을 고려한 경제급전에 관한 연구)

  • Kim, Kyoung-Shin;Lee, Seong-Chul;Jung, Leen-Hark
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.311-312
    • /
    • 2006
  • 본 논문에서는 선로 전력조류제약을 고려한 경제급전(SCED : Security-Constrained economic dispatch)에 내점 선형계획법을 이용하여 최적해를 구하는 문제를 다룬다. 최적전력조류(Optimal Power Flow)식으로부터 선로의 유효전력만을 근사화하여 선로 전력조류 제약을 고려할 경제급전(SCED)의 식을 정식화한다. 선형계획법을 적용하여 최적해를 구하기 위해서 발전기출력과 유효전력, 부하, 손실과의 관계를 이용하여 경제급전의 식을 선형화 하는 알고리즘을 제시한다. 선형화 알고리즘은 목적함수로 계통 발전기의 총 연료비를 취하고 전력수급평형식으로 발전기출력증분에 대한 선로의 증분손실계수를 이용하며, 선로의 제약조건은 일반화발전 분배계수(GGDF : Generalized Generation Distribution Factor)를 이용하여 선형화한다. 최적화 기법으로서 내점법(Interior Point Method)을 적용하고자 하며 사례연구를 통하여 선형계획법 중 가장 많이 사용하는 심플렉스(Simplex)법과의 수렴특성을 비교하여 내점 법의 효용성을 확인하고자 한다.

  • PDF

A method of Calculating Optimal Duration and Cost Using Monte Carlo Simulation and Linear Programming (몬테카를로 시뮬레이션과 선형계획법을 이용한 최적의 일정 및 비용 산정방법)

  • Kim Yong-Deuk;Lee Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.210-215
    • /
    • 2004
  • In can occur to many problems on progressing step without close scope definition, interrelation definition between activities, resource plan, and schedule plan on planning step. But it have not closely defined performance system on planning step because of many constraints of domestic construction industry. Therefore this paper intends to discuss a method of calculating optimal cost and duration using Linear Programming that solves maximing or minimizing problems among decision making methodology and Monte Carlo Simulation that decreases to probability errors. With outcoms applying Linear programming and Monte Carlo Simulation for calculating optimal cost and duration, follow as : With outcomes applying Monte Carlo Simulation, it could calculate reliable estimator about project duration through removing various constraints. With outcomes applying Linear programming, it could calculate optimal value about project cost through defining various variables and constraints on many activities.

  • PDF

소규모 한글 선형계획법 소프트웨어 K-LP의 개발

  • 김세헌;김성륜;여재현
    • Korean Management Science Review
    • /
    • v.11 no.3
    • /
    • pp.27-34
    • /
    • 1994
  • 본 연구에서는 우리나라의 경영과학 입문자들이 선형계획 모형 개발 및 해석을 용이하게 할 수 있도록, 사용하기 편리하고 안정된 선형계획법 소프트웨어를 만들었다. 이 소프트웨어는 풀 수 있는 문제의 크기는 50 * 50으로 제한한 반면 한글로 모두 처리되도록 하였으며, 풀다운 메뉴방식으로 user friendly하며, 입문자들이 쉽게 이해할 수 있는 LINDO식 입력방식을 취하였으며, 패키지 내부에 완벽한 Editing 기능을 갖고 있어서 모형의 수정 보완이 매우 편리하게 되어 있다. 본 논문에서는 이 소프트웨어의 특성과 구조를 살펴본다.

  • PDF

A Fuzzy Linear Programming Problem with Fuzzy Convergent Equality Constraints (퍼지 융합 등식 제약식을 갖는 퍼지 선형계획법 문제)

  • Oh, Se-Ho
    • Journal of the Korea Convergence Society
    • /
    • v.6 no.5
    • /
    • pp.227-232
    • /
    • 2015
  • The fuzzy linear programming(FLP) is the useful approach to many real world problems under uncertainty. This paper deals with a FLP whose objective value is fuzzy. And the right hand sides of convergent equality constraints are fuzzy numbers. We assume that the membership function of the objective value is piecewise linear and those of the right hand side are trapezoidal. Each of these trapezoidal functions can be algebraically replaced with three linear functions. Then the FLP problem is transformed into the Zimmermann's symmetric model. The fuzzy solution based on the max-min rule can be obtained by solving the crisp linear programming problem derived from the symmetric model. A numerical example has illustrated our approach. The application of our approach to the inconsistent linear system can enable generate us to get define the useful and flexible inexact solutions within acceptable tolerance. Further research is required to generalize the membership function.

Comparative Study on Hydropower Generation in the Han River Basin by Using HEC-ResPRM and Linear Programming (HEC-ResPRM과 선형계획법을 이용한 한강수계 댐 발전량 비교 연구)

  • Ji, Jungwon;Lee, Eunkyung;Yi, Jaeeung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.141-141
    • /
    • 2015
  • IPCC 5차 보고서에서 기술되어 있는 것처럼 기후시스템의 온난화는 명백하며, 1950년 이후 관측된 많은 변화들은 지난 수천 년간 전례가 없는 것이었다. 지구 온난화로 대표되는 기후변화는 이제 일부 국가에 국한되는 문제가 아니라 전 지구적인 문제가 되었다. RCP 시나리오에 따라 차이는 있으나 대한민국의 경우 연평균 강수 총량은 증가할 것이라 예상되는 반면 총 예상 강우 일수는 감소하여 집중호우의 발생빈도가 증가될 것이라 예상되고 있다. 이에 따라 수자원의 효율적 이용에 대한 필요성 또한 증가하고 있는 실정이다. 본 연구에서는 수자원의 효율적 이용을 위해 한강수계 9개 댐(화천, 춘천, 소양강, 의암, 청평, 충주, 괴산, 횡성, 팔당)을 대상으로 HEC-ResPRM과 선형계획법을 이용하여 발전량을 최적화 하였다. HEC-ResPRM은 미공병단 수문공학센터에서 개발한 저수지운영 최적화 모형으로 홍수 조절, 관개, 발전, 레크리에이션 등 다양한 요구조건을 만족시킬 수 있는 최적의 저수지 운영방안 도출이 가능하다. 본 연구에서는 HEC-ResPRM 모형과 선형계획법을 이용한 운형모형의 결과자료를 비교하였으며 이를 통해 HEC-ResPRM 모형의 특징과 활용 가능성을 확인하였다.

  • PDF

소형전산기를 이용한 선형계획 해법의 효율성 제고에 관한 연구

  • 함주호;박순달
    • Journal of the military operations research society of Korea
    • /
    • v.11 no.2
    • /
    • pp.23-39
    • /
    • 1985
  • 이 논문은 소형개인용전산기를 이용하여 많은 변수를 가진 선형계획법을 풀려고 할때 사용될 수 있는 몇가지 기법을 소개한다. 이 논문에서는 이런 목적에 알맞는 단체법 계산기법, 파일의 종류, 그리고 주기억장치의 배분을 다루고 있다. 그리고 여러가지 형태의 문제에 대해 이들 결과의 타당성을 소형전산기로 실험하였다.

  • PDF