• Title/Summary/Keyword: 생애주기 모델

Search Result 163, Processing Time 0.022 seconds

A Conceptual Model Study For J.I.T(Just In Time) Construction Managemaent On High-rise Building-Concerned On Resource Life Cycle Of Concrete Construction- (고층건축공사 적시생산을 위한 관리모델 사례 -콘크리트 자재의 Life Cycle을 중심으로-)

  • Song Young-Suk;Lim Hyung-Chul;Choi Yun-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.127-134
    • /
    • 2001
  • Effectiveness of Just in time managing system can be obtained by removing unexpected lead-time and maintaining consistency on the physical transportation of construction resource. Construction resource management is essential on checking on load data from production of shop to field, and it is based on building resource life cycle information. In this study, production, transportation, and assembly disciplines of concrete construction should real time communications exchanging information related to shop-field with each other, Establishing information support system is an important initial step for promoting active cooperations among these resource life cycle on data flow. To achieve this, on suitable using management point, we suggest a concrete construction control model.

  • PDF

Corrosion Fatigue Reliability-Based Life Cycle Cost Analysis of High-Speed Railway Steel Bridges (고속철도 강교량의 부식 피로신뢰성 기반 생애주기비용 분석)

  • Cho, Hyo-Nam;Jeon, Hong-Min;Sun, Jong-Wan;Youn, Man-Keun
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.1
    • /
    • pp.107-113
    • /
    • 2008
  • As it recently appears that LCC (Life Cycle Cost) analysis may be considered as an essential method for economic evaluation of infrastructures. Many researches have been made to assess LCC of each facility based on reasonable methods. However, expected maintenance repair cost must be reasonably estimated to enhance the reliability of LCC analysis through systematic and rational methods. This study is intended to propose a rational approach to reliability-based LCC analysis of high-speed railway steel bridges considering lifetime corrosion and fatigue damage. However in Korea, since high speed railway steel bridges are only recently constructed, no direct statistical data are available for the account of the maintenance cost and thus their maintenance characteristics are not clear yet. In this paper, for the assessment of expected maintenance/repair cost, the fatigue system reliability analysis incorporating the corrosion effect is proposed by considering the corrosion and fatigue damage using measured data of high speed railway steel bridges. A model proposed by Rahgozar, of at for fatigue notch factor considering the corrosion effect is used in order to incorporate the corrosion effect into the fatigue strength reduction and S-N curve. Finally, the effectiveness of LCC model proposed for high-speed railway steel bridges is demonstrated by a numerical example.

Bridge Life Cycle Cost Analysis of Preventive Maintenance (예방적 유지관리를 통한 교량의 생애주기비용 절감 효과 분석)

  • Jeong, Yo-Seok;Kim, Woo-Seok;Lee, Il-Keun;Lee, Jae-Ha
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.6
    • /
    • pp.1-9
    • /
    • 2016
  • The paper aims at evaluating effects of preventive maintenance on life cycle cost(LCC) reduction of bridges. The preventive maintenance activities capable to delay bridge deteriorations can reduce overall maintenance costs and extend service life of a bridge by regularly providing maintenance activities and avoiding larger maintenance(repairs or rehabilitations) costs. Couple of prediction models were proposed in order to calculate LCC of a typical bridge: a health score model and repair rehabilitation cost model. In addition, the maintenance activities such as wash and painting were also suggested in order to consider effects of preventive maintenance in the analysis based on literature reviews. According to analysis results, new maintenance strategy(reactive maintenance + preventive maintenance) can save \0.5 billion per bridge for future life-cycle costs over 100 year analysis or \184 billion for entire HBMS(Highway Bridge Management System) inventory over 20 years. Small investments for preventive maintenance in improved bridge management can have a very significant return when considering the large bridge inventory.

Proposal of Process Model for Research Data Quality Management (연구데이터 품질관리를 위한 프로세스 모델 제안)

  • Na-eun Han
    • Journal of the Korean Society for information Management
    • /
    • v.40 no.1
    • /
    • pp.51-71
    • /
    • 2023
  • This study analyzed the government data quality management model, big data quality management model, and data lifecycle model for research data management, and analyzed the components common to each data quality management model. Those data quality management models are designed and proposed according to the lifecycle or based on the PDCA model according to the characteristics of target data, which is the object that performs quality management. And commonly, the components of planning, collection and construction, operation and utilization, and preservation and disposal are included. Based on this, the study proposed a process model for research data quality management, in particular, the research data quality management to be performed in a series of processes from collecting to servicing on a research data platform that provides services using research data as target data was discussed in the stages of planning, construction and operation, and utilization. This study has significance in providing knowledge based for research data quality management implementation methods.

Development of a Successive LCC Model for Marine RC Structures Exposed to Chloride Attack on the Basis of Bayesian Approach (베이지안 기법을 이용한 해양 RC 구조물의 염해에 대한 LCC 모델 개발)

  • Jung, Hyun-Jun;Park, Heung-Min;Kong, Jung-Sik;Zi, Goang-Seup;Kim, Gyu-Seon
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.3
    • /
    • pp.359-366
    • /
    • 2009
  • A new life-cycle cost (LCC) evaluation scheme for marine reinforced concrete structures is proposed. In this method, unlike the conventional life-cycle cost evaluation performed during the design process, the life-cycle cost is updated successively whenever new information of the chloride penetration is available. This updating is performed based on the Bayesian approach. For important structures, information required for this new method can be obtained without any difficulties because it is a common element of various types of monitoring systems. Using the new method, the life-cycle maintenance cost of structures can be estimated with a good precision.

A Study on Metadata Ontology Design for Record Management Based on IPAM Model (IPAM 모형을 적용한 기록관리 메타데이터 온톨로지 설계)

  • Park, Heejin;Park, Oknam
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.15 no.4
    • /
    • pp.99-123
    • /
    • 2015
  • The study aims to present authenticity ontology required for capturing information about digital record's identity and integrity over the course of the lifecycle. To this end, we analyzed the functional requirements, domain model, and sample properties of the IPAM (InterPARES Authenticity Metadata), Based on IPAM, we proposed an ontology for authenticity of digital records with sample records. The suggested ontology modeling can be utilized as the basis for establishing an authenticity information creation and management tool for digital records.

Study on Commuting Travel Time devided by Life Cycle: In Gyeonggi-Do Case (생애주기별 통근통행시간 영향요인 분석: 경기도를 중심으로)

  • Bin, Mi-Young;Chung, Eui-Seok;Park, Hyoung-Won
    • Journal of Korean Society of Transportation
    • /
    • v.30 no.3
    • /
    • pp.71-82
    • /
    • 2012
  • This study analyzed factors affecting daily travel times at each stage of commuters' life cycle. In this study, travel times were dealt with in the context of trip chain. That is, the travel time was defined as the total amount of time commuters had spent to move for daily activities from leaving to coming back home. A commuter's life cycle was divided into 6 stages on a basis of both householder's age and family type: i.e., the unmarried youth period, the family forming period, the children education period, the children youth period, the children independence period, and the aged period. Variables such as commuting times, home-based trip cycle recurrences, and the number of stops differed for each stage of life cycle, the latter of which represents how many places a commuter dropped by during a trip cycle. Several factors were found to affect commuting times at each stage of life cycle as a result of applying a Cox proportional hazard model. The empirical study was conducted using 2010' household travel survey data collected from Gyeonggi-do.

Analysis of Hypertension Risk Factors by Life Cycle Based on Machine Learning (머신러닝 기반 생애주기별 고혈압 위험 요인 분석)

  • Kang, SeongAn;Kim, SoHui;Ryu, Min Ho
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.27 no.5
    • /
    • pp.73-82
    • /
    • 2022
  • Chronic diseases such as hypertension require a differentiated approach according to age and life cycle. Chronic diseases such as hypertension require differentiated management according to the life cycle. It is also known that the cause of hypertension is a combination of various factors. This study uses machine learning prediction techniques to analyze various factors affecting hypertension by life cycle. To this end, a total of 35 variables were used through preprocessing and variable selection processes for the National Health and Nutrition Survey data of the Korea Centers for Disease Control and Prevention. As a result of the study, among the tree-based machine learning models, XGBoost was found to have high predictive performance in both middle and old age. Looking at the risk factors for hypertension by life cycle, individual characteristic factors, genetic factors, and nutritional intake factors were found to be risk factors for hypertension in the middle age, and nutritional intake factors, dietary factors, and lifestyle factors were derived as risk factors for hypertension. The results of this study are expected to be used as basic data useful for hypertension management by life cycle.

Development of Lifecycle Model for Copyright Infringement Site (저작권 침해 사이트 생애 주기 모델 개발)

  • Kim, Deuk-Hun;Jeong, Hae-Seon;Kwak, Jin
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.30 no.1
    • /
    • pp.101-121
    • /
    • 2020
  • Technology and culture are converging with various industries to create added value of contents. In addition, the country is creating a foundation environment for grafting new technologies onto the cultural content. However, copyright infringement by voice demand and supply is continuously occurring for cultural contents with copyright, and more and more recently, there have been increasing cases of creating and operating sites with servers overseas to bypass monitoring on infringement sites. To prevent this, various copyright protection studies are under way in many areas, but the current detection and prevention technologies are largely reactive and therefore have problems of effectiveness. Accordingly, this paper proposes a model of the lifecycle of copyright infringement site to lay the foundation for preemptive response to the distribution of illegal copies through analysis of the lifecycle of copyright infringement site.

Optimum Maintenance and Retrofit Planning for Reliable Seismic Performance of the Bridges (내진성능확보를 위한 교량의 최적유지보수계획법)

  • 고현무;이선영;박관순;김동석
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.6 no.5
    • /
    • pp.29-36
    • /
    • 2002
  • In the maintenance and retrofit planning of a bridge system, the optimal strategy for inspection and repair are suggested by minimizing the expected total life-cycle cost, which includes the initial cost, the costs of inspection, repair, and failure. Degradation of seismic performance is modeled by using a damage function. And failure probability is computed according to the degree of damage detection by random vibration theory and the event tree analysis. As an example to illustrate the proposed approach, a 10-span continuous bridge structure is used. The numerical results show that the optimum number of the inspection and the repair are increased, as the seismic intensity is increased and the soil condition of a site becomes more flexible.